AB 625: Forest biomass: management: emissions: energy.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2023-04-12
Current Status:
Failed
(2024-02-01: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
What does this bill do?
The bill creates a Forest Biomass Waste Utilization Program in the State Board of Forestry’s Joint Institute to plan turning wood removed for wildfire fuel reduction into products, fuels, electricity and soil amendments and to develop worker training, affecting state agencies, forest communities, and bioenergy developers. It also directs the Energy Commission to evaluate bioenergy technologies and whether forest biomass can supply firm renewable power, requires the Air Resources Board to measure greenhouse gases and short‑lived pollutants from wildfire, pile burning and forest management, and extends the BioMAT feed‑in tariff until local public power agencies' participation is resolved.
The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.
(1)Existing law establishes in the Natural Resources Agency the Department of Forestry and Fire Protection (CAL-FIRE), and requires CAL-FIRE to be responsible for, among other things, fire protection and prevention, as provided. Existing law establishes the State Board of Forestry and Fire Protection in CAL-FIRE to represent the states interest in the acquisition and management of state forests and requires the board to maintain an adequate forest policy. The former Governor, Edmund G. Brown Jr., issued Executive Order No. B-52-18 that, among other things, established a Forest Management Task Force, now known as the Wildfire and Forest Resilience Task Force, involving specified state agencies to create the action plan for wildfire and forest resilience. The executive order also established a Joint Institute for Wood Products Innovation, to be located within the state board.
This bill would establish the Forest Biomass Waste Utilization Program to be administered by the state boards Joint Institute for Wood Products Innovation to develop an implementation plan to meet the goals and recommendations of, and the comprehensive framework to align with the states wood utilization policies and priorities and focused market strategy of, specified statewide forest management plans, and to develop a workforce training program to complement the workforce needs associated with the implementation plan. The bill would require the state board, in coordination with the Wildfire and Forest Resilience Task Force, to submit an annual report to the Legislature, beginning January 1, 2025, on the progress made on implementing the implementation plan.
This bill would require the Natural Resources Agency, in furtherance of the program, to facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
(2)The Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) and requires the Energy Commission to undertake various actions in furtherance of meeting the states clean energy and pollution reduction objectives. Existing law requires the Energy Commission, in consultation with specified state and federal agencies and at least every 2 years, to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. Existing law requires the Energy Commission, in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information.
This bill would require the Energy Commission, in furtherance of the Forest Biomass Waste Utilization Program, to prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that use forest biomass waste, as specified. The bill would also require the Energy Commission to include, as part of the 2025 edition of the integrated policy report, an assessment of the potential for forest biomass waste energy to provide firm renewable power.
(3)The California Global Warming Solutions Act of 2006 designates the State Air Resources Board (state air board) as the state agency charged with monitoring and regulating sources of emissions of greenhouse gases. The act requires the state air board to adopt a statewide greenhouse gas emissions limit, as specified, and to adopt rules and regulations in an open public process to achieve the maximum technologically feasible and cost-effective greenhouse gas emission reductions. The act requires the state air board to develop, on or before December 31, 2020, and every 5 years thereafter, a report that assesses greenhouse gas emission associated with wildfire and forest management activities. The act requires the state air board to prepare, approve, and update at least once every 5 years, beginning on January 1, 2009, a scoping plan for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases under the act.
This bill would require the state air board, in the report developed on or before December 31, 2025, and every 5 years thereafter, to include, among other things, a methodology to quantify the greenhouse gas and short-lived climate pollutant emissions from wildfire, pile burning, and forest management activities, as specified. The bill would also require the state air board to consider the results of that report, as applicable, in the next update of the scoping plan.
(4)Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations. The California Renewables Portfolio Standard Program requires every electrical corporation to file with the PUC a standard tariff for electricity generated by an electric generation facility, as defined, that qualifies for the tariff, is owned and operated by a retail customer of the electrical corporation, and is located within the service territory of, and developed to sell electricity to, the electrical corporation. The PUC refers to this requirement as the renewable feed-in tariff. The renewable feed-in tariff law, in part, requires the PUC to direct the electrical corporations, collectively, to procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. Pursuant to this requirement, the PUC has established and revised the Bioenergy Market Adjusting Tariff (BioMAT) program. Existing law authorizes a community choice aggregator to submit eligible projects for cost recovery pursuant to the BioMAT program, as specified.
This bill would require the PUC to continue the BioMAT program until the implementation of the provisions authorizing community choice aggregators to participate in the program has been resolved as specified, and adequate time is given to community choice aggregators to participate in the program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
(5)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)Existing law establishes in the Natural Resources Agency the Department of Forestry and Fire Protection (CAL-FIRE), and requires CAL-FIRE to be responsible for, among other things, fire protection and prevention, as provided. Existing law establishes the State Board of Forestry and Fire Protection in CAL-FIRE to represent the states interest in the acquisition and management of state forests and requires the board to maintain an adequate forest policy. The former Governor, Edmund G. Brown Jr., issued Executive Order No. B-52-18 that, among other things, established a Forest Management Task Force, now known as the Wildfire and Forest Resilience Task Force, involving specified state agencies to create the action plan for wildfire and forest resilience. The executive order also established a Joint Institute for Wood Products Innovation, to be located within the state board.
This bill would establish the Forest Waste Biomass Waste Utilization Program to be administered by the state boards Joint Institute for Wood Products Innovation to develop an implementation plan to meet the goals and recommendations of, and the comprehensive framework to align with the states wood utilization policies and priorities and focused market strategy of, specified statewide forest management plans, and to develop a workforce training program to complement the workforce needs associated with the implementation plan. The bill would require the state board, in coordination with the Wildfire and Forest Resilience Task Force, to submit an annual report to the Legislature, beginning January 1, 2025, on the progress made on implementing the implementation plan.
This bill would require the Natural Resources Agency, in furtherance of the program, to facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
(2)The Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) and requires the Energy Commission to undertake various actions in furtherance of meeting the states clean energy and pollution reduction objectives. Existing law requires the Energy Commission, in consultation with specified state and federal agencies and at least every 2 years, to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. Existing law requires the Energy Commission, in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information.
This bill would require the Energy Commission, in furtherance of the Forest Waste Biomass Waste Utilization Program, to prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that use forest biomass waste, as specified. The bill would also require the Energy Commission to include, as part of the 2025 edition of the integrated policy report, and each report adopted biennially thereafter, an assessment of the potential for forest biomass waste energy to provide firm renewable power.
(3)The California Global Warming Solutions Act of 2006 designates the State Air Resources Board (state air board) as the state agency charged with monitoring and regulating sources of emissions of greenhouse gases. The act requires the state air board to adopt a statewide greenhouse gas emissions limit, as specified, and to adopt rules and regulations in an open public process to achieve the maximum technologically feasible and cost-effective greenhouse gas emission reductions. The act requires the state air board to develop, on or before December 31, 2020, and every 5 years thereafter, a report that assesses greenhouse gas emission associated with wildfire and forest management activities. The act requires the state air board to prepare, approve, and update at least once every 5 years, beginning on January 1, 2009, a scoping plan for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases under the act.
This bill would require the state air board, in the report developed on or before December 31, 2025, and every 5 years thereafter, to include, among other things, a methodology to quantify the greenhouse gas and short-lived climate pollutant emissions from wildfire, pile burning, and forest management activities, as specified. The bill would also require the state air board to consider the results of that report, as applicable, in the next update of the scoping plan.
(4)Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations. The California Renewables Portfolio Standard Program requires every electrical corporation to file with the PUC a standard tariff for electricity generated by an electric generation facility, as defined, that qualifies for the tariff, is owned and operated by a retail customer of the electrical corporation, and is located within the service territory of, and developed to sell electricity to, the electrical corporation. The PUC refers to this requirement as the renewable feed-in tariff. The renewable feed-in tariff law, in part, requires the PUC to direct the electrical corporations, collectively, to procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. Pursuant to this requirement, the PUC has established and revised the Bioenergy Market Adjusting Tariff (BioMAT) program. Existing law authorizes a community choice aggregator to submit eligible projects for cost recovery pursuant to the BioMAT program, as specified.
This bill would require the PUC to continue the BioMAT program until the 250 megawatts are procured. implementation of the provisions authorizing community choice aggregators to participate in the program has been resolved as specified, and adequate time is given to community choice aggregators to participate in the program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The(5)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)Existing law establishes in the Natural Resources Agency the Department of Forestry and Fire Protection (CAL-FIRE), and requires CAL-FIRE to be responsible for, among other things, fire protection and prevention, as provided. Existing law establishes the State Board of Forestry and Fire Protection in CAL-FIRE to represent the states interest in the acquisition and management of state forests and requires the board to maintain an adequate forest policy. The former Governor, Edmund G. Brown Jr., issued Executive Order No. B-52-18 that, among other things, established a Forest Management Task Force, now known as the Wildfire and Forest Resilience Task Force, involving specified state agencies to create the action plan for wildfire and forest resilience. The executive order also established a Joint Institute for Wood Products Innovation, to be located within the state board.
This bill would establish the Forest Waste Biomass Utilization Program to be administered by the state boards Joint Institute for Wood Products Innovation to develop an implementation plan to meet the goals and recommendations of, and the comprehensive framework to align with the states wood utilization policies and priorities and focused market strategy of, specified statewide forest management plans, and to develop a workforce training program to complement the workforce needs associated with the implementation plan. The bill would require the state board, in coordination with the Wildfire and Forest Resilience Task Force, to submit an annual report to the Legislature, beginning January 1, 2025, on the progress made on implementing the implementation plan.
This bill would require the Natural Resources Agency, in furtherance of the program, to facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
(2)The Warren-Alquist State Energy Resources Conservation and Development Act establishes the State Energy Resources Conservation and Development Commission (Energy Commission) and requires the Energy Commission to undertake various actions in furtherance of meeting the states clean energy and pollution reduction objectives. Existing law requires the Energy Commission, in consultation with specified state and federal agencies and at least every 2 years, to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. Existing law requires the Energy Commission, in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information.
This bill would require the Energy Commission, in furtherance of the Forest Waste Biomass Utilization Program, to prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that use forest biomass waste, as specified. The bill would also require the Energy Commission to include, as part of the 2025 edition of the integrated policy report, and each report adopted biennially thereafter, an assessment of the potential for forest biomass waste energy to provide firm renewable power.
(3)The California Global Warming Solutions Act of 2006 designates the State Air Resources Board (state air board) as the state agency charged with monitoring and regulating sources of emissions of greenhouse gases. The act requires the state air board to adopt a statewide greenhouse gas emissions limit, as specified, and to adopt rules and regulations in an open public process to achieve the maximum technologically feasible and cost-effective greenhouse gas emission reductions. The act requires the state air board to develop, on or before December 31, 2020, and every 5 years thereafter, a report that assesses greenhouse gas emission associated with wildfire and forest management activities. The act requires the state air board to prepare, approve, and update at least once every 5 years, beginning on January 1, 2009, a scoping plan for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases under the act.
This bill would require the state air board, in the report developed on or before December 31, 2025, and every 5 years thereafter, to include, among other things, a methodology to quantify the greenhouse gas and short-lived climate pollutant emissions from wildfire, pile burning, and forest management activities, as specified. The bill would also require the state air board to consider the results of that report, as applicable, in the next update of the scoping plan.
(4)Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations. The California Renewables Portfolio Standard Program requires every electrical corporation to file with the PUC a standard tariff for electricity generated by an electric generation facility, as defined, that qualifies for the tariff, is owned and operated by a retail customer of the electrical corporation, and is located within the service territory of, and developed to sell electricity to, the electrical corporation. The PUC refers to this requirement as the renewable feed-in tariff. The renewable feed-in tariff law, in part, requires the PUC to direct the electrical corporations, collectively, to procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. Pursuant to this requirement, the PUC has established and revised the Bioenergy Market Adjusting Tariff (BioMAT) program.
This bill would require the PUC to continue the BioMAT program until the 250 megawatts are procured.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Legislature finds and declares all of the following:
(a)Reducing wildfire severity and restoring healthy and resilient forests requires active forest management, including forest thinning and fuel removal in high fire hazard severity zones.
(b)Senate Bill 901 (Chapter 626 of the Statutes of 2018) calls upon California to significantly increase the amount of forest fuel removal for wildfire mitigation.
(c)The 2020 Forest Stewardship Agreement between California and the United States Forest Service commits to scaling up vegetation treatment of forests and wildlands to 1,000,000 acres per year by 2025.
(d)The Joint Institute Recommendations to Expand Wood and Biomass Utilization in California, issued by the State Board of Forestry and Fire Protections Joint Institute for Wood Products Innovation in November 2020, found that meeting fuel removal requirements would generate tens of millions of tons of dry forest waste annually, and provided recommendations for the beneficial use of forest biomass waste.
(e)Implementing the recommendations of the Joint Institute Recommendations to Expand Wood and Biomass Utilization in California will reduce the need for the piling and burning of forest waste, and would instead generate useful wood products, renewable energy, low carbon fuels, biochar, and other soil amendments, while reducing wildfire risk.
(f)Californias Wildfire and Forest Resilience Action Plan, issued by the Governors Forest Management Task Force in January 2021, requires the Office of Planning and Research, among other state agencies, to develop a comprehensive framework to align the states wood utilization policies and priorities, including a comprehensive set of metrics to evaluate biomass availability, usage, investments, and workforce levels to create a sustainable wood products market in the state. That plan also requires the Governors Office of Business and Economic Development to develop a focused market strategy.
(g)According to the California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate, issued by the Forest Climate Action Team in 2018 and adopted by the California Environmental Protection Agency, Natural Resources Agency, and Department of Forestry and Fire Protection, converting waste biomass to energy cuts emissions of particulate matter, methane, and carbon monoxide by 98 percent, and significantly reduces black carbon and other pollutants, in comparison to open-pile burning.
(h)According to Getting to Neutral: Options for Negative Carbon Emissions in California, a report prepared by the Lawrence Livermore National Laboratory and released in 2020, converting forest waste to hydrogen, electricity, and other renewable fuels can provide significant carbon negative emissions needed to reach carbon neutrality by 2045.
(i)Forest biomass waste utilization will create jobs and economic development in many of the poorest regions of the state, increase energy resilience in the communities that are most vulnerable to power disruptions, and help to create a circular economy in Californias forested communities.
SEC. 2.Section 38535 of the Health and Safety Code is amended to read:38535.The state board, in consultation with the California Department of Forestry and Fire Protection, shall develop all of the following:
(a)A standardized system for quantifying the direct carbon emissions and decay from fuel reduction activities for purposes of meeting the accounting requirements for Greenhouse Gas Reduction Fund expenditures. This system may include standardized lookup tables by forest stand type, including for oak woodland forests, and harvest or other management prescriptions. The system shall acknowledge that certain expenditures, such as for planning, analysis, modeling, or outreach, will not have a direct greenhouse gas reduction benefit, but will facilitate necessary climate preparedness activities that will have direct greenhouse gas benefits.
(b)In consultation with academic experts, a historic baseline of greenhouse gas emissions from Californias natural fire regime reflecting conditions before modern fire suppression. This shall be completed on or before December 31, 2020. The baseline may be included within the state boards natural working lands inventory.
(c)On or before December 31, 2025, and every five years thereafter, a report that assesses greenhouse gas emissions associated with wildfire and forest management activities. The report shall include both of the following:
(1)A methodology to quantify the greenhouse gas and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning, and forest management activities.
(2)A list of the data needed to use the methodology prepared pursuant to paragraph (1).
SEC. 3.Section 38561 of the Health and Safety Code is amended to read:38561.(a)On or before January 1, 2009, the state board shall prepare and approve a scoping plan, as that term is understood by the state board, for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases by 2020 under this division. The state board shall consult with all state agencies with jurisdiction over sources of greenhouse gases, including the Public Utilities Commission and the State Energy Resources Conservation and Development Commission, on all elements of its plan that pertain to energy-related matters, including, but not limited to, electrical generation, load-based standards or requirements, the provision of reliable and affordable electrical service, petroleum refining, and statewide fuel supplies to ensure the greenhouse gas emissions reduction activities to be adopted and implemented by the state board are complementary, nonduplicative, and can be implemented in an efficient and cost-effective manner.(b)The plan shall identify and make recommendations on direct emissions reduction measures, alternative compliance mechanisms, market-based compliance mechanisms, and potential monetary and nonmonetary incentives for sources and categories of sources that the state board finds are necessary or desirable to facilitate the achievement of the maximum feasible and cost-effective reductions of greenhouse gas emissions by 2020.(c)In making the determinations required by subdivision (b), the state board shall consider all relevant information pertaining to greenhouse gas emissions reduction programs in other states, localities, and nations, including the northeastern states of the United States, Canada, and the European Union.(d)The state board shall evaluate the total potential costs and total potential economic and noneconomic benefits of the plan for reducing greenhouse gases to Californias economy, environment, and public health, using the best available economic models, emission estimation techniques, and other scientific methods.(e)In developing its plan, the state board shall take into account the relative contribution of each source or source category to statewide greenhouse gas emissions, and the potential for adverse effects on small businesses, and shall recommend a de minimis threshold of greenhouse gas emissions below which emissions reduction requirements will not apply.(f)In developing its plan, the state board shall identify opportunities for emissions reduction measures from all verifiable and enforceable voluntary actions, including, but not limited to, carbon sequestration projects and best management practices.(g)In developing its plan, the state board shall consider the results of the latest report issued pursuant to subdivision (c) of Section 38535, as applicable. (h)The state board shall conduct a series of public workshops to give interested parties an opportunity to comment on the plan. The state board shall conduct a portion of these workshops in regions of the state that have the most significant exposure to air pollutants, including, but not limited to, areas designated as federal extreme nonattainment that have communities with minority populations, communities with low-income populations, or both.(i)The state board shall update its plan for achieving the maximum technologically feasible and cost-effective reductions of greenhouse gas emissions at least once every five years.SEC. 4.SEC. 3.Article 3.5 (commencing with Section 4139) is added to Chapter 1 of Part 2 of Division 4 of the Public Resources Code, to read:3.5.Forest Biomass Waste Utilization Program4139.For purposes of this article, the following definitions apply:
(a)California Forest Carbon Plan means the California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate issued by the California Environmental Protection Agency, the Natural Resources Agency, and the Department of Forestry and Fire Protection in May 2018.
(b)Forest Biomass Waste Utilization Plan means the Joint Institute Recommendations to Expand Wood and Biomass Utilization in California report issued by the boards Joint Institute for Wood Products Innovation in November 2020.
(c)Forest biomass waste is forest biomass that is removed to reduce or mitigate the risk of wildfire, reduce the risks to public safety or infrastructure from falling trees or tree limbs, or create defensible space, or for forest restoration projects.
(d)Program means the Forest Biomass Waste Utilization Program established pursuant to Section 4140.
(e)Wildfire and Forest Resilience Action Plan means the California Wildfire and Forest Resilience Action Plan issued by the Governors Forest Management Task Force in January 2021.
4140.(a)The Forest Biomass Waste Utilization Program is hereby established in the boards Joint Institute for Wood Products Innovation. The program shall do all of the following:
(1)Develop an implementation plan, in coordination with the Wildfire and Forest Resilience Task Force, Office of Planning and Research, Governors Office of Business and Economic Development, Department of Toxic Substances Control, Department of Conservation, State Energy Resources Conservation and Development Commission, and Public Utilities Commission, to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan, and the comprehensive framework to align the states wood utilization policies and priorities and the focused market strategy required by the Wildfire and Forest Resilience Action Plan. The implementation plan shall do both of the following:
(A)Identify, with particular emphasis on the development of new forest biomass waste utilization projects on developed property that is located near forested land that sources forest biomass waste, funding needs, gaps in research and demonstration, necessary regulatory changes, and other needs.
(B)Adopt best practices for biomass feedstock aggregation that are consistent with the recommendations of the Office of Planning and Research.
(2)(A)In collaboration with governmental, nonprofit, and for-profit entities that have expertise in workforce development, including, but not limited to, the California Community College system and the California Workforce Development Board, develop a workforce training program that will complement the workforce needs associated with implementation of the biomass utilization program.
(B)The workforce training program developed pursuant to subparagraph (A) shall include recommendations that address barriers that impact the hiring of new workers, including, but not limited to, high insurance premiums associated with newly trained drivers.
(b)Beginning January 1, 2025, and on or before every January 1 thereafter, the board, in coordination with the Wildfire and Forest Resilience Task Force, shall prepare and submit an annual report to the Legislature on the progress made on implementing the implementation plan developed pursuant to paragraph (1) of subdivision (a).
(c) A report to be submitted pursuant to subdivision (b) shall be submitted in compliance with Section 9795 of the Government Code.
4140.1.In furtherance of the program, the Natural Resources Agency shall facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
4140.2.In furtherance of the program, the State Energy Resources Conservation and Development Commission shall, in coordination with the department, Natural Resources Agency, and Department of Conservation, consider funding qualifying projects pursuant to the Clean Transportation Program (Article 2 (commencing with Section 44272) of Chapter 8.9 or Part 5 of Division 26 of the Health and Safety Code) that use forest biomass waste for advanced biofuel technology development, including, but not limited to, projects that use noncombustion conversion technologies for electrical vehicle charging or hydrogen vehicle fueling.
4140.3.(a)In furtherance of the program, the State Energy Resources Conservation and Development Commission shall, in coordination with the Natural Resources Agency and the Department of Conservation, prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that utilize forest biomass waste. The report shall present recommendations, where appropriate, for opportunities to maximize environmental performance, grid reliability benefits, and value to electricity ratepayers. The report shall assess the potential to facilitate the use of forest biomass waste produced within fire-threat areas, as identified by the Public Utilities Commission, to support the integration of innovative biomass power for the purpose of supporting rural microgrids, or providing other grid support, or both, including an assessment of any technological or feasible challenges, including, but not limited to, challenges associated with reliability and fueling concerns. The report may include a review of, and recommendations for, alternative programming or financing considerations.
(b)(1)A report to be submitted pursuant to this section shall be submitted in compliance with Section 9795 of the Government Code.
(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2028.
SEC. 5.SEC. 4.Section 25302.3 is added to the Public Resources Code, to read:25302.3.(a)As part of the 2025 edition of the integrated energy policy report the commission shall include an assessment of the potential for forest biomass waste energy to provide firm renewable power.
(b)For the purposes of this section, forest biomass waste means the same as defined in Section 4139 of the Public Resources Code.
SEC. 6.SEC. 5.Section 399.20 of the Public Utilities Code is amended to read:399.20.(a)(1)It is the policy of this state and the intent of the Legislature to encourage electrical generation from eligible renewable energy resources.
(2)Paragraph (5) of subdivision (f) is appropriate because the program is a fixed-price feed-in tariff program with no pricing discretion.
(3)This section does not authorize cost recovery by an entity other than an electrical corporation regulated by the commission, except for the procurement authorized in paragraph (5) of subdivision (f).
(b)As used in this section, electric generation facility means an electric generation facility located within the service territory of an electrical corporation, and developed to sell electricity to, an electrical corporation or, for a bioenergy electric generation facility, to an electrical corporation or a community choice aggregator that provides electric service within the service territory of the electrical corporation that meets all of the following criteria:
(1)Has an effective capacity of not more than three megawatts, with the exception of those facilities participating in a tariff made available pursuant to paragraph (2) of subdivision (f).
(2)Is interconnected and operates in parallel with the electrical transmission and distribution grid.
(3)(A)Except as provided in subparagraph (B), is strategically located and interconnected to the electrical transmission and distribution grid in a manner that optimizes the deliverability of electricity generated at the facility to load centers.
(B)For purposes of paragraph (2) of subdivision (f), is strategically located and interconnected to the electrical transmission and distribution grid in a manner that optimizes the deliverability of electricity generated at the facility to load centers or is interconnected to an existing transmission line.
(4)Is an eligible renewable energy resource.
(c)Every electrical corporation shall file with the commission a standard tariff for electricity purchased from an electric generation facility. The commission may modify or adjust the requirements of this section for any electrical corporation with less than 100,000 service connections, as individual circumstances merit.
(d)(1)The tariff shall provide for payment for every kilowatthour of electricity purchased from an electric generation facility for a period of 10, 15, or 20 years, as authorized by the commission. The payment shall be the market price determined by the commission pursuant to paragraph (2) and shall include all current and anticipated environmental compliance costs, including, but not limited to, mitigation of emissions of greenhouse gases and air pollution offsets associated with the operation of new generating facilities in the local air pollution control or air quality management district where the electric generation facility is located.
(2)The commission shall establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with an electric generation facility, in consideration of the following:
(A)The long-term market price of electricity for fixed price contracts, determined pursuant to an electrical corporations general procurement activities as authorized by the commission.
(B)The long-term ownership, operating, and fixed-price fuel costs associated with fixed-price electricity from new generating facilities.
(C)The value of different electricity products including baseload, peaking, and as-available electricity.
(3)The commission may adjust the payment rate to reflect the value of every kilowatthour of electricity generated on a time-of-delivery basis.
(4)The commission shall ensure, with respect to rates and charges, that ratepayers that do not receive service pursuant to the tariff are indifferent to whether a ratepayer with an electric generation facility receives service pursuant to the tariff.
(e)An electrical corporation shall provide expedited interconnection procedures to an electric generation facility located on a distribution circuit that generates electricity at a time and in a manner so as to offset the peak demand on the distribution circuit, if the electrical corporation determines that the electric generation facility will not adversely affect the distribution grid. The commission shall consider and may establish a value for an electric generation facility located on a distribution circuit that generates electricity at a time and in a manner so as to offset the peak demand on the distribution circuit.
(f)(1)An electrical corporation shall make the tariff available to the owner or operator of an electric generation facility within the service territory of the electrical corporation, upon request, on a first-come-first-served basis, until the electrical corporation meets its proportionate share of a statewide cap of 750 megawatts cumulative rated generation capacity served under this section and Section 399.32. The proportionate share shall be calculated based on the ratio of the electrical corporations peak demand compared to the total statewide peak demand.
(2)By June 1, 2013, the commission shall, in addition to the 750 megawatts identified in paragraph (1), direct the electrical corporations to collectively procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. The commission shall, for each electrical corporation, allocate shares of the additional 250 megawatts based on the ratio of each electrical corporations peak demand compared to the total statewide peak demand. In implementing this paragraph, the commission shall do all of the following:
(A)Allocate the 250 megawatts identified in this paragraph among the electrical corporations based on the following categories:
(i)For biogas from wastewater treatment, municipal organic waste diversion, food processing, and codigestion, 110 megawatts.
(ii)For dairy and other agricultural bioenergy, 90 megawatts.
(iii)For bioenergy using byproducts of sustainable forest management, 50 megawatts. Allocations under this category shall be determined based on the proportion of bioenergy that sustainable forest management providers derive from sustainable forest management in fire threat treatment areas, as designated by the Department of Forestry and Fire Protection.
(B)Direct the electrical corporations to develop standard contract terms and conditions that reflect the operational characteristics of the projects, and to provide a streamlined contracting process.
(C)Coordinate, to the maximum extent feasible, any incentive or subsidy programs for bioenergy with the agencies listed in subparagraph (A) of paragraph (3) in order to provide maximum benefits to ratepayers and to ensure that incentives are used to reduce contract prices.
(D)The commission shall encourage gas and electrical corporations to develop and offer programs and services to facilitate development of in-state biogas for a broad range of purposes.
(E)Direct the electrical corporations to authorize a bioenergy electric generation facility with an effective capacity of up to five megawatts to participate in the tariff made available pursuant to this paragraph, if it meets the following conditions:
(i)It delivers no more than three megawatts to the grid at any time.
(ii)It complies with the electrical corporations Electric Rule 21 tariff or other distribution access tariff.
(F)Payment is made pursuant to paragraph (1) of subdivision (d) and no payment is made for any electricity delivered to the grid in excess of three megawatts at any time.
(3)(A)The commission, in consultation with the Energy Commission, the State Air Resources Board, the Department of Forestry and Fire Protection, the Department of Food and Agriculture, and the Department of Resources Recycling and Recovery, may review the allocations of the 250 additional megawatts identified in paragraph (2) to determine if those allocations are appropriate.
(B)If the commission finds that the allocations of the 250 additional megawatts identified in paragraph (2) are not appropriate, the commission may reallocate the 250 megawatts among the categories established in subparagraph (A) of paragraph (2).
(4)(A)A project identified in clause (iii) of subparagraph (A) of paragraph (2) is eligible, in regards to interconnection, for the tariff established to implement paragraph (2) or to participate in any program or auction established to implement paragraph (2), if it meets at least one of the following requirements:
(i)The project is already interconnected.
(ii)The project has been found to be eligible for interconnection pursuant to the fast track process under the relevant tariff.
(iii)A system impact study or other interconnection study has been completed for the project under the relevant tariff, and there was no determination in the study that, with the identified interconnection upgrades, if any, a condition specified in paragraph (2), (3), or (4) of subdivision (n) would exist. Such a project is not required to have a pending, active interconnection application to be eligible.
(B)For a project meeting the eligibility requirements pursuant to clause (iii) of subparagraph (A) of this paragraph, both of the following apply:
(i)The project is hereby deemed to be able to interconnect within the required time limits for the purpose of determining eligibility for the tariff.
(ii)The project shall submit a new application for interconnection within 30 days of execution of a standard contract pursuant to the tariff if it does not have a pending, active interconnection application or a completed interconnection. For those projects, the time to achieve commercial operation shall begin to run from the date when the new system impact study or other interconnection study is completed rather than from the date of execution of the standard contract.
(5)(A)A community choice aggregator may submit eligible bioenergy projects to the commission for cost recovery if open capacity exists within an allocation category described in subparagraph (A) of paragraph (2) and the community choice aggregator submits an eligible tariff to the commission consistent with both of the following:
(i)The community choice aggregator files with the commission a standard tariff for electricity purchased from a bioenergy electric generation facility.
(ii)(I)The tariff provides for payment for every kilowatthour of electricity purchased from a bioenergy electric generation facility for a period of 10, 15, or 20 years, as authorized by the commission. The payment shall be the market price determined by the commission pursuant to subclause (II) and shall include all current and anticipated environmental compliance costs, including, but not limited to, mitigation of emissions of greenhouse gases and air pollution offsets associated with the operation of new generating facilities in the local air pollution control or air quality management district where the bioenergy electric generation facility is located.
(II)The commission shall establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with a bioenergy electric generation facility, considering those matters described in paragraph (2) of subdivision (d).
(iii)Any capacity procured by the community choice aggregator from a bioenergy project that is approved by the commission pursuant to this paragraph shall reduce the procurement targets for that allocation category ordered by the commission for the electrical corporation whose service territory encompasses the community choice aggregator pursuant to paragraph (2), or as modified pursuant to paragraph (3).
(B)Before acting pursuant to the authorization in subparagraph (A), a community choice aggregator shall develop standard contract terms and conditions that reflect the operational characteristics of the bioenergy electric generation facility and provide a streamlined contracting process. A community choice aggregator shall use the standard contract approved by the commission for use by the electrical corporation pursuant to subparagraph (B) of paragraph (2) to comply with this requirement, so long as all the terms and conditions of the contract are not modified by the community choice aggregator.
(C)In implementing this paragraph, the commission shall do all of the following:
(i)Coordinate, to the maximum extent feasible, any incentive or subsidy programs for bioenergy with the agencies listed in subparagraph (A) of paragraph (3) in order to provide maximum benefits to ratepayers and to ensure that incentives are used to reduce contract prices.
(ii)Direct a participating community choice aggregator to authorize a bioenergy electric generation facility with an effective capacity of up to five megawatts to participate in the tariff made available pursuant to this paragraph if it meets the following conditions:
(I)It delivers no more than three megawatts to the grid at any time.
(II)It complies with the Electric Rule 21 tariff or other distribution access tariff of the electrical corporation whose service territory it is located in.
(iii)Ensure payment is made pursuant to clause (ii) of subparagraph (A) and no payment is made for any electricity delivered to the grid in excess of three megawatts at any time.
(D)The community choice aggregator may make the terms of the tariff available to owners and operators of a bioenergy electric generation facility in the form of a standard contract subject to commission approval. To comply with this requirement, the community choice aggregator may base its tariff on the electrical corporations approved tariff, so long as all the terms and conditions of the tariff are not modified by the community choice aggregator.
(E)Every kilowatthour of electricity purchased from a bioenergy electric generation facility shall count toward meeting the community choice aggregators renewables portfolio standard annual procurement targets for purposes of paragraph (1) of subdivision (b) of Section 399.15.
(F)The physical generating capacity of a bioenergy electric generation facility shall count toward the community choice aggregators resource adequacy requirement for purposes of Section 380.
(G)In order to ensure the safety and reliability of bioenergy electric generation facilities, the owner of a bioenergy electric generation facility receiving a tariff pursuant to this paragraph shall provide an inspection and maintenance report to the community choice aggregator at least once every other year. The inspection and maintenance report shall be prepared at the owners or operators expense by a California-licensed contractor who is not the owner or operator of the bioenergy electric generation facility. A California-licensed electrician shall perform the inspection of the electrical portion of the generation facility.
(H)The contract between the bioenergy electric generation facility receiving the tariff and the community choice aggregator shall contain provisions that ensure that construction of the bioenergy electric generating facility complies with all applicable state and local laws and building standards and utility interconnection requirements.
(I)Nothing in this paragraph changes the sole procurement responsibility of a community choice aggregator pursuant to paragraph (5) of subdivision (a) of Section 366.2.
(J)The commission may modify or adjust the requirements of this paragraph for any community choice aggregator with less than 100,000 customer accounts as individual circumstances merit.
(K)The commission has ongoing review authority over any contracts of community choice aggregators submitted pursuant to this section consistent with its review of the contracts of electrical corporations entered into pursuant to this section.
(6)The commission shall continue the Bioenergy Market Adjusting Tariff (BioMAT) program established pursuant to this subdivision until the implementation of paragraph (5) is resolved in commission proceeding R.22-10-010, and adequate time is given to community choice aggregators to participate in the program.
(7)For the purposes of this subdivision, bioenergy means biogas and biomass.
(g)The electrical corporation may make the terms of the tariff available to owners and operators of an electric generation facility in the form of a standard contract subject to commission approval.
(h)Every kilowatthour of electricity purchased from an electric generation facility shall count toward meeting the electrical corporations renewables portfolio standard annual procurement targets for purposes of paragraph (1) of subdivision (b) of Section 399.15.
(i)The physical generating capacity of an electric generation facility shall count toward the electrical corporations resource adequacy requirement for purposes of Section 380.
(j)(1)The commission shall establish performance standards for any electric generation facility that has a capacity greater than one megawatt to ensure that those facilities are constructed, operated, and maintained to generate the expected annual net production of electricity and do not impact system reliability.
(2)The commission may reduce the three megawatt capacity limitation of paragraph (1) of subdivision (b) if the commission finds that a reduced capacity limitation is necessary to maintain system reliability within the applicable electrical corporations service territory.
(k)(1)Any owner or operator of an electric generation facility that received ratepayer-funded incentives in accordance with Section 379.6 of this code, or with Section 25782 of the Public Resources Code, and participated in a net metering program pursuant to Sections 2827, 2827.9, and 2827.10 of this code before January 1, 2010, shall be eligible for a tariff or standard contract filed by an electrical corporation pursuant to this section.
(2)In establishing the tariffs or standard contracts pursuant to this section, the commission shall consider ratepayer-funded incentive payments previously received by the generation facility pursuant to Section 379.6 of this code or Section 25782 of the Public Resources Code. The commission shall require reimbursement of any funds received from these incentive programs to an electric generation facility, in order for that facility to be eligible for a tariff or standard contract filed by an electrical corporation pursuant to this section, unless the commission determines ratepayers have received sufficient value from the incentives provided to the facility based on how long the project has been in operation and the amount of renewable electricity previously generated by the facility.
(3)A customer that receives service under a tariff or contract approved by the commission pursuant to this section is not eligible to participate in any net metering program.
(l)An owner or operator of an electric generation facility electing to receive service under a tariff or contract approved by the commission shall continue to receive service under the tariff or contract until either of the following occurs:
(1)The owner or operator of an electric generation facility no longer meets the eligibility requirements for receiving service pursuant to the tariff or contract.
(2)The period of service established by the commission pursuant to subdivision (d) is completed.
(m)Within 10 days of receipt of a request for a tariff pursuant to this section from an owner or operator of an electric generation facility, the electrical corporation that receives the request shall post a copy of the request on its internet website. The information posted on the internet website shall include the name of the city in which the facility is located, but information that is proprietary and confidential, including, but not limited to, address information beyond the name of the city in which the facility is located, shall be redacted.
(n)An electrical corporation may deny a tariff request pursuant to this section if the electrical corporation makes any of the following findings:
(1)The electric generation facility does not meet the requirements of this section.
(2)The transmission or distribution grid that would serve as the point of interconnection is inadequate.
(3)The electric generation facility does not meet all applicable state and local laws and building standards and utility interconnection requirements.
(4)The aggregate of all electric generating facilities on a distribution circuit would adversely impact utility operation and load restoration efforts of the distribution system.
(o)Upon receiving a notice of denial from an electrical corporation, the owner or operator of the electric generation facility denied a tariff pursuant to this section shall have the right to appeal that decision to the commission.
(p)In order to ensure the safety and reliability of electric generation facilities, the owner of an electric generation facility receiving a tariff pursuant to this section shall provide an inspection and maintenance report to the electrical corporation at least once every other year. The inspection and maintenance report shall be prepared at the owners or operators expense by a California-licensed contractor who is not the owner or operator of the electric generation facility. A California-licensed electrician shall perform the inspection of the electrical portion of the generation facility.
(q)The contract between the electric generation facility receiving the tariff and the electrical corporation shall contain provisions that ensure that construction of the electric generating facility complies with all applicable state and local laws and building standards, and utility interconnection requirements.
(r)(1)All construction and installation of facilities of the electrical corporation, including at the point of the output meter or at the transmission or distribution grid, shall be performed only by that electrical corporation.
(2)All interconnection facilities installed on the electrical corporations side of the transfer point for electricity between the electrical corporation and the electrical conductors of the electric generation facility shall be owned, operated, and maintained only by the electrical corporation. The ownership, installation, operation, reading, and testing of revenue metering equipment for electric generating facilities shall only be performed by the electrical corporation.
SEC. 7.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Reducing wildfire severity and restoring healthy and resilient forests requires active forest management, including forest thinning and fuel removal in high fire hazard severity zones.
(b)Senate Bill 901 (Chapter 626 of the Statutes of 2018) calls upon California to significantly increase the amount of forest fuel removal for wildfire mitigation.
(c)The 2020 Forest Stewardship Agreement between California and the United States Forest Service commits to scaling up vegetation treatment of forests and wildlands to 1,000,000 acres per year by 2025.
(d)The Joint Institute Recommendations to Expand Wood and Biomass Utilization in California, issued by the State Board of Forestry and Fire Protections Joint Institute for Wood Products Innovation in November 2020, found that meeting fuel removal requirements would generate tens of millions of tons of dry forest waste annually, and provided recommendations for the beneficial use of forest biomass waste.
(e)Implementing the recommendations of the Joint Institute Recommendations to Expand Wood and Biomass Utilization in California will reduce the need for the piling and burning of forest waste, and would instead generate useful wood products, renewable energy, low carbon fuels, biochar biochar, and other soil amendments, while reducing wildfire risk.
(f)Californias Wildfire and Forest Resilience Action Plan, issued by the Governors Forest Management Task Force in January 2021, requires the Office of Planning and Research, among other state agencies, to develop a comprehensive framework to align the states wood utilization policies and priorities, including a comprehensive set of metrics to evaluate biomass availability, usage, investments, and workforce levels to create a sustainable wood products market in the state. That plan also requires the Governors Office of Business and Economic Development to develop a focused market strategy.
(g)According to the California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate, issued by the Forest Climate Action Team in 2018 and adopted by the California Environmental Protection Agency, Natural Resources Agency, and Department of Forestry and Fire Protection, converting waste biomass to energy cuts emissions of particulate matter, methane, and carbon monoxide by 98 percent, and significantly reduces black carbon and other pollutants, in comparison to open-pile burning.
(h)According to Getting to Neutral: Options for Negative Carbon Emissions in California, a report prepared by the Lawrence Livermore National Laboratory and released in 2020, converting forest waste to hydrogen, electricity, and other renewable fuels can provide significant carbon negative emissions needed to reach carbon neutrality by 2045.
(i)Forest biomass waste utilization will create jobs and economic development in many of the poorest regions of the state, increase energy resilience in the communities that are most vulnerable to power disruptions, and help to create a circular economy in Californias forested communities.
SEC. 2.Section 38535 of the Health and Safety Code is amended to read:38535.The state board, in consultation with the California Department of Forestry and Fire Protection, shall develop all of the following:
(a)A standardized system for quantifying the direct carbon emissions and decay from fuel reduction activities for purposes of meeting the accounting requirements for Greenhouse Gas Reduction Fund expenditures. This system may include standardized lookup tables by forest stand type, including for oak woodland forests, and harvest or other management prescriptions. The system shall acknowledge that certain expenditures, such as for planning, analysis, modeling, or outreach, will not have a direct greenhouse gas reduction benefit, but will facilitate necessary climate preparedness activities that will have direct greenhouse gas benefits.
(b)In consultation with academic experts, a historic baseline of greenhouse gas emissions from Californias natural fire regime reflecting conditions before modern fire suppression. This shall be completed on or before December 31, 2020. The baseline may be included within the state boards natural working lands inventory.
(c)On or before December 31, 2025, and every five years thereafter, a report that assesses greenhouse gas emissions associated with wildfire and forest management activities. The report shall include both of the following:
(1)A methodology to quantify the greenhouse gas and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning, and forest management activities.
(2)A list of the data needed to use the methodology prepared pursuant to paragraph (1).
SEC. 3.Section 38561 of the Health and Safety Code is amended to read:38561.(a)On or before January 1, 2009, the state board shall prepare and approve a scoping plan, as that term is understood by the state board, for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases by 2020 under this division. The state board shall consult with all state agencies with jurisdiction over sources of greenhouse gases, including the Public Utilities Commission and the State Energy Resources Conservation and Development Commission, on all elements of its plan that pertain to energy-related matters, including, but not limited to, electrical generation, load-based standards or requirements, the provision of reliable and affordable electrical service, petroleum refining, and statewide fuel supplies to ensure the greenhouse gas emissions reduction activities to be adopted and implemented by the state board are complementary, nonduplicative, and can be implemented in an efficient and cost-effective manner.
(b)The plan shall identify and make recommendations on direct emissions reduction measures, alternative compliance mechanisms, market-based compliance mechanisms, and potential monetary and nonmonetary incentives for sources and categories of sources that the state board finds are necessary or desirable to facilitate the achievement of the maximum feasible and cost-effective reductions of greenhouse gas emissions by 2020.
(c)In making the determinations required by subdivision (b), the state board shall consider all relevant information pertaining to greenhouse gas emissions reduction programs in other states, localities, and nations, including the northeastern states of the United States, Canada, and the European Union.
(d)The state board shall evaluate the total potential costs and total potential economic and noneconomic benefits of the plan for reducing greenhouse gases to Californias economy, environment, and public health, using the best available economic models, emission estimation techniques, and other scientific methods.
(e)In developing its plan, the state board shall take into account the relative contribution of each source or source category to statewide greenhouse gas emissions, and the potential for adverse effects on small businesses, and shall recommend a de minimis threshold of greenhouse gas emissions below which emissions reduction requirements will not apply.
(f)In developing its plan, the state board shall identify opportunities for emissions reduction measures from all verifiable and enforceable voluntary actions, including, but not limited to, carbon sequestration projects and best management practices.
(g)In developing its plan, the state board shall consider the results of the latest report issued pursuant to subdivision (c) of Section 38535, as applicable.
(h)The state board shall conduct a series of public workshops to give interested parties an opportunity to comment on the plan. The state board shall conduct a portion of these workshops in regions of the state that have the most significant exposure to air pollutants, including, but not limited to, areas designated as federal extreme nonattainment that have communities with minority populations, communities with low-income populations, or both.
(i)The state board shall update its plan for achieving the maximum technologically feasible and cost-effective reductions of greenhouse gas emissions at least once every five years.
SEC. 4.Article 3.5 (commencing with Section 4139) is added to Chapter 1 of Part 2 of Division 4 of the Public Resources Code, to read:3.5.Forest Biomass Waste Utilization Program4139.For purposes of this article, the following definitions apply:
(a)California Forest Carbon Plan means the California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate issued by the California Environmental Protection Agency, the Natural Resources Agency, and the Department of Forestry and Fire Protection in May 2018.
(b)Forest Biomass Waste Utilization Plan means the Joint Institute Recommendations to Expand Wood and Biomass Utilization in California report issued by the boards Joint Institute for Wood Products Innovation in November 2020.
(c)Forest biomass waste is forest biomass that is removed to reduce or mitigate the risk of wildfire, reduce the risks to public safety or infrastructure from falling trees or tree limbs, or create defensible space, or for forest restoration projects.
(d)Program means the Forest Biomass Waste Utilization Program established pursuant to Section 4140.
(e)Wildfire and Forest Resilience Action Plan means the California Wildfire and Forest Resilience Action Plan issued by the Governors Forest Management Task Force in January 2021.
4140.(a)The Forest Biomass Waste Utilization Program is hereby established in the boards Joint Institute for Wood Products Innovation. The program shall do all of the following:
(1)Develop an implementation plan, in coordination with the Wildfire and Forest Resilience Task Force, Office of Planning and Research, Governors Office of Business and Economic Development, Department of Toxic Substances Control, Department of Conservation, State Energy Resources Conservation and Development Commission, and Public Utilities Commission, to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan, and the comprehensive framework to align the states wood utilization policies and priorities and the focused market strategy required by the Wildfire and Forest Resilience Action Plan. The implementation plan shall do both of the following:
(A)Identify, with particular emphasis on the development of new forest biomass waste utilization projects on developed property that is located near forested land that sources forest biomass waste, funding needs, gaps in research and demonstration, necessary regulatory changes, and other needs.
(B)Adopt best practices for biomass feedstock aggregation that are consistent with the recommendations of the Office of Planning and Research.
(2)(A)In collaboration with governmental, nonprofit, and for-profit entities that have expertise in workforce development, including, but not limited to, the California Community College system and the California Workforce Development Board, develop a workforce training program that will complement the workforce needs associated with implementation of the biomass utilization program.
(B)The workforce training program developed pursuant to subparagraph (A) shall include recommendations that address barriers that impact the hiring of new workers, including, but not limited to, high insurance premiums associated with newly trained drivers.
(b)Beginning January 1, 2025, and on or before every January 1 thereafter, the board, in coordination with the Wildfire and Forest Resilience Task Force, shall prepare and submit an annual report to the Legislature on the progress made on implementing the implementation plan developed pursuant to paragraph (1) of subdivision (a).
(c) A report to be submitted pursuant to subdivision (b) shall be submitted in compliance with Section 9795 of the Government Code.
4140.1.In furtherance of the program, the Natural Resources Agency shall facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
4140.2.In furtherance of the program, the State Energy Resources Conservation and Development Commission shall, in coordination with the department, Natural Resources Agency, and Department of Conservation, consider funding qualifying projects pursuant to the Clean Transportation Program (Article 2 (commencing with Section 44272) of Chapter 8.9 or Part 5 of Division 26 of the Health and Safety Code) that use forest biomass waste for advanced biofuel technology development, including, but not limited to, projects that use noncombustion conversion technologies for electrical vehicle charging or hydrogen vehicle fueling.
4140.3.(a)In furtherance of the program, the State Energy Resources Conservation and Development Commission shall, in coordination with the Natural Resources Agency and the Department of Conservation, prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that utilize forest biomass waste. The report shall present recommendations, where appropriate, for opportunities to maximize environmental performance, grid reliability benefits, and value to electricity ratepayers. The report shall assess the potential to facilitate the use of forest biomass waste produced within fire-threat areas, as identified by the Public Utilities Commission, to support the integration of innovative biomass power for the purpose of supporting rural microgrids, or providing other grid support, or both, including an assessment of any technological or feasible challenges, including, but not limited to, challenges associated with reliability and fueling concerns. The report may include a review of, and recommendations for, alternative programming or financing considerations.
(b)(1)A report to be submitted pursuant to this section shall be submitted in compliance with Section 9795 of the Government Code.
(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2028.
SEC. 5.Section 25302.3 is added to the Public Resources Code, to read:25302.3.(a)As part of the 2025 edition of the integrated energy policy report, and as part of each integrated energy policy report adopted biennially thereafter, report the commission shall include an assessment of the potential for forest biomass waste energy to provide firm renewable power.
(b)For the purposes of this section, forest biomass waste means the same as defined in Section 4139 of the Public Resources Code.
SEC. 6.Section 399.20 of the Public Utilities Code is amended to read:399.20.(a)(1)It is the policy of this state and the intent of the Legislature to encourage electrical generation from eligible renewable energy resources.
(2)Paragraph (5) of subdivision (f) is appropriate because the program is a fixed-price feed-in tariff program with no pricing discretion.
(3)This section does not authorize cost recovery by an entity other than an electrical corporation regulated by the commission, except for the procurement authorized in paragraph (5) of subdivision (f).
(b)As used in this section, electric generation facility means an electric generation facility located within the service territory of an electrical corporation, and developed to sell electricity to, an electrical corporation or, for a bioenergy electric generation facility, to an electrical corporation or a community choice aggregator that provides electric service within the service territory of the electrical corporation that meets all of the following criteria:
(1)Has an effective capacity of not more than three megawatts, with the exception of those facilities participating in a tariff made available pursuant to paragraph (2) of subdivision (f).
(2)Is interconnected and operates in parallel with the electrical transmission and distribution grid.
(3)(A)Except as provided in subparagraph (B), is strategically located and interconnected to the electrical transmission and distribution grid in a manner that optimizes the deliverability of electricity generated at the facility to load centers.
(B)For purposes of paragraph (2) of subdivision (f), is strategically located and interconnected to the electrical transmission and distribution grid in a manner that optimizes the deliverability of electricity generated at the facility to load centers or is interconnected to an existing transmission line.
(4)Is an eligible renewable energy resource.
(c)Every electrical corporation shall file with the commission a standard tariff for electricity purchased from an electric generation facility. The commission may modify or adjust the requirements of this section for any electrical corporation with less than 100,000 service connections, as individual circumstances merit.
(d)(1)The tariff shall provide for payment for every kilowatthour of electricity purchased from an electric generation facility for a period of 10, 15, or 20 years, as authorized by the commission. The payment shall be the market price determined by the commission pursuant to paragraph (2) and shall include all current and anticipated environmental compliance costs, including, but not limited to, mitigation of emissions of greenhouse gases and air pollution offsets associated with the operation of new generating facilities in the local air pollution control or air quality management district where the electric generation facility is located.
(2)The commission shall establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with an electric generation facility, in consideration of the following:
(A)The long-term market price of electricity for fixed price contracts, determined pursuant to an electrical corporations general procurement activities as authorized by the commission.
(B)The long-term ownership, operating, and fixed-price fuel costs associated with fixed-price electricity from new generating facilities.
(C)The value of different electricity products including baseload, peaking, and as-available electricity.
(3)The commission may adjust the payment rate to reflect the value of every kilowatthour of electricity generated on a time-of-delivery basis.
(4)The commission shall ensure, with respect to rates and charges, that ratepayers that do not receive service pursuant to the tariff are indifferent to whether a ratepayer with an electric generation facility receives service pursuant to the tariff.
(e)An electrical corporation shall provide expedited interconnection procedures to an electric generation facility located on a distribution circuit that generates electricity at a time and in a manner so as to offset the peak demand on the distribution circuit, if the electrical corporation determines that the electric generation facility will not adversely affect the distribution grid. The commission shall consider and may establish a value for an electric generation facility located on a distribution circuit that generates electricity at a time and in a manner so as to offset the peak demand on the distribution circuit.
(f)(1)An electrical corporation shall make the tariff available to the owner or operator of an electric generation facility within the service territory of the electrical corporation, upon request, on a first-come-first-served basis, until the electrical corporation meets its proportionate share of a statewide cap of 750 megawatts cumulative rated generation capacity served under this section and Section 399.32. The proportionate share shall be calculated based on the ratio of the electrical corporations peak demand compared to the total statewide peak demand.
(2)By June 1, 2013, the commission shall, in addition to the 750 megawatts identified in paragraph (1), direct the electrical corporations to collectively procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. The commission shall, for each electrical corporation, allocate shares of the additional 250 megawatts based on the ratio of each electrical corporations peak demand compared to the total statewide peak demand. In implementing this paragraph, the commission shall do all of the following:
(A)Allocate the 250 megawatts identified in this paragraph among the electrical corporations based on the following categories:
(i)For biogas from wastewater treatment, municipal organic waste diversion, food processing, and codigestion, 110 megawatts.
(ii)For dairy and other agricultural bioenergy, 90 megawatts.
(iii)For bioenergy using byproducts of sustainable forest management, 50 megawatts. Allocations under this category shall be determined based on the proportion of bioenergy that sustainable forest management providers derive from sustainable forest management in fire threat treatment areas, as designated by the Department of Forestry and Fire Protection.
(B)Direct the electrical corporations to develop standard contract terms and conditions that reflect the operational characteristics of the projects, and to provide a streamlined contracting process.
(C)Coordinate, to the maximum extent feasible, any incentive or subsidy programs for bioenergy with the agencies listed in subparagraph (A) of paragraph (3) in order to provide maximum benefits to ratepayers and to ensure that incentives are used to reduce contract prices.
(D)The commission shall encourage gas and electrical corporations to develop and offer programs and services to facilitate development of in-state biogas for a broad range of purposes.
(E)Direct the electrical corporations to authorize a bioenergy electric generation facility with an effective capacity of up to five megawatts to participate in the tariff made available pursuant to this paragraph, if it meets the following conditions:
(i)It delivers no more than three megawatts to the grid at any time.
(ii)It complies with the electrical corporations Electric Rule 21 tariff or other distribution access tariff.
(F)Payment is made pursuant to paragraph (1) of subdivision (d) and no payment is made for any electricity delivered to the grid in excess of three megawatts at any time.
(3)(A)The commission, in consultation with the Energy Commission, the State Air Resources Board, the Department of Forestry and Fire Protection, the Department of Food and Agriculture, and the Department of Resources Recycling and Recovery, may review the allocations of the 250 additional megawatts identified in paragraph (2) to determine if those allocations are appropriate.
(B)If the commission finds that the allocations of the 250 additional megawatts identified in paragraph (2) are not appropriate, the commission may reallocate the 250 megawatts among the categories established in subparagraph (A) of paragraph (2).
(4)(A)A project identified in clause (iii) of subparagraph (A) of paragraph (2) is eligible, in regards to interconnection, for the tariff established to implement paragraph (2) or to participate in any program or auction established to implement paragraph (2), if it meets at least one of the following requirements:
(i)The project is already interconnected.
(ii)The project has been found to be eligible for interconnection pursuant to the fast track process under the relevant tariff.
(iii)A system impact study or other interconnection study has been completed for the project under the relevant tariff, and there was no determination in the study that, with the identified interconnection upgrades, if any, a condition specified in paragraph (2), (3), or (4) of subdivision (n) would exist. Such a project is not required to have a pending, active interconnection application to be eligible.
(B)For a project meeting the eligibility requirements pursuant to clause (iii) of subparagraph (A) of this paragraph, both of the following apply:
(i)The project is hereby deemed to be able to interconnect within the required time limits for the purpose of determining eligibility for the tariff.
(ii)The project shall submit a new application for interconnection within 30 days of execution of a standard contract pursuant to the tariff if it does not have a pending, active interconnection application or a completed interconnection. For those projects, the time to achieve commercial operation shall begin to run from the date when the new system impact study or other interconnection study is completed rather than from the date of execution of the standard contract.
(5)(A)A community choice aggregator may submit eligible bioenergy projects to the commission for cost recovery if open capacity exists within an allocation category described in subparagraph (A) of paragraph (2) and the community choice aggregator submits an eligible tariff to the commission consistent with both of the following:
(i)The community choice aggregator files with the commission a standard tariff for electricity purchased from a bioenergy electric generation facility.
(ii)(I)The tariff provides for payment for every kilowatthour of electricity purchased from a bioenergy electric generation facility for a period of 10, 15, or 20 years, as authorized by the commission. The payment shall be the market price determined by the commission pursuant to subclause (II) and shall include all current and anticipated environmental compliance costs, including, but not limited to, mitigation of emissions of greenhouse gases and air pollution offsets associated with the operation of new generating facilities in the local air pollution control or air quality management district where the bioenergy electric generation facility is located.
(II)The commission shall establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with a bioenergy electric generation facility, considering those matters described in paragraph (2) of subdivision (d).
(iii)Any capacity procured by the community choice aggregator from a bioenergy project that is approved by the commission pursuant to this paragraph shall reduce the procurement targets for that allocation category ordered by the commission for the electrical corporation whose service territory encompasses the community choice aggregator pursuant to paragraph (2), or as modified pursuant to paragraph (3).
(B)Before acting pursuant to the authorization in subparagraph (A), a community choice aggregator shall develop standard contract terms and conditions that reflect the operational characteristics of the bioenergy electric generation facility and provide a streamlined contracting process. A community choice aggregator shall use the standard contract approved by the commission for use by the electrical corporation pursuant to subparagraph (B) of paragraph (2) to comply with this requirement, so long as all the terms and conditions of the contract are not modified by the community choice aggregator.
(C)In implementing this paragraph, the commission shall do all of the following:
(i)Coordinate, to the maximum extent feasible, any incentive or subsidy programs for bioenergy with the agencies listed in subparagraph (A) of paragraph (3) in order to provide maximum benefits to ratepayers and to ensure that incentives are used to reduce contract prices.
(ii)Direct a participating community choice aggregator to authorize a bioenergy electric generation facility with an effective capacity of up to five megawatts to participate in the tariff made available pursuant to this paragraph if it meets the following conditions:
(I)It delivers no more than three megawatts to the grid at any time.
(II)It complies with the Electric Rule 21 tariff or other distribution access tariff of the electrical corporation whose service territory it is located in.
(iii)Ensure payment is made pursuant to clause (ii) of subparagraph (A) and no payment is made for any electricity delivered to the grid in excess of three megawatts at any time.
(D)The community choice aggregator may make the terms of the tariff available to owners and operators of a bioenergy electric generation facility in the form of a standard contract subject to commission approval. To comply with this requirement, the community choice aggregator may base its tariff on the electrical corporations approved tariff, so long as all the terms and conditions of the tariff are not modified by the community choice aggregator.
(E)Every kilowatthour of electricity purchased from a bioenergy electric generation facility shall count toward meeting the community choice aggregators renewables portfolio standard annual procurement targets for purposes of paragraph (1) of subdivision (b) of Section 399.15.
(F)The physical generating capacity of a bioenergy electric generation facility shall count toward the community choice aggregators resource adequacy requirement for purposes of Section 380.
(G)In order to ensure the safety and reliability of bioenergy electric generation facilities, the owner of a bioenergy electric generation facility receiving a tariff pursuant to this paragraph shall provide an inspection and maintenance report to the community choice aggregator at least once every other year. The inspection and maintenance report shall be prepared at the owners or operators expense by a California-licensed contractor who is not the owner or operator of the bioenergy electric generation facility. A California-licensed electrician shall perform the inspection of the electrical portion of the generation facility.
(H)The contract between the bioenergy electric generation facility receiving the tariff and the community choice aggregator shall contain provisions that ensure that construction of the bioenergy electric generating facility complies with all applicable state and local laws and building standards and utility interconnection requirements.
(I)Nothing in this paragraph changes the sole procurement responsibility of a community choice aggregator pursuant to paragraph (5) of subdivision (a) of Section 366.2.
(J)The commission may modify or adjust the requirements of this paragraph for any community choice aggregator with less than 100,000 customer accounts as individual circumstances merit.
(K)The commission has ongoing review authority over any contracts of community choice aggregators submitted pursuant to this section consistent with its review of the contracts of electrical corporations entered into pursuant to this section.
(6)The commission shall continue the Bioenergy Market Adjusting Tariff (BioMAT) program established pursuant to this subdivision until the 250 megawatts identified in paragraph (2) are procured. implementation of paragraph (5) is resolved in commission proceeding R.22-10-010, and adequate time is given to community choice aggregators to participate in the program.
(7)For the purposes of this subdivision, bioenergy means biogas and biomass.
(g)The electrical corporation may make the terms of the tariff available to owners and operators of an electric generation facility in the form of a standard contract subject to commission approval.
(h)Every kilowatthour of electricity purchased from an electric generation facility shall count toward meeting the electrical corporations renewables portfolio standard annual procurement targets for purposes of paragraph (1) of subdivision (b) of Section 399.15.
(i)The physical generating capacity of an electric generation facility shall count toward the electrical corporations resource adequacy requirement for purposes of Section 380.
(j)(1)The commission shall establish performance standards for any electric generation facility that has a capacity greater than one megawatt to ensure that those facilities are constructed, operated, and maintained to generate the expected annual net production of electricity and do not impact system reliability.
(2)The commission may reduce the three megawatt capacity limitation of paragraph (1) of subdivision (b) if the commission finds that a reduced capacity limitation is necessary to maintain system reliability within the applicable electrical corporations service territory.
(k)(1)Any owner or operator of an electric generation facility that received ratepayer-funded incentives in accordance with Section 379.6 of this code, or with Section 25782 of the Public Resources Code, and participated in a net metering program pursuant to Sections 2827, 2827.9, and 2827.10 of this code before January 1, 2010, shall be eligible for a tariff or standard contract filed by an electrical corporation pursuant to this section.
(2)In establishing the tariffs or standard contracts pursuant to this section, the commission shall consider ratepayer-funded incentive payments previously received by the generation facility pursuant to Section 379.6 of this code or Section 25782 of the Public Resources Code. The commission shall require reimbursement of any funds received from these incentive programs to an electric generation facility, in order for that facility to be eligible for a tariff or standard contract filed by an electrical corporation pursuant to this section, unless the commission determines ratepayers have received sufficient value from the incentives provided to the facility based on how long the project has been in operation and the amount of renewable electricity previously generated by the facility.
(3)A customer that receives service under a tariff or contract approved by the commission pursuant to this section is not eligible to participate in any net metering program.
(l)An owner or operator of an electric generation facility electing to receive service under a tariff or contract approved by the commission shall continue to receive service under the tariff or contract until either of the following occurs:
(1)The owner or operator of an electric generation facility no longer meets the eligibility requirements for receiving service pursuant to the tariff or contract.
(2)The period of service established by the commission pursuant to subdivision (d) is completed.
(m)Within 10 days of receipt of a request for a tariff pursuant to this section from an owner or operator of an electric generation facility, the electrical corporation that receives the request shall post a copy of the request on its internet website. The information posted on the internet website shall include the name of the city in which the facility is located, but information that is proprietary and confidential, including, but not limited to, address information beyond the name of the city in which the facility is located, shall be redacted.
(n)An electrical corporation may deny a tariff request pursuant to this section if the electrical corporation makes any of the following findings:
(1)The electric generation facility does not meet the requirements of this section.
(2)The transmission or distribution grid that would serve as the point of interconnection is inadequate.
(3)The electric generation facility does not meet all applicable state and local laws and building standards and utility interconnection requirements.
(4)The aggregate of all electric generating facilities on a distribution circuit would adversely impact utility operation and load restoration efforts of the distribution system.
(o)Upon receiving a notice of denial from an electrical corporation, the owner or operator of the electric generation facility denied a tariff pursuant to this section shall have the right to appeal that decision to the commission.
(p)In order to ensure the safety and reliability of electric generation facilities, the owner of an electric generation facility receiving a tariff pursuant to this section shall provide an inspection and maintenance report to the electrical corporation at least once every other year. The inspection and maintenance report shall be prepared at the owners or operators expense by a California-licensed contractor who is not the owner or operator of the electric generation facility. A California-licensed electrician shall perform the inspection of the electrical portion of the generation facility.
(q)The contract between the electric generation facility receiving the tariff and the electrical corporation shall contain provisions that ensure that construction of the electric generating facility complies with all applicable state and local laws and building standards, and utility interconnection requirements.
(r)(1)All construction and installation of facilities of the electrical corporation, including at the point of the output meter or at the transmission or distribution grid, shall be performed only by that electrical corporation.
(2)All interconnection facilities installed on the electrical corporations side of the transfer point for electricity between the electrical corporation and the electrical conductors of the electric generation facility shall be owned, operated, and maintained only by the electrical corporation. The ownership, installation, operation, reading, and testing of revenue metering equipment for electric generating facilities shall only be performed by the electrical corporation.
SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Reducing wildfire severity and restoring healthy and resilient forests requires active forest management, including forest thinning and fuel removal in high fire hazard severity zones.
(b)Senate Bill 901 (Chapter 626 of the Statutes of 2018) calls upon California to significantly increase the amount of forest fuel removal for wildfire mitigation.
(c)The 2020 Forest Stewardship Agreement between California and the United States Forest Service commits to scaling up vegetation treatment of forests and wildlands to 1,000,000 acres per year by 2025.
(d)The Joint Institute Recommendations to Expand Wood and Biomass Utilization in California, issued by the State Board of Forestry and Fire Protections Joint Institute for Wood Products Innovation in November 2020, found that meeting fuel removal requirements would generate tens of millions of tons of dry forest waste annually, and provided recommendations for the beneficial use of forest biomass waste.
(e)Implementing the recommendations of the Joint Institute Recommendations to Expand Wood and Biomass Utilization in California will reduce the need for the piling and burning of forest waste, and would instead generate useful wood products, renewable energy, low carbon fuels, biochar and other soil amendments, while reducing wildfire risk.
(f)Californias Wildfire and Forest Resilience Action Plan, issued by the Governors Forest Management Task Force in January 2021, requires the Office of Planning and Research, among other state agencies, to develop a comprehensive framework to align the states wood utilization policies and priorities, including a comprehensive set of metrics to evaluate biomass availability, usage, investments, and workforce levels to create a sustainable wood products market in the state. That plan also requires the Governors Office of Business and Economic Development to develop a focused market strategy.
(g)According to the California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate, issued by the Forest Climate Action Team in 2018 and adopted by the California Environmental Protection Agency, Natural Resources Agency, and Department of Forestry and Fire Protection, converting waste biomass to energy cuts emissions of particulate matter, methane, and carbon monoxide by 98 percent, and significantly reduces black carbon and other pollutants, in comparison to open-pile burning.
(h)According to Getting to Neutral: Options for Negative Carbon Emissions in California, a report prepared by the Lawrence Livermore National Laboratory and released in 2020, converting forest waste to hydrogen, electricity, and other renewable fuels can provide significant carbon negative emissions needed to reach carbon neutrality by 2045.
(i)Forest biomass waste utilization will create jobs and economic development in many of the poorest regions of the state, increase energy resilience in the communities that are most vulnerable to power disruptions, and help to create a circular economy in Californias forested communities.
SEC. 2.Section 38535 of the Health and Safety Code is amended to read:38535.The state board, in consultation with the California Department of Forestry and Fire Protection, shall develop all of the following:
(a)A standardized system for quantifying the direct carbon emissions and decay from fuel reduction activities for purposes of meeting the accounting requirements for Greenhouse Gas Reduction Fund expenditures. This system may include standardized lookup tables by forest stand type, including for oak woodland forests, and harvest or other management prescriptions. The system shall acknowledge that certain expenditures, such as for planning, analysis, modeling, or outreach, will not have a direct greenhouse gas reduction benefit, but will facilitate necessary climate preparedness activities that will have direct greenhouse gas benefits.
(b)In consultation with academic experts, a historic baseline of greenhouse gas emissions from Californias natural fire regime reflecting conditions before modern fire suppression. This shall be completed on or before December 31, 2020. The baseline may be included within the state boards natural working lands inventory.
(c)On or before December 31, 2020, 2025, and every five years thereafter, a report that assesses greenhouse gas emissions associated with wildfire and forest management activities. The report shall include both of the following:
(1)A methodology to quantify the greenhouse gas and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning, and forest management activities.
(2)A list of the data needed to use the methodology prepared pursuant to paragraph (1).
SEC. 3.Section 38561 of the Health and Safety Code is amended to read:38561.(a)On or before January 1, 2009, the state board shall prepare and approve a scoping plan, as that term is understood by the state board, for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases by 2020 under this division. The state board shall consult with all state agencies with jurisdiction over sources of greenhouse gases, including the Public Utilities Commission and the State Energy Resources Conservation and Development Commission, on all elements of its plan that pertain to energy-related matters matters, including, but not limited to, electrical generation, load based-standards load-based standards or requirements, the provision of reliable and affordable electrical service, petroleum refining, and statewide fuel supplies to ensure the greenhouse gas emissions reduction activities to be adopted and implemented by the state board are complementary, nonduplicative, and can be implemented in an efficient and cost-effective manner.
(b)The plan shall identify and make recommendations on direct emissions reduction measures, alternative compliance mechanisms, market-based compliance mechanisms, and potential monetary and nonmonetary incentives for sources and categories of sources that the state board finds are necessary or desirable to facilitate the achievement of the maximum feasible and cost-effective reductions of greenhouse gas emissions by 2020.
(c)In making the determinations required by subdivision (b), the state board shall consider all relevant information pertaining to greenhouse gas emissions reduction programs in other states, localities, and nations, including the northeastern states of the United States, Canada, and the European Union.
(d)The state board shall evaluate the total potential costs and total potential economic and noneconomic benefits of the plan for reducing greenhouse gases to Californias economy, environment, and public health, using the best available economic models, emission estimation techniques, and other scientific methods.
(e)In developing its plan, the state board shall take into account the relative contribution of each source or source category to statewide greenhouse gas emissions, and the potential for adverse effects on small businesses, and shall recommend a de minimis threshold of greenhouse gas emissions below which emissions reduction requirements will not apply.
(f)In developing its plan, the state board shall identify opportunities for emissions reduction measures from all verifiable and enforceable voluntary actions, including, but not limited to, carbon sequestration projects and best management practices.
(g)In developing its plan, the state board shall consider the results of the latest report issued pursuant to subdivision (c) of Section 38535, as applicable.
(g)(h)The state board shall conduct a series of public workshops to give interested parties an opportunity to comment on the plan. The state board shall conduct a portion of these workshops in regions of the state that have the most significant exposure to air pollutants, including, but not limited to, areas designated as federal extreme nonattainment that have communities with minority populations, communities with low-income populations, or both.
(h)(i)The state board shall update its plan for achieving the maximum technologically feasible and cost-effective reductions of greenhouse gas emissions at least once every five years.
SEC. 4.Article 3.5 (commencing with Section 4139) is added to Chapter 1 of Part 2 of Division 4 of the Public Resources Code, to read:3.5.Forest Biomass Waste Utilization Program4139.For purposes of this article, the following definitions apply:
(a)California Forest Carbon Plan means the California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate issued by the California Environmental Protection Agency, the Natural Resources Agency, and the Department of Forestry and Fire Protection in May 2018.
(b)Forest Biomass Waste Utilization Plan means the Joint Institute Recommendations to Expand Wood and Biomass Utilization in California report issued by the boards Joint Institute for Wood Products Innovation in November 2020.
(c)Forest biomass waste is forest biomass that is removed to reduce or mitigate the risk of wildfire, reduce the risks to public safety or infrastructure from falling trees or tree limbs, or create defensible space, or for forest restoration projects.
(d)Program means the Forest Biomass Waste Utilization Program established pursuant to Section 4140.
(e)Wildfire and Forest Resilience Action Plan means the California Wildfire and Forest Resilience Action Plan issued by the Governors Forest Management Task Force in January 2021.
4140.(a)The Forest Biomass Waste Utilization Program is hereby established in the boards Joint Institute for Wood Products Innovation. The program shall do all of the following:
(1)Develop an implementation plan, in coordination with the Wildfire and Forest Resilience Task Force, Office of Planning and Research, Governors Office of Business and Economic Development, Department of Toxic Substances Control, Department of Conservation, State Energy Resources Conservation and Development Commission, and Public Utilities Commission, to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan, and the comprehensive framework to align the states wood utilization policies and priorities and the focused market strategy required by the Wildfire and Forest Resilience Action Plan. The implementation plan shall do both of the following:
(A)Identify, with particular emphasis on the development of new forest biomass waste utilization projects on developed property that is located near forested land that sources forest biomass waste, funding needs, gaps in research and demonstration, necessary regulatory changes, and other needs.
(B)Adopt best practices for biomass feedstock aggregation that are consistent with the recommendations of the Office of Planning and Research.
(2)(A)In collaboration with governmental, nonprofit, and for-profit entities that have expertise in workforce development, including, but not limited to, the California Community College system and the California Workforce Development Board, develop a workforce training program that will complement the workforce needs associated with implementation of the biomass utilization program.
(B)The workforce training program developed pursuant to subparagraph (A) shall include recommendations that address barriers that impact the hiring of new workers, including, but not limited to, high insurance premiums associated with newly trained drivers.
(b)Beginning January 1, 2025, and on or before every January 1 thereafter, the board, in coordination with the Wildfire and Forest Resilience Task Force, shall prepare and submit an annual report to the Legislature on the progress made on implementing the implementation plan developed pursuant to paragraph (1) of subdivision (a).
(c) A report to be submitted pursuant to subdivision (b) shall be submitted in compliance with Section 9795 of the Government Code.
4140.1.In furtherance of the program, the Natural Resources Agency shall facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
4140.2.In furtherance of the program, the State Energy Resources Conservation and Development Commission shall, in coordination with the department, Natural Resources Agency, and Department of Conservation, consider funding qualifying projects pursuant to the Clean Transportation Program (Article 2 (commencing with Section 44272) of Chapter 8.9 or Part 5 of Division 26 of the Health and Safety Code) that use forest biomass waste for advanced biofuel technology development, including, but not limited to, projects that use noncombustion conversion technologies for electrical vehicle charging or hydrogen vehicle fueling.
4140.3.(a)In furtherance of the program, the State Energy Resources Conservation and Development Commission shall, in coordination with the Natural Resources Agency and the Department of Conservation, prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that utilize forest biomass waste. The report shall present recommendations, where appropriate, for opportunities to maximize environmental performance, grid reliability benefits, and value to electricity ratepayers. The report shall assess the potential to facilitate the use of forest biomass waste produced within fire-threat areas, as identified by the Public Utilities Commission, to support the integration of innovative biomass power for the purpose of supporting rural microgrids, or providing other grid support, or both, including an assessment of any technological or feasible challenges, including, but not limited to, challenges associated with reliability and fueling concerns. The report may include a review of, and recommendations for, alternative programming or financing considerations.
(b)(1)A report to be submitted pursuant to this section shall be submitted in compliance with Section 9795 of the Government Code.
(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2028.
SEC. 5.Section 25302.3 is added to the Public Resources Code, to read:25302.3.(a)As part of the 2025 edition of the integrated energy policy report, and as part of each integrated energy policy report adopted biennially thereafter, the commission shall include an assessment of the potential for forest biomass waste energy to provide firm renewable power.
(b)For the purposes of this section, forest biomass waste means the same as defined in Section 4139 of the Public Resources Code.
SEC. 6.Section 399.20 of the Public Utilities Code is amended to read:399.20.(a)(1)It is the policy of this state and the intent of the Legislature to encourage electrical generation from eligible renewable energy resources.
(2)Paragraph (5) of subdivision (f) is appropriate because the program is a fixed-price feed-in tariff program with no pricing discretion.
(3)This section does not authorize cost recovery by an entity other than an electrical corporation regulated by the commission, except for the procurement authorized in paragraph (5) of subdivision (f).
(b)As used in this section, electric generation facility means an electric generation facility located within the service territory of an electrical corporation, and developed to sell electricity to, an electrical corporation or, for a bioenergy electric generation facility, to an electrical corporation or a community choice aggregator that provides electric service within the service territory of the electrical corporation that meets all of the following criteria:
(1)Has an effective capacity of not more than three megawatts, with the exception of those facilities participating in a tariff made available pursuant to paragraph (2) of subdivision (f).
(2)Is interconnected and operates in parallel with the electrical transmission and distribution grid.
(3)(A)Except as provided in subparagraph (B), is strategically located and interconnected to the electrical transmission and distribution grid in a manner that optimizes the deliverability of electricity generated at the facility to load centers.
(B)For purposes of paragraph (2) of subdivision (f), is strategically located and interconnected to the electrical transmission and distribution grid in a manner that optimizes the deliverability of electricity generated at the facility to load centers or is interconnected to an existing transmission line.
(4)Is an eligible renewable energy resource.
(c)Every electrical corporation shall file with the commission a standard tariff for electricity purchased from an electric generation facility. The commission may modify or adjust the requirements of this section for any electrical corporation with less than 100,000 service connections, as individual circumstances merit.
(d)(1)The tariff shall provide for payment for every kilowatthour of electricity purchased from an electric generation facility for a period of 10, 15, or 20 years, as authorized by the commission. The payment shall be the market price determined by the commission pursuant to paragraph (2) and shall include all current and anticipated environmental compliance costs, including, but not limited to, mitigation of emissions of greenhouse gases and air pollution offsets associated with the operation of new generating facilities in the local air pollution control or air quality management district where the electric generation facility is located.
(2)The commission shall establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with an electric generation facility, in consideration of the following:
(A)The long-term market price of electricity for fixed price contracts, determined pursuant to an electrical corporations general procurement activities as authorized by the commission.
(B)The long-term ownership, operating, and fixed-price fuel costs associated with fixed-price electricity from new generating facilities.
(C)The value of different electricity products including baseload, peaking, and as-available electricity.
(3)The commission may adjust the payment rate to reflect the value of every kilowatthour of electricity generated on a time-of-delivery basis.
(4)The commission shall ensure, with respect to rates and charges, that ratepayers that do not receive service pursuant to the tariff are indifferent to whether a ratepayer with an electric generation facility receives service pursuant to the tariff.
(e)An electrical corporation shall provide expedited interconnection procedures to an electric generation facility located on a distribution circuit that generates electricity at a time and in a manner so as to offset the peak demand on the distribution circuit, if the electrical corporation determines that the electric generation facility will not adversely affect the distribution grid. The commission shall consider and may establish a value for an electric generation facility located on a distribution circuit that generates electricity at a time and in a manner so as to offset the peak demand on the distribution circuit.
(f)(1)An electrical corporation shall make the tariff available to the owner or operator of an electric generation facility within the service territory of the electrical corporation, upon request, on a first-come-first-served basis, until the electrical corporation meets its proportionate share of a statewide cap of 750 megawatts cumulative rated generation capacity served under this section and Section 399.32. The proportionate share shall be calculated based on the ratio of the electrical corporations peak demand compared to the total statewide peak demand.
(2)By June 1, 2013, the commission shall, in addition to the 750 megawatts identified in paragraph (1), direct the electrical corporations to collectively procure at least 250 megawatts of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. The commission shall, for each electrical corporation, allocate shares of the additional 250 megawatts based on the ratio of each electrical corporations peak demand compared to the total statewide peak demand. In implementing this paragraph, the commission shall do all of the following:
(A)Allocate the 250 megawatts identified in this paragraph among the electrical corporations based on the following categories:
(i)For biogas from wastewater treatment, municipal organic waste diversion, food processing, and codigestion, 110 megawatts.
(ii)For dairy and other agricultural bioenergy, 90 megawatts.
(iii)For bioenergy using byproducts of sustainable forest management, 50 megawatts. Allocations under this category shall be determined based on the proportion of bioenergy that sustainable forest management providers derive from sustainable forest management in fire threat treatment areas, as designated by the Department of Forestry and Fire Protection.
(B)Direct the electrical corporations to develop standard contract terms and conditions that reflect the operational characteristics of the projects, and to provide a streamlined contracting process.
(C)Coordinate, to the maximum extent feasible, any incentive or subsidy programs for bioenergy with the agencies listed in subparagraph (A) of paragraph (3) in order to provide maximum benefits to ratepayers and to ensure that incentives are used to reduce contract prices.
(D)The commission shall encourage gas and electrical corporations to develop and offer programs and services to facilitate development of in-state biogas for a broad range of purposes.
(E)Direct the electrical corporations to authorize a bioenergy electric generation facility with an effective capacity of up to five megawatts to participate in the tariff made available pursuant to this paragraph, if it meets the following conditions:
(i)It delivers no more than three megawatts to the grid at any time.
(ii)It complies with the electrical corporations Electric Rule 21 tariff or other distribution access tariff.
(F)Payment is made pursuant to paragraph (1) of subdivision (d) and no payment is made for any electricity delivered to the grid in excess of three megawatts at any time.
(3)(A)The commission, in consultation with the Energy Commission, the State Air Resources Board, the Department of Forestry and Fire Protection, the Department of Food and Agriculture, and the Department of Resources Recycling and Recovery, may review the allocations of the 250 additional megawatts identified in paragraph (2) to determine if those allocations are appropriate.
(B)If the commission finds that the allocations of the 250 additional megawatts identified in paragraph (2) are not appropriate, the commission may reallocate the 250 megawatts among the categories established in subparagraph (A) of paragraph (2).
(4)(A)A project identified in clause (iii) of subparagraph (A) of paragraph (2) is eligible, in regards to interconnection, for the tariff established to implement paragraph (2) or to participate in any program or auction established to implement paragraph (2), if it meets at least one of the following requirements:
(i)The project is already interconnected.
(ii)The project has been found to be eligible for interconnection pursuant to the fast track process under the relevant tariff.
(iii)A system impact study or other interconnection study has been completed for the project under the relevant tariff, and there was no determination in the study that, with the identified interconnection upgrades, if any, a condition specified in paragraph (2), (3), or (4) of subdivision (n) would exist. Such a project is not required to have a pending, active interconnection application to be eligible.
(B)For a project meeting the eligibility requirements pursuant to clause (iii) of subparagraph (A) of this paragraph, both of the following apply:
(i)The project is hereby deemed to be able to interconnect within the required time limits for the purpose of determining eligibility for the tariff.
(ii)The project shall submit a new application for interconnection within 30 days of execution of a standard contract pursuant to the tariff if it does not have a pending, active interconnection application or a completed interconnection. For those projects, the time to achieve commercial operation shall begin to run from the date when the new system impact study or other interconnection study is completed rather than from the date of execution of the standard contract.
(5)(A)A community choice aggregator may submit eligible bioenergy projects to the commission for cost recovery if open capacity exists within an allocation category described in subparagraph (A) of paragraph (2) and the community choice aggregator submits an eligible tariff to the commission consistent with both of the following:
(i)The community choice aggregator files with the commission a standard tariff for electricity purchased from a bioenergy electric generation facility.
(ii)(I)The tariff provides for payment for every kilowatthour of electricity purchased from a bioenergy electric generation facility for a period of 10, 15, or 20 years, as authorized by the commission. The payment shall be the market price determined by the commission pursuant to subclause (II) and shall include all current and anticipated environmental compliance costs, including, but not limited to, mitigation of emissions of greenhouse gases and air pollution offsets associated with the operation of new generating facilities in the local air pollution control or air quality management district where the bioenergy electric generation facility is located.
(II)The commission shall establish a methodology to determine the market price of electricity for terms corresponding to the length of contracts with a bioenergy electric generation facility, considering those matters described in paragraph (2) of subdivision (d).
(iii)Any capacity procured by the community choice aggregator from a bioenergy project that is approved by the commission pursuant to this paragraph shall reduce the procurement targets for that allocation category ordered by the commission for the electrical corporation whose service territory encompasses the community choice aggregator pursuant to paragraph (2), or as modified pursuant to paragraph (3).
(B)Before acting pursuant to the authorization in subparagraph (A), a community choice aggregator shall develop standard contract terms and conditions that reflect the operational characteristics of the bioenergy electric generation facility and provide a streamlined contracting process. A community choice aggregator shall use the standard contract approved by the commission for use by the electrical corporation pursuant to subparagraph (B) of paragraph (2) to comply with this requirement, so long as all the terms and conditions of the contract are not modified by the community choice aggregator.
(C)In implementing this paragraph, the commission shall do all of the following:
(i)Coordinate, to the maximum extent feasible, any incentive or subsidy programs for bioenergy with the agencies listed in subparagraph (A) of paragraph (3) in order to provide maximum benefits to ratepayers and to ensure that incentives are used to reduce contract prices.
(ii)Direct a participating community choice aggregator to authorize a bioenergy electric generation facility with an effective capacity of up to five megawatts to participate in the tariff made available pursuant to this paragraph if it meets the following conditions:
(I)It delivers no more than three megawatts to the grid at any time.
(II)It complies with the Electric Rule 21 tariff or other distribution access tariff of the electrical corporation whose service territory it is located in.
(iii)Ensure payment is made pursuant to clause (ii) of subparagraph (A) and no payment is made for any electricity delivered to the grid in excess of three megawatts at any time.
(D)The community choice aggregator may make the terms of the tariff available to owners and operators of a bioenergy electric generation facility in the form of a standard contract subject to commission approval. To comply with this requirement, the community choice aggregator may base its tariff on the electrical corporations approved tariff, so long as all the terms and conditions of the tariff are not modified by the community choice aggregator.
(E)Every kilowatthour of electricity purchased from a bioenergy electric generation facility shall count toward meeting the community choice aggregators renewables portfolio standard annual procurement targets for purposes of paragraph (1) of subdivision (b) of Section 399.15.
(F)The physical generating capacity of a bioenergy electric generation facility shall count toward the community choice aggregators resource adequacy requirement for purposes of Section 380.
(G)In order to ensure the safety and reliability of bioenergy electric generation facilities, the owner of a bioenergy electric generation facility receiving a tariff pursuant to this paragraph shall provide an inspection and maintenance report to the community choice aggregator at least once every other year. The inspection and maintenance report shall be prepared at the owners or operators expense by a California-licensed contractor who is not the owner or operator of the bioenergy electric generation facility. A California-licensed electrician shall perform the inspection of the electrical portion of the generation facility.
(H)The contract between the bioenergy electric generation facility receiving the tariff and the community choice aggregator shall contain provisions that ensure that construction of the bioenergy electric generating facility complies with all applicable state and local laws and building standards and utility interconnection requirements.
(I)Nothing in this paragraph changes the sole procurement responsibility of a community choice aggregator pursuant to paragraph (5) of subdivision (a) of Section 366.2.
(J)The commission may modify or adjust the requirements of this paragraph for any community choice aggregator with less than 100,000 customer accounts as individual circumstances merit.
(K)The commission has ongoing review authority over any contracts of community choice aggregators submitted pursuant to this section consistent with its review of the contracts of electrical corporations entered into pursuant to this section.
(6)The commission shall continue the Bioenergy Market Adjusting Tariff (BioMAT) program established pursuant to this subdivision until the 250 megawatts identified in paragraph (2) are procured.
(6)(7)For the purposes of this subdivision, bioenergy means biogas and biomass.
(g)The electrical corporation may make the terms of the tariff available to owners and operators of an electric generation facility in the form of a standard contract subject to commission approval.
(h)Every kilowatthour of electricity purchased from an electric generation facility shall count toward meeting the electrical corporations renewables portfolio standard annual procurement targets for purposes of paragraph (1) of subdivision (b) of Section 399.15.
(i)The physical generating capacity of an electric generation facility shall count toward the electrical corporations resource adequacy requirement for purposes of Section 380.
(j)(1)The commission shall establish performance standards for any electric generation facility that has a capacity greater than one megawatt to ensure that those facilities are constructed, operated, and maintained to generate the expected annual net production of electricity and do not impact system reliability.
(2)The commission may reduce the three megawatt capacity limitation of paragraph (1) of subdivision (b) if the commission finds that a reduced capacity limitation is necessary to maintain system reliability within the applicable electrical corporations service territory.
(k)(1)Any owner or operator of an electric generation facility that received ratepayer-funded incentives in accordance with Section 379.6 of this code, or with Section 25782 of the Public Resources Code, and participated in a net metering program pursuant to Sections 2827, 2827.9, and 2827.10 of this code before January 1, 2010, shall be eligible for a tariff or standard contract filed by an electrical corporation pursuant to this section.
(2)In establishing the tariffs or standard contracts pursuant to this section, the commission shall consider ratepayer-funded incentive payments previously received by the generation facility pursuant to Section 379.6 of this code or Section 25782 of the Public Resources Code. The commission shall require reimbursement of any funds received from these incentive programs to an electric generation facility, in order for that facility to be eligible for a tariff or standard contract filed by an electrical corporation pursuant to this section, unless the commission determines ratepayers have received sufficient value from the incentives provided to the facility based on how long the project has been in operation and the amount of renewable electricity previously generated by the facility.
(3)A customer that receives service under a tariff or contract approved by the commission pursuant to this section is not eligible to participate in any net metering program.
(l)An owner or operator of an electric generation facility electing to receive service under a tariff or contract approved by the commission shall continue to receive service under the tariff or contract until either of the following occurs:
(1)The owner or operator of an electric generation facility no longer meets the eligibility requirements for receiving service pursuant to the tariff or contract.
(2)The period of service established by the commission pursuant to subdivision (d) is completed.
(m)Within 10 days of receipt of a request for a tariff pursuant to this section from an owner or operator of an electric generation facility, the electrical corporation that receives the request shall post a copy of the request on its internet website. The information posted on the internet website shall include the name of the city in which the facility is located, but information that is proprietary and confidential, including, but not limited to, address information beyond the name of the city in which the facility is located, shall be redacted.
(n)An electrical corporation may deny a tariff request pursuant to this section if the electrical corporation makes any of the following findings:
(1)The electric generation facility does not meet the requirements of this section.
(2)The transmission or distribution grid that would serve as the point of interconnection is inadequate.
(3)The electric generation facility does not meet all applicable state and local laws and building standards and utility interconnection requirements.
(4)The aggregate of all electric generating facilities on a distribution circuit would adversely impact utility operation and load restoration efforts of the distribution system.
(o)Upon receiving a notice of denial from an electrical corporation, the owner or operator of the electric generation facility denied a tariff pursuant to this section shall have the right to appeal that decision to the commission.
(p)In order to ensure the safety and reliability of electric generation facilities, the owner of an electric generation facility receiving a tariff pursuant to this section shall provide an inspection and maintenance report to the electrical corporation at least once every other year. The inspection and maintenance report shall be prepared at the owners or operators expense by a California-licensed contractor who is not the owner or operator of the electric generation facility. A California-licensed electrician shall perform the inspection of the electrical portion of the generation facility.
(q)The contract between the electric generation facility receiving the tariff and the electrical corporation shall contain provisions that ensure that construction of the electric generating facility complies with all applicable state and local laws and building standards, and utility interconnection requirements.
(r)(1)All construction and installation of facilities of the electrical corporation, including at the point of the output meter or at the transmission or distribution grid, shall be performed only by that electrical corporation.
(2)All interconnection facilities installed on the electrical corporations side of the transfer point for electricity between the electrical corporation and the electrical conductors of the electric generation facility shall be owned, operated, and maintained only by the electrical corporation. The ownership, installation, operation, reading, and testing of revenue metering equipment for electric generating facilities shall only be performed by the electrical corporation.
SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Feb 1, 2024 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2024 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| May 18, 2023 | In committee: Held under submission. |
| May 18, 2023 | Joint Rule 62(a), file notice suspended. (Page 1580.) |
| May 17, 2023 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 3, 2023 | In committee: Hearing postponed by committee. |
| Apr 26, 2023 | In committee: Hearing postponed by committee. |
| Apr 17, 2023 | Re-referred to Com. on APPR. |
| Apr 12, 2023 | Read second time and amended. |
| Apr 11, 2023 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (April 10). |
| Mar 28, 2023 | Re-referred to Com. on NAT. RES. |
| Mar 27, 2023 | Read second time and amended. |
| Mar 23, 2023 | From committee: Amend, and do pass as amended and re-refer to Com. on NAT. RES. (Ayes 13. Noes 0.) (March 22). |
| Feb 17, 2023 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 10, 2023 | From printer. May be heard in committee March 12. |
| Feb 9, 2023 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 10, 2023 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Mar 22, 2023 | Do pass as amended and be re-referred to the Committee on [Natural Resources] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Humboldt: Grass Roots Climate Action | ** Against | |
| Association Of California Water Agencies | * Support | Apr 10, 2023 |
| Bioenergy Association of California | * Support | Apr 10, 2023 |
| California Biomass Energy Alliance | ** Support | |
| California Compost Coalition | * Support | Apr 10, 2023 |
| California Forestry Association | * Support | Apr 10, 2023 |
| Camptonville Community Partnership, INC | ** Support | |
| Center for Biological Diversity | * Against | Apr 10, 2023 |
| Climate Action California | ** Against | |
| Coalition For Renewable Natural Gas | * Support | Apr 10, 2023 |
| Forest Landowners Of California | * Support | Apr 10, 2023 |
| Humboldt and Mendocino Redwood Companies | ** Support | |
| Marin Clean Energy | ** Support | |
| Pacific Gas and Electric | * Against | Apr 10, 2023 |
| Pioneer Community Energy | * Support | Apr 10, 2023 |
| Placer County Air Pollution Control District | ** Support | |
| Rostrum | ** Support | |
| Rural County Representatives of California | ** Support | |
| Sempra Energy | ** Against | |
| Sierra Club California | * Against | Apr 10, 2023 |
| Silicon Valley Clean Energy | ** Support | |
| Southern California Edison | * Against | Apr 10, 2023 |
| Valley Clean Energy Alliance | * Support | Apr 10, 2023 |
Date of Hearing: May 17, 2023
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Chris Holden, Chair
ABPCA Bill Id:AB 625
Author:(Aguiar-Curry) – As Amended Ver:April 12, 2023
Policy Committee: | Utilities and Energy | Vote: | 13 - 0 |
Natural Resources | 10 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill creates the Forest Biomass Waste (FBW) Utilization Program.
Specifically, this bill:
- Creates the Forest Biomass Waste Utilization Program within the State Board of Forestry and Fire Protection’s (Board of Forestry’s) Joint Institute for Wood Products Innovation (the Joint Institute) to:
- Develop an implementation plan, in coordination with specified state agencies, to (i) meet the goals and recommendations in the Joint Institute’s Forest Biomass Waste Utilization Plan of 2020 and (ii) align the state’s wood utilization policies and priorities with the “focused market strategy” “required” by the “Wildfire and Forest Resilience Action Plan” issued in 2021 by the Governor’s Forest Management Task Force. The implementation plan is to (i) identify funding needs, gaps in research and development, necessary regulatory changes and other needs and (ii) adopt best practices for biomass feedstock aggregation consistent with recommendations of the Governor’s Office of Planning and Research (OPR). The Board of Forestry, in coordination with the “Wildfire and Forest Resilience Task Force,” is to, beginning January 1, 2025, annually submit a report to the Legislature on progress in implementing the implementation plan.
- Develop, in collaboration with entities that have expertise in workforce development, a workforce training program that will complement the workforce needs associated with implementation of the FBW Utilization Program.
- Requires the Air Resources Board (ARB), starting with the 2025 edition of the quintennial report ARB produces, pursuant to existing law, to assess greenhouse gas (GHG) emissions associated with wildfire and forest management practices, to include (a) a methodology to quantify the GHG and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning and forest management activities and (b) a list of data needed to use the methodology, and requires ARB to produce the report in coordination with the “Wildfire and Forest Resilience Task Force.”
- Directs the California Energy Commission (CEC) to:
- In coordination with the Natural Resources Agency (NatRes Agency), the Department of Forestry and Fire Protection (Cal Fire) and the Department of Conservation (Conservation), to consider funding through the Clean Transportation Program qualifying projects that use forest biomass waste for advanced biofuel technology development.
- In coordination with the NatRes Agency and Conservation, submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that utilize forest biomass waste, as specified.
- Include in the 2025 edition of the CEC’s integrated energy policy report (IEPR) an assessment of the potential for forest biomass waste energy to provide firm renewable power.
- Requires the California Public Utilities Commission (CPUC) to continue the Bioenergy Market Adjusting Tariff (BioMAT) program at least until community choice aggregators (CCAs) are able to participate in the program.
- Directs the NatRes Agency to facilitate the integration of recommendations for forest biomass waste utilization in relevant state climate adaptation plans.
FISCAL EFFECT:
- ARB indicates it will need to enter contracts related to black carbon, including development of a model to estimate black carbon emissions, measure such emissions and integrate black carbon emissions data into existing GHG emissions models. ARB estimates it will need about $4 million dollars one time for the contracts (Cost of Implementation Account (COIA)). ARB also anticipates ongoing staff costs of just over $1 million for six positions (COIA).
- Cal Fire anticipates needing three new positions and consultant contracts, totaling about $1 million annually, to develop the implementation plan and workforce training program (special fund). Cal Fire describes these costs as ongoing, but it seems likely Cal Fire’s costs would diminish after the plan and program are developed.
- The CEC anticipates needing at least two new staff members $350,000 annually) and, possibly, funding for consultants or contractors ($500,000 one time) to include biomass assessments analyses and recommendations in the IEPR (special fund).
- Costs of an unknown, but potentially significant amount, to the NatRes Agency.
- Minor absorbable costs to CPUC.
COMMENTS:
- Purpose. The author intends this bill to result in an increase in what the author describes as “beneficial” use of the state’s forest biomass, thereby reducing air pollution and creating jobs in economically depressed areas of the state. According to the author:
Without a productive way to use that biomass, it will be piled and burned, which emits significant climate and air pollution. Converting forest waste biomass to beneficial re-uses can, instead, reduce emissions from pile and burn while creating renewable power and fuels, biochar, crosslaminated timber, and other valuable wood products. Doing so will also boost jobs, economic growth, and energy security in many of California’s poorest and most vulnerable regions.
- Background.
Wildfires and biomass. Much of the state in covered in forests. The forests are habitat to a wide variety of plants and animals, and their health and existence provide numerous ecological and environmental benefits. In addition, homes, businesses and critical infrastructure sits alongside and within those forests.
Unfortunately, much of this forestland is prone to wildfire.
Following particularly devastating wildfires over the first decades of this century, the state committed to improving forest health and, thereby, decreasing the risk of wildfire. Notable in regards to this commitment was passage of SB 901 (Dodd), Chapter 626, Statutes of 2018, which requires California to double forest “fuel” removal to reduce the risks of catastrophic wildfires.
Prescribed burns are one way to remove forest fuel. Another is mechanical thinning, in which woody biomass is physically removed from the forest. An ongoing challenge for forest managers, and policy makers, is deciding what to do with the millions of tons of biomass that is removed from forests.
One option is to ignite the biomass in what are known as “burn piles.” This open burning disposes of the biomass. Yet, it also creates air pollution, increases wildfire risk and secures no additional benefits from the forest “waste.”
The state has sought to make better use of the biomass removed from the state’s forests. In support of this effort, various state entities have produced documents that include recommendations to allow the state to make the most of its disposal of the millions of tons of biomass pulled from California’s forests. Those documents include:
- “California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate” issued by the California Environmental Protection Agency, the NatRes Agency and the Cal Fire in May 2018.
- “Joint Institute Recommendations to Expand Wood and Biomass Utilization in California” report issued by the board’s Joint Institute in November 2020.
- “California Wildfire and Forest Resilience Action Plan” issued by the Governor’s Forest Management Task Force in January 2021.
This bill places in law many of the recommendations made in these documents.
The BioMAT program. One way to dispose of biomass removed from the forest is to combust it to produce heat that, in turn, is used to generate electricity. CPUC’s BioMAT program is a feed-in tariff program to encourage the procurement of energy produced by small renewable generators using biological sources. Under the program, small bioenergy generators (those less than five megawatts (MW) in capacity) may offer up to 250 MW from eligible projects through a fixed-price standard contract to an investor-owned utility (IOU). An IOU must procure the electricity at the fixed price and according to the standard terms.
Statute differentiates BioMAT bioenergy projects into three categories and allocates the program’s 250 MW across each category. Each of the state’s large electric utilities—Pacific Gas and Electric, Southern California Electric and San Diego Gas and Electric (PG&E, SCE and SDG&E, respectively)—is obligated to procure up to a certain amount, in MW, of bioenergy from each category, if an eligible generator makes the electricity available to the IOU. The table below shows the three BioMAT project categories, the MWs associated with each category, and each IOU’s proportional procurement obligations within each BioMAT category. As the table shows, BioMAT procurement has been, for the most part, anemic. This lack of procurement is likely because electricity produced by BioMAT-eligible resources costs significantly more than does electricity produced by other renewable energy resources.
IOU Relative BioMAT MWs Procured/Obligation (Rounded) | ||||
Category | Allocation (MW) | PG&E | SCE | SDG&E |
1 (a) | 110 | 2.5 / 30.5 | 10.0 / 55.5 | 0.0 / 24.0 |
2 (b) | 90 | 21.7 / 33.5 | 0.8 / 56.5 | n/a |
3 (c) | 50 | 13.9 / 47.0 | 0.0 / 2.5 |
|
TOTALS | 250 | 38.1 / 111.0 | 10.8 / 114.5 | 0.0 / 24.5 |
| ||||
Recently, in spite of the lack of procurement, or maybe because of the lack of procurement, the Legislature allowed CCAs to procure BioMAT resources and extended the BioMAT procurement obligation by five years. (See AB 843 (Aguiar-Curry), Chapter 234, Statutes of 2021, and SB 1109 (Caballero), Chapter 364, Statutes of 2022, respectively.)
CPUC is undertaking a proceeding to consider how to accommodate CCA participation in BioMAT, consistent with the requirements of AB 843. Whereas this bill would have extended the BioMAT program indefinitely, it now extends the program only until CCAs are able to participate in the program.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 10, 2023
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Luz Rivas, Chair
ABPCA Bill Id:AB 625 (
Author:Aguiar-Curry) – As Amended Ver:March 27, 2023
SUBJECT: Forest biomass: management: emissions: energy
SUMMARY: Establishes the Forest Waste Biomass Utilization Program to develop an implementation plan to meet the goals and recommendations of the state’s wood utilization policies and priorities and focused market strategy of specified statewide forest management plans, and to develop a workforce training program to complement the workforce needs associated with the implementation plan.
EXISTING LAW:
- Establishes in the California Natural Resources Agency (NRA) the Department of Forestry and Fire Protection (CAL FIRE), and requires CAL FIRE to be responsible for, among other things, fire protection and prevention, as provided. (Public Resources Code (PRC) 4003, et seq.)
- Establishes the State Board of Forestry and Fire Protection (Board of Forestry) in CAL FIRE to represent the state’s interest in the acquisition and management of state forests and requires the Board of Forestry to maintain an adequate forest policy. (PRC 4002)
- Establishes, pursuant to Executive Order No. B-52-18, a Forest Management Task Force (Task Force), now known as the Wildfire and Forest Resilience Task Force, involving specified state agencies to create the action plan for wildfire and forest resilience. The executive order also established a Joint Institute for Wood Products Innovation (Institute).
- Designates, under the California Global Warming Solutions Act of 2006, the State Air Resources Board (ARB) as the state agency charged with monitoring and regulating sources of greenhouse gases (GHG) emissions. Requires the ARB to adopt specified statewide GHG limits below 1990 levels and to achieve the maximum technologically feasible and cost-effective GHG reductions. (Health & Safety Code (HSC) 38561)
- Requires ARB to prepare and approve a Scoping Plan for achieving reductions in GHG emissions from sources or categories of sources of GHGs. Requires the Scoping Plan to identify and make recommendations on direct GHG emissions reduction measures, among other things. Requires ARB to update Scoping Plan for at least once every five years. (HSC 38561)
- Requires ARB, in consultation with CAL FIRE, to develop a report on or before December 31, 2020, and every five years thereafter that assesses GHGs associated with wildfire and forest management activities. (HSC 38535)
- Establishes, pursuant to the Warren-Alquist State Energy Resources Conservation and Development Act, the State Energy Resources Conservation and Development Commission (CEC). Requires the CEC, in consultation with specified state and federal agencies and at least every two years, to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. (PRC 25000, et seq.)
- Requires the CEC to adopt a biennial integrated energy policy report (IEPR) containing an overview of major energy trends and issues facing the state, including, but not limited to, supply, demand, pricing, reliability, efficiency, and impacts on public health and safety, the economy, resources, and the environment. (PRC 25302)
- Establishes, pursuant to the Clean Transportation Program to provide funding to specified eligible entities to develop and deploy innovative technologies that transform California’s fuel and vehicle types to help attain the state’s climate change policies. (HSC 44270)
- Requires the Public Utilities Commission (CPUC) to establish a renewable portfolio standard (RPS) requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatt hours of those products sold to their retail end-use customers achieves 44% of retail sales by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. (Public Utilities Code (PUC) 399.11)
- Requires the CPUC to direct electrical corporations, collectively, to procure at least 250 megawatts (MW) of cumulative rated generating capacity from developers of bioenergy projects that commence operation on or after June 1, 2013. Pursuant to this requirement, the PUC has established and revised the Bioenergy Market Adjusting Tariff (BioMAT) program. (PUC 399.20)
THIS BILL:
- Requires, as part of the 2025 update to the report that assesses GHGs associated with wildfire and forest management activities, ARB to include both of the following:
- A methodology to quantify GHG and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning, and forest management activities.
- A list of the data needed to use the methodology prepared.
- Requires ARB, in developing the Scoping Plan, to consider the results of the latest report mentioned above.
- Establishes the Forest Biomass Waste Utilization Program (Biomass Program) in the Institute.
- Defines the following terms for purposes of the Biomass Program:
- “California Forest Carbon Plan” means the “California Forest Carbon Plan: Managing our Forest Landscapes in a Changing Climate” issued by the California Environmental Protection Agency, the NRA, and CAL FIRE in May 2018;
- “Forest Biomass Waste Utilization Plan” means the “Joint Institute Recommendations to Expand Wood and Biomass Utilization in California” report issued by the Board of Forestry Institute in November 2020;
- “Forest biomass waste” is forest biomass that is removed to reduce or mitigate the risk of wildfire, reduce the risks to public safety or infrastructure from falling trees or tree limbs, or create defensible space, or for forest restoration projects; and,
- “Wildfire and Forest Resilience Action Plan” means the “California Wildfire and Forest Resilience Action Plan” (Action Plan) issued by the Task Force in January 2021.
- Requires the Biomass Program to do all of the following:
- Develop an implementation plan, in coordination with the Task Force, Office of Planning and Research (OPR), Governor’s Office of Business and Economic Development, Department of Toxic Substances Control, Department of Conservation (DOC), CEC, and CPUC, to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan, and the comprehensive framework to align the state’s wood utilization policies and priorities and the focused market strategy required by the Action Plan. Requires the implementation plan to do both of the following:
- Identify, with particular emphasis on the development of new forest biomass waste utilization projects on developed property that is located near forested land that sources forest biomass waste, funding needs, gaps in research and demonstration, necessary regulatory changes, and other needs.
- Adopt best practices for biomass feedstock aggregation that are consistent with the recommendations of OPR.
- In collaboration with governmental, nonprofit, and for-profit entities that have expertise in workforce development, including, but not limited to, the California Community College system and the California Workforce Development Board, develop a workforce training program that will complement the workforce needs associated with implementation of the biomass utilization program.
- Develop an implementation plan, in coordination with the Task Force, Office of Planning and Research (OPR), Governor’s Office of Business and Economic Development, Department of Toxic Substances Control, Department of Conservation (DOC), CEC, and CPUC, to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan, and the comprehensive framework to align the state’s wood utilization policies and priorities and the focused market strategy required by the Action Plan. Requires the implementation plan to do both of the following:
- Requires, beginning January 1, 2025, and annually thereafter, the Board of Forestry, in coordination with the Task Force, to prepare and submit an annual report to the Legislature on the progress made on implementing the implementation plan.
- Requires NRA to facilitate the integration of recommendations for forest biomass waste uses in relevant state climate adaptation plans.
- Requires the CEC, in coordination with CAL FIRE, NRA, and DOC, to consider funding qualifying projects pursuant to the Clean Transportation Program that use forest biomass waste for advanced biofuel technology development, including, but not limited to, projects that use noncombustion conversion technologies for electrical vehicle charging or hydrogen vehicle fueling.
- Requires the CEC, in coordination with NRA and DOC, to prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that use forest biomass waste. Requires the report to present recommendations, where appropriate, for opportunities to maximize environmental performance, grid reliability benefits, and value to electricity ratepayers. Requires the report to assess the potential to facilitate the use of forest biomass waste produced within fire-threat areas, as identified by the PUC, to support the integration of innovative biomass power for the purpose of supporting rural microgrids, or providing other grid support, or both, including an assessment of any technological or feasible challenges, including, but not limited to, challenges associated with reliability and fueling concerns. Authorizes the report to include a review of, and recommendations for, alternative programming or financing considerations. Sunsets the report requirements on January 1, 2028.
- Requires the CEC, as part of the 2025 edition of the IEPR, to include an assessment of the potential for forest biomass waste energy to provide firm renewable power.
- Requires the PUC to continue the BioMAT program until the implementation of paragraph (5) of subdivision (f) of Section 399.20 is resolved within CPUC rulemaking proceeding R.22-10-010 and adequate time is given to community choice aggregators to participate in the program.
- States that no reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution.
FISCAL EFFECT: Unknown
COMMENTS:
- According to the author:
California’s forests cover nearly one-third of the state and provide enormous benefits for the climate, the environment, and the economy. Our forests are, however, increasingly vulnerable to wildfire, invasive species, drought, and other threats. State law requires forest fuel removal on one million acres per year, which will generate millions of tons of forest waste biomass. The Air Board’s 2022 Climate Change Scoping Plan calls for forest management on 2.3 million acres a year to reduce wildfire risks and restore healthier, more resilient forests. Without a productive way to use that biomass, it will be piled and burned, which emits significant climate and air pollution. Converting forest waste biomass to beneficial re-uses can, instead, reduce emissions from pile and burn while creating renewable power and fuels, biochar, cross-laminated timber, and other valuable wood products. Doing so will also boost jobs, economic growth, and energy security in many of California’s poorest and most vulnerable regions. AB 625 will address the need to put California’s forest biomass waste to reduce wildfires and create healthier forests by establishing the Forest Waste Biomass Utilization Program and directing state agencies to help promote the processing of biomass waste into bioenergy and other wood products. This bill also extends the existing Bioenergy Feed-in Tariff (BioMAT) Program until the California Public Utilities Commission implements past legislation that allows Community Choice Aggregators to participate in the program.
- Biomass. California covers about 100 million acres and approximately 40% of the state is forest. National Forest System lands, managed by the US Forest Service (USFS), cover in excess of 18 million acres (approximately 58% of California forestland). Forest operations such as logging, thinning, fuels reduction programs, and ecosystem restoration create a huge amount of woody biomass. Some of this is brought out of the forest for use, but as much as half of the biomass is left in the forest. When residues from mastication and slash from timber harvests are left scattered throughout the forest, they act as additional dry surface fuel and serve to increase intensity and severity if a wildfire burns through the area. Often woody biomass materials are piled and burned creating air pollution, such as black carbon, or left to decay, creating methane.
According to the CEC, there are currently approximately 47 million bone dry tons (BDT) of biomass resource potential in California. According to the Board of Forestry, state requirements to remove forest fuels on a combined one million acres per year will lead to 10 to 15 million bone dry tons of forest waste biomass annually.
SB 901 (Dodd, Chapter 626, Statutes of 2018) requires California to double forest fuel removal to reduce the risks of catastrophic wildfires. More recently, California entered an agreement with the USFS to reduce forest fuels on one million acres per year. While some of that will be accomplished with prescribed fire, much of it will require mechanical thinning that will generate millions of tons of forest waste per year.
- Biomass markets. Biomass piles reflect the severely underdeveloped forest biomass supply chain in California. One key obstacle to effectively using them is the cost of loading and transportation, since forested areas tend to be rural, mountainous, and remote. The main use of biomass today is as a fuel for California's existing biomass power plants. Currently, there are about 30 direct-combustion biomass facilities in operation with a capacity of 640 megawatts (MW). These biomass plants use about five million BDT of biomass per year – or about 10% of the total BDT biomass resource potential.
According to the CEC’s September 2020 report Utility-Scale Renewable Energy Generation Technology Roadmap, forest fire prevention through bioenergy systems is limited by cost. While wood residue and thinning collection is one of the most noticeable and currently relevant aspects of bioenergy conversion, the cost of collecting and delivering distributed wood resources remains prohibitively expensive. In general, woody biomass generation has a higher cost compared to other renewables even without accounting for collection of the types of wood resources that most often lead to wildfires.
Wood products manufacturing and various biomass utilization pathways contribute to local and regional economies by creating jobs and generating revenue through forest management and restoration activities; commercial harvesting; product manufacturing and energy or fuels production and related support businesses; and, transportation and shipping. A more robust market for biomass could help pay for forest treatments or provide income for landowners.
- Wildfire prevention. Wildfires have been growing in size, duration, and destructivity over the past 20 years. Growing wildfire risk is due to accumulating fuels, a warming climate, and expanding development in the wildland-urban interface. The 2020 fire season broke numerous records. In August 2020, California and the USFS agreed to scale up vegetation treatment and maintenance to one million acres of federal, state, and private forest and wildlands annually by 2025.
California is responsible for fire and resource protection on nearly 13.3 million acres of private and state-owned forested lands. The state owns about 1.1 million acres of these lands, and 12.2 million acres of lands are under private ownership. In the past several years, forest management has significantly expanded on these lands. CAL FIRE has increased its forest thinning and prescribed fire activities from about 30,000 acres in 2016 to more than 50,000 acres in 2020. Partners receiving state-funded grants treated more than 30,000 acres in 2020. Private landowners currently actively manage 250,000-300,000 acres through fuels reduction, mechanical thinning, and timber harvest projects.
Implementing innovative and recommended strategies for forest fuel load reduction and creating end-use markets for biomass can encourage and ideally accelerate healthy forest management to prevent wildfire spread while ideally reducing GHG emission.
- Forest Biomass Waste Utilization Program. The Institute at the Board of Forestry is dedicated to providing California forest product information, research, and analysis to increase economic drivers for healthy forests. Institute work focuses on long-term ecological and economic sustainability; education and outreach; increased forest resilience, long-term carbon storage, and local economies; and, industry retention and development in California.
On November 4, 2020, the Institute and the Board of Forestry released a set of recommendations to promote biomass utilization in California, including: providing financial incentives and leveraging public dollars to attract private capital to support demand for innovate wood and biomass products markets; identifying priority wood products manufacturing centers in or near forested communities throughout the state; providing grants to support workforce development; facilitating information flow between state, federal, tribal, and local governments; utilities; and other non-governmental organizations; and, measuring progress, among others.
This bill establishes the Biomass Program under the administration of the Institute to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan, the comprehensive wood utilization strategy, and market framework required by the Action Plan.
More specifically, the Biomass Program would develop an implementation plan, with the Task Force and other state agencies, to identify, with particular emphasis on the development of new forest biomass waste utilization projects on developed property that is located near forested land that sources forest biomass waste, funding needs, gaps in research and demonstration, necessary regulatory changes, and other needs, and adopt best practices for biomass feedstock aggregation that are consistent with the recommendations of OPR. Under the Biomass Program, a workforce training program that will complement the workforce needs associated with implementation of the biomass utilization program would also be developed.
In furtherance of the program, the bill requires NRA to facilitate the integration of recommendations for forest biomass waste utilization in relevant, state climate adaptation plans.
- Air Resources Board. In its Short Lived Climate Pollutant Reduction Strategy, ARB acknowledges that the only practical way to rapidly reduce the impacts of climate change is to immediately reduce emissions of short-lived climate pollutants, which include black carbon and methane, among others. Short-lived climate pollutants have atmospheric lifetimes on the order of a few days to a few decades, and their relative climate forcing impacts, when measured in terms of how they heat the atmosphere, can be tens, hundreds, or even thousands of times greater than that of carbon dioxide (CO₂). Black carbon is emitted from burning fuels such as biomass, as well as from various forms of non-fuel biomass combustion (destruction of excess woody wastes, wildfires, etc.). Black carbon contributes to climate change both directly by absorbing sunlight and indirectly by depositing on snow and by interacting with clouds and affecting cloud formation. While methane has a global warming potential 28 times more powerful than CO₂ over a 100-year time horizon, black carbon has a warming impact on climate 460-1,500 times stronger than CO₂ per unit of mass.
Current law requires ARB, in coordination with CAL FIRE, to develop a standardized system for quantifying the direct carbon emissions and decay from fuel reduction activities for purposes of meeting the accounting requirements for Greenhouse Gas Reduction Fund expenditures, and develop a historic baseline of GHG emissions from California’s natural fire regime reflecting conditions before modern fire suppression. AB 625 augments that reporting requirement for a 2025 report to include a methodology to quantify the GHG and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning, and forest management activities.
Under the Global Warming Solutions Act [AB 32 (Núñez), Chapter 488, Statutes of 2006], ARB is tasked with developing the Scoping Plan – the state’s road map for reducing anthropogenic GHGs to specified targets below 1990 levels to meet our GHG reduction and carbon neutrality goals. AB 625 further requires ARB to consider the results of the report that quantifies the direct carbon emissions and short-lived climate pollutant emissions from wildfires and fuel reduction activities.
ARB has historically not included GHG data from California’s natural fire regime because it would skew the focus away from human-made emissions (i.e., from the fossil fuel sector). Given the SB 901 report pursuant to HSC 68535, it is not necessary to include that information additionally in the Scoping Plan.
- Energy Commission. The Clean Transportation Program, also known as the Alternative and Renewable Technology Program (AB118 (Núñez), Chapter 750, Statutes of 2007), invests up to $100 million annually in a broad portfolio of transportation and fuel transportation projects, including biomethane, which is a renewable natural gas produced from decaying organic matter such as waste water treatment sludge, food waste, animal manures, landfill gas, dead trees, and municipal solid waste through a process called anaerobic digestion.
AB 625 requires the CEC, in furtherance of the Biomass Program, to consider funding qualifying projects pursuant to that program that use forest biomass waste for advanced biofuel technology development, including, but not limited to, projects that use noncombustion conversion technologies for electrical vehicle charging or hydrogen vehicle fueling.
Further, the bill requires CEC to prepare and submit a report to the Legislature, on or before December 31, 2024, that evaluates innovative bioenergy technologies that use forest biomass waste. In addition to the recommendations the CEC would be required to make, the author may wish to consider additionally requiring the CEC to consider the air quality improvement to nonattainment areas with existing or proposed bioenergy facilities.
Current law requires the CEC to prepare a biennial IEPR, which contains an integrated assessment of major energy trends and issues facing California’s electricity, natural gas, and transportation fuel sectors. AB 625 would require CEC to include an assessment in the IEPR of the potential for forest biomass waste energy to provide firm renewable power.
- Public Utilities Commission. The BioMAT is a Feed-in-Tariff program that ordered 250 MW of procurement for electricity from bioenergy projects. Electricity generated as part of the BioMAT program must count towards the utilities’ RPS targets. The intent of BioMAT is to create a program that differentiated small renewable biomass and biogas projects from other renewable distributed generation technologies to ensure that there are contracting opportunities for these facilities that capture existing methane emissions or use materials from agricultural and sustainable forestry activities. The procurement is allocated among three distinct bioenergy technology categories:
Category 1: Biogas from wastewater treatment, municipal organic waste diversion, food processing, and co-digestion - 110 MW
Category 2: Dairy and other agricultural bioenergy - 90 MW
Category 3: Bioenergy using byproducts of sustainable forest management (including fuels from high hazard zones) - 50 MW
According to the October 2018 CPUC BioMAT Program Review and Staff Proposal, during the first two years of the program’s inception, participation was low, undermining the competition needed for offer prices to adjust. As of 2018, the program has contracts for 33 MW of capacity, or 13% of the 250 MW procurement goal. At that time, CPUC staff noted it could take approximately 20 years to reach the BioMAT program procurement goal of 250 MW.
In September 2020, the PUC adopted Rulemaking 18-07-003 to extend BioMAT until December 31, 2025.
In October 2022, the PUC issued Rulemaking 22-10-010 to implement AB 843 (Aguiar-Curry, Chapter 843, Statutes of 2021) and authorize Community Choice Aggregators to participate in the BioMAT program.
In consideration of that ongoing rulemaking, AB 625 was amended in the Assembly Utilities & Energy Committee to require the CPUC continue the BioMAT program until the implementation of AB 843 is resolved within that rulemaking and adequate time is given to community choice aggregators to participate in the program.
- Committee amendments. The Committee may wish to consider amending the bill as follows to strike subdivision (g) from Sec. 38561 to remove the proposed changes to the Scoping Plan.
- Double referral. This bill was heard in the Assembly Utilities and Energy Committee on March 22, where it was approved 13-0.
- Related legislation.
AB 998 (Connolly) requires the CEC to report on the utility-scale biomass combustion facilities still in operation as of January 1, 2024 and specifies information the report must contain. This bill is scheduled to be heard in the Assembly Utilities and Energy Committee.
AB 2878 (Aguiar-Curry, 2022) would have established the Forest Biomass Waste Utilization Program to develop an implementation plan to meet the goals and recommendations of the Biomass Waste Utilization Plan and to develop a workforce training program to complement the workforce needs associated with implementation of this program. This bill was held in the Senate Appropriations Committee.
AB 2587 (E. Garcia, 2022) among its provisions, expands the type of firm resources to be considered in an upcoming CEC assessment to include bioenergy and biomass. This bill was held in the Senate Appropriations Committee.
SB 1109 (Caballero, Chapter 364, Statutes of 2022) extends requirements on electric utilities and CCAs to procure energy from biomass generating electric facilities by five years and requires extension of existing contracts by five years.
REGISTERED SUPPORT / OPPOSITION:
Support
Association of California Water Agencies
California Biomass Energy Alliance
California Compost Coalition
California Forestry Association
Coalition for Renewable Natural Gas
Humboldt and Mendocino Redwood Companies
Marin Clean Energy
Pioneer Community Energy
Placer County Air Pollution Control District
Rural County Representatives of California
Silicon Valley Clean Energy
Opposition
350 Humboldt: Grass Roots Climate Action
Center for Biological Diversity
Climate Action California
Sierra Club
Sempra Energy
Analysis Prepared by: Paige Brokaw / NAT. RES. /
Date of Hearing: March 22nd, 2023
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Eduardo Garcia, Chair
ABPCA Bill Id:AB 625 (
Author:Aguiar-Curry) – As Introduced Ver:February 9, 2023
SUBJECT: Forest Biomass Waste Utilization Program
SUMMARY: Establishes the Forest Biomass Waste Utilization Program to increase the use of forest biomass waste, including—of particular interest to this Committee—requiring the California Energy Commission (CEC) to report to the Legislature on innovative bioenergy technologies, and to indefinitely extend the date of the Bioenergy Market Adjusting Tariff (BioMAT) at the California Public Utilities Commission (CPUC).
Specifically, this bill:
- Establishes the Forest Biomass Waste Utilization Program in the California Air Resources Board’s (CARB) Joint Institute for Wood Products Innovation, and requires the program to develop an implementation plan, in coordination with the Wildfire and Forest Resilience Task Force, Office of Planning and Research, the Governor’s Office of Business and Economic Development, Department of Toxic Substances Control, Department of Conservation, CEC, and the CPUC, to meet the goals and recommendations of the Forest Biomass Waste Utilization Plan and the comprehensive wood utilization strategy and market framework required by the Wildfire and Forest Resilience Action Plan. Requires the implementation plan to identify funding needs, gaps in research and demonstration, necessary regulatory changes, and other needs, and to adopt best practices for biomass feedstock aggregation.
- Requires CARB, in collaboration with governmental, nonprofit, and for-profit entities that have expertise in workforce development, to develop a workforce training program, which shall make recommendations to address barriers that impact the hiring of new workers, including high insurance premiums associated with newly trained drivers.
- Requires CARB to include a methodology for quantifying the greenhouse gas and short-lived climate pollutant emissions, including black carbon, from wildfire, pile burning, and forest management activities, along with a list of the data needed to use the methodology, into the 2025 update of an assessment of greenhouse gas emissions from wildfire and forest management. Additionally requires CARB to consider the results of the assessment when developing the board’s Scoping Plan.
- Requires CARB, beginning January 1, 2025, and annually thereafter, to prepare and submit an annual report to the Legislature on the progress made on executing the implementation plan.
- Requires the California Natural Resources Agency (CNRA) to include the recommendations for forest biomass waste utilization in relevant state climate adaptation plans.
- Requires the CEC to consider funding qualifying projects pursuant to the Clean Transportation Program that use forest biomass waste for advanced biofuel technology development including, but not limited to, projects that use noncombustion conversion technologies for electrical vehicle charging or hydrogen vehicle fueling.
- Requires the CEC, by December 31, 2024, to prepare a report, in coordination with CNRA and the Department of Conservation, which evaluates technologies that utilize forest biomass waste, including recommendations for opportunities to maximize environmental performance, grid reliability, and value to electricity ratepayers. The report would also assess the potential for the use of forest biomass waste produced within fire-threat areas to support the integration of biomass power to support rural microgrids, or provide other grid support, or both, including an assessment of reliability and fueling concerns. The report may include a review of, and recommendations for, alternative programming or financing considerations.
- Requires the CEC, as part of the 2025 edition—and biennially thereafter—of the Integrated Energy Policy Report (IEPR), to include an assessment of the potential for forest biomass waste energy to provide firm renewable power.
- Requires the CPUC to continue the BioMAT program until the full target of 250 megawatts, as specified in statute, have been procured.
- Defines a number of terms for the purposes to the bill, including “forest biomass waste,” which means forest biomass that is removed for wildfire mitigation, to reduce the risks to public safety or infrastructure from falling trees, creation of defensible space, or for forest restoration projects.
EXISTING LAW:
- Establishes, pursuant to Executive Order No. B-52-18, a Forest Management Task Force, now known as the Wildfire and Forest Resilience Task Force, involving specified state agencies to create the action plan for wildfire and forest resilience. The executive order also established a Joint Institute for Wood Products Innovation.
- Designates, under the California Global Warming Solutions Act of 2006, CARB as the state agency charged with monitoring and regulating sources of emissions of GHGs. Requires CARB to adopt a statewide greenhouse gas (GHG) emissions limit and to adopt rules and regulations in an open public process to achieve the maximum technologically feasible and cost-effective GHG reductions. (Health and Safety Code §§ 38500-38510)
- Requires CARB, in consultation with the Department of Forestry and Fire Protection (CalFire), to develop a report on or before December 31, 2020, and every 5 years thereafter that assesses GHGs associated with wildfire and forest management activities. Requires CARB to prepare, adopt, and update an inventory of GHGs from all sources located in the state. (Health and Safety Code § 38535 and § 39607.4)
- Requires electric investor-owned utilities (IOUs) to collectively procure at least 250 megawatts (MW) of generated resources from bioenergy projects, and the CPUC to allocate amongst the electric IOUs shares of the 250 MW from bioenergy derived from organic waste diversion, dairy and agricultural sources, and byproducts of forest management. Requires the CPUC to encourage IOUs to develop programs and services that facilitate development of bioenergy and biogas. This program is known as BioMAT. (Public Utilities Code § 399.20)
- Requires retail sellers and publicly owned utilities to increase purchases of renewable energy such that at least 60% of retail sales are procured from eligible renewable energy resources by December 31, 2030. This is known as the Renewables Portfolio Standard (RPS). Electricity generated from biomass is considered a renewable energy resource under this policy. (Public Utilities Code §§ 399.11-399.33)
- Establishes the policy that all of the state's retail electricity be supplied with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. Requires the CPUC, in consultation with the CEC, CARB, and all California balancing authorities, to issue a joint report to the Legislature by January 1, 2021, reviewing and evaluating the 100% clean energy policy. (Public Utilities Code § 454.53)
- Establishes within the RPS a requirement that electrical corporations, by December 1, 2023, collectively procure, through financial commitments of 5 to 15 years, their proportionate share of 125 MWs of cumulative rated generating capacity from bioenergy projects commencing operation prior to June 1, 2013, that each produces its generation using specified minimum percentages of certain types of forest feedstock, including from Tier 1 and Tier 2 high hazard zones. (Public Utilities Code § 399.20.3)
- Requires an electrical corporation, local electric publicly owned utility, or community choice aggregator with a contract to procure electricity generated from biomass that is operative at any time in 2022, and expires or expired on or before December 31, 2028, to seek to amend the contract to include, or seek approval for a new contract that includes, an expiration date five years later than the expiration date in the contract that was operative in 2022, so long as the contract extension follows the feedstock requirement. This requirement would be limited to facilities sourcing fuel material in California and would not apply to facilities located in certain air basins. (Public Utilities Code § 8388)
- Requires the CEC to adopt the IEPR every two years, which must contain an overview of major energy trends and issues facing the state, including, but not limited to, supply, demand, pricing, reliability, efficiency, and impacts on public health and safety, the economy, resources, and the environment. (Public Resources Code §§ 25300-25327)
- Requires the CEC to incorporate firm zero-carbon resources into the IPER in a timely fashion. (Public Resources Code § 25305.5)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review.
BACKGROUND:
Biomass processes – Biomass is renewable organic material that can include wood and wood processing wastes, yard and food waste, agricultural crops, animal manure, and human sewage (municipal solid waste). Biomass can be used as feedstock to generate heat and electricity out of what would otherwise be waste material. Biomass is converted to energy through four main processes: direct combustion, and thermochemical, chemical, and biological conversion. Direct combustion, or simply burning the biomass, is the most common method for converting biomass to useful energy. Thermochemical conversion—such as pyrolysis and gasification—breaks down the biomass material with heat, usually with little to no oxygen so there is no burning. Chemical conversion breaks down the biomass material through chemical reactions; whereas biological conversion—including fermentation and bacterial decay—breaks down the biomass material through the use of enzymes, bacteria, or other microbes.
Biomass electricity –Today, there are about 87 operating biomass facilities—both direct combustion and alternative processes—in operation with a capacity of 1,259 MW, accounting for about 3% of in-state generation.[1] Electricity generated from biomass is considered a renewable energy resource for the purposes of meeting the state’s RPS requirements. Unlike variable renewable energy resources (such as solar and wind), bioenergy technologies can provide reliable and renewable baseload generation, or firm power, meaning that electricity can be generated during scheduled times and at predetermined power levels.
Board of Forestry and Fire Protection recommendations – On November 4, 2020, the Joint Institute for Wood Products Innovation and the Board of Forestry and Fire Protection released a set of recommendations to promote biomass utilization in California, specifically seeking to put forest fuels to its highest value use rather than pile burning or leaving the material to decompose.[2] The report includes a comprehensive list of market and regulatory challenges in bioenergy, and offers a couple dozen recommendations for various state agencies, many of which appear in this bill. Recommendation 2.3.1 urged ensuring microgrid tariffs include forest waste-based energy and forested communities.
BioMAT – BioMAT is a feed-in-tariff program established by SB 1112 (Rubio, Chapter 612, Statutes of 2012). Feed-in-tariffs offer long-term contracts with price certainty—usually above-market—for financing renewable energy investments. BioMAT created a 250 MW procurement requirement for small-scale bioenergy projects for California’s three largest IOUs,[3] broken into biogas, agriculture, and sustainable forest management categories. As shown in Table 1, the program has received limited adoption since its implementation in 2014.
Table 1: BioMAT Mandated Allocations as of Q2 2022.[4] | ||||
Category | MW Allocation | MW Contracted | MW Remaining | Contract Price ($/MWh) |
Biogas | 110 | 12.5 | 97.5 | 127.72 |
Dairy/Agriculture | 90 | 23 | 67 | 187.72 (Dairy) 183.72 (Other Agriculture) |
Sustainable Forest Management | 50 | 13.88 | 36.12 | 199.72 |
Total | 250 | 49.38 | 200.62 | |
The BioMAT program underwent a formal program review in 2018,[5] where CPUC staff recommended programmatic and procedural improvements to the program. The goal of the program review was to simplify the BioMAT procurement process, enable expanded program participation, address program barriers, reduce ratepayer expenditures, and promote statewide goals. In August 2020 a decision was issued directing changes to the BioMAT program rules, contract terms, clarifications in the procurement process, and an extension of the BioMAT program until December 2025[6] (from the previously set end date of February 2021).[7] The extension date was determined by evaluating the benefits of the program alongside its high costs and low participation. The prospect of extending the program indefinitely was suggested to likely increase costs to ratepayers, was unlikely to provide meaningful benefits, and would not address the issues associated with low participation.
In October 2022, the CPUC opened a rulemaking to implement AB 843 (Aguiar-Curry, Chapter 234, 2021), which authorized Community Choice Aggregators (CCAs) to participate in the BioMAT program. In this proceeding, the CPUC is considering how to most effectively integrate CCAs into the BioMAT program alongside IOUs, as well as the potential effect of the incorporation of CCAs on the BioMAT program. In their evaluation of potential effects of CCA addition, the CPUC identified specific issues as being within the scope of the proceeding, including the possibility of an additional 5-year extension of the BioMAT program (extending the end date to December 2030).[8] The CPUC is scheduled to issue a preliminary decision in Q3 of 2023 with a Commission Decision to follow, strongly suggesting that the CPUC will weigh in on the possibility of a BioMAT timeline extension well before the current program end date of December 2025.
Integrated Energy Policy Report (IEPR) – Existing law requires the CEC to develop the IEPR and establishes requirements for certain reports that must be included in the IEPR. The IEPR is a comprehensive energy policy report covering many aspects of California’s energy market, including energy supply and demand forecasts. In compliance with existing law, the CEC develops a full IEPR report every two years, with an update in the years between those full reports. The CEC develops the IEPR through public workshops, which include stakeholders relevant to the topics covered by the report. A draft version of the report is publicly available for comment and the IEPR is adopted at a CEC business meeting, which is also open to the public. The final IEPR is submitted to the governor, Legislature and other stakeholders in addition to being posted on the CEC’s webpage.
COMMENTS:
- Author’s Statement. According to the author, “California’s forests cover nearly one-third of the state and provide enormous benefits for the climate, the environment, and the economy. Our forests are, however, increasingly vulnerable to wildfire, invasive species, drought, and other threats. State law requires forest fuel removal on one million acres per year, which will generate millions of tons of forest waste biomass. The Air Board’s 2022 Climate Change Scoping Plan calls for forest management on 2.3 million acres a year to reduce wildfire risks and restore healthier, more resilient forests. Without a productive way to use that biomass, it will be piled and burned, which emits significant climate and air pollution. Converting forest waste biomass to beneficial re-uses can, instead, reduce emissions from pile and burn while creating renewable power and fuels, biochar, cross-laminated timber, and other valuable wood products. Doing so will also boost jobs, economic growth, and energy security in many of California’s poorest and most vulnerable regions. AB 625 will address the need to put California’s forest biomass waste to reduce wildfires and create healthier forests by establishing the Forest Waste Biomass Utilization Program and directing state agencies to help promote the processing of biomass waste into bioenergy and other wood products. This bill also extends the existing Bioenergy Feed-in Tariff (BioMAT) Program until it meets its original goal of procuring 250 MW of bioenergy.”
- Statewide benefits of forest management. Wildfires have been growing in duration and ferocity over the past 20 years. Their growing risk is due to a number of factors, from accumulating forest fuels to a warming climate to expanding development in the wildland-urban interface. Better management of the fuels that contribute to this wildfire risk is one of the main strategies to help mitigate fires.
According to the Assembly Committee on Natural Resources, the State of California is responsible for fire and resource protection on nearly 13.3 million acres of private and state-owned forested lands. The state owns about 1.1 million acres of these lands, and 12.2 million acres of lands are under private ownership. In the past several years, forest management has significantly expanded on these lands. CalFire has increased its forest thinning and prescribed fire activities from about 30,000 acres in 2016 to more than 50,000 acres in 2020. Partners receiving state-funded grants treated more than 30,000 acres in 2020. Private landowners currently actively manage 250,000-300,000 acres through fuels reduction, mechanical thinning, and timber harvest projects. In addition, SB 901 (Dodd, Chapter 626, Statutes of 2018) requires California to double forest fuel removal. And in August 2020, California and the US Forest Service agreed to scale up vegetation treatment and maintenance to one million acres of federal, state, and private forest and wildlands annually by 2025.[9]
All of these efforts produce forest waste. Sometimes that waste is left in piles, contributing to wildfire risk; whereas at others times the waste is burned on site, contributing to air pollution. This bill seeks recommended and alternative strategies for forest fuel load reduction in the hopes of creating end-use markets for biomass that will encourage and accelerate healthy forest management to prevent wildfire spread while reducing GHG emission.
- The Best End-Use? The need to better manage California’s forest waste is apparent. Having a robust biomass market spurring that forest management can help drive down the cost of forest waste removal activities. However, the biomass supply chain is underdeveloped in California. As noted above, government intervention has led the biomass energy sector to be the main end-use for California’s biomass waste. This bill appropriately seeks a more holistic approach by establishing a Forest Biomass Waste Utilization Program, with an emphasis on examining innovative new projects to manage the large volume of forest waste anticipated to arise in the coming years.[10]
- Cost Considerations. The main end-use of biomass today is as a fuel for California's existing biomass power plants. This has largely been driven by direct mandates to procure biomass electricity. In October 2015, Governor Brown issued an Emergency Order addressing Tree Mortality, and called upon the CPUC to review and update its procurement programs for small bioenergy generators.[11] The Bioenergy Renewable Action Mechanism (BioRAM) program was established in response. Subsequently, SB 859 (Committee on Budget and Fiscal Review, Chapter 368, Statutes of 2016) directed additional BioRAM procurement resulting in the requirement on large IOUs to procure 146 MWs of bioenergy from High Hazard Zone fuel. SB 901 (Dodd, Chapter 626, Statutes of 2018) further amended the BioRAM program to add program flexibility and extend certain biomass contracts by five years. Without these efforts, the viability of electricity generation from biomass is unclear. Biomass often experiences high operation and transportation costs, which often make electricity generated from biomass more expensive than other sources.
As shown in Figure 1,[12] RPS contract prices saw a spike in 2016 due to the execution of the BioRAM contracts. Figure 1 does not show contracts of 3 MW or less, so BioMAT contracts are not represented; however, their 2021 average contract price was substantially higher than the cumulative average of BioRAM contract prices.[13] The total contracted capacity and average price of BioMAT contracts in 2021 was 11.3 MW and 17.4 ¢/kWh, respectively, while the total capacity and average contract price of existing BioRAM contracts is 178 MW and 11.4 ¢/kWh, to date. For comparison, the IOUs’ weighted average RPS procurement expenditures in 2021 were approximately 8.4 ¢/kWh for geothermal, 14.4 ¢/kWh for small hydro, 11 ¢/kWh for solar PV, and 8.6 ¢/kWh for wind.[14]
Figure 1- Historical Trend of All Load Serving Entities' RPS Contract Costs by Technology and Year of Execution
- Current CPUC rulemaking on the BioMAT program: The CPUC has an ongoing rulemaking proceeding (R.22-10-010) which, among other issues, is considering an additional five-year extension to the BioMAT program which, if adopted, would push the end date of the program to December 2030. In considering this potential extension, the CPUC is weighing the history of cost concerns and low utilization of the BioMAT program alongside the potential for recent developments to increase participation in the program, particularly the authorization of CCA participation. In short, the CPUC both set the current BioMAT end date and is currently in the process of considering an additional extension. Therefore it may be premature to indefinitely extend the BioMAT program as this bill seeks to do. However, it is reasonable for new program participants to be concerned with the current CPUC-established deadline of December 2025, as ongoing rulemakings are still underway. The author and committee may wish to consider amendments to remove the indefinite extension of the BioMAT program, and rather ensure the BioMAT program may continue until CCAs are able to adequately participate in the program.
- Avoiding strain on IEPR: Assessing the potential for forest biomass waste energy to provide renewable power is important, but requiring the CEC to re-assess the role of forest biomass waste energy every two years as part of the IEPR process may not yield enough new insights to justify the additional reporting burden. As such, the author and committee may wish to consider amendments to strike part of Section 25302.3(a), retaining the assessment of forest biomass waste energy in the 2025 edition of the IEPR but not requiring similar assessments in subsequent IEPRs.
- Related Legislation.
AB 998 (Connolly), would require the CEC to issue a report on the utility-scale biomass combustion facilities still in operation, options to maximize the environmental benefits of these facilities, recommendations for strategies to upgrade biomass combustion facilities, and an evaluation of the feasibility of upgrading utility-scale biomass combustion facilities that have recently ceased operation. Status: referred to the Assembly Committee on Natural Resources.
- Prior Legislation.
AB 2878 (Aguiar-Curry, 2022) would, among other provisions, establish the Forest Waste Biomass Utilization Program to develop an implementation plan to meet the goals and recommendations of specified statewide forest management plans, require the CEC to report on innovative bioenergy technologies that utilize forest biomass waste and to include an assessment of the potential for forest biomass waste energy to provide firm renewable power in the 2023 edition of the integrated policy report and each report adopted biennially thereafter, and requires CARB to report on a methodology to quantify the greenhouse gas and short-lived climate pollutant emissions from forest management activities as well as consider the results of that report in the next update of its scoping plan. Status: Died – Senate Appropriations.
SB 1109 (Caballero) extended the electrical corporations’ obligation to collectively procure their proportionate share of 125 megawatts of cumulative rated generating capacity from existing bioenergy projects, require those entities with a contract to procure electricity generated from biomass that expires before December 31, 2028, to seek 5 year extensions on those contracts, and require any new contracts for incremental procurement of electricity from bioenergy resources to be from a resource that meets emission limits equivalent to the best available retrofit control technology. Status: Chapter 364, Statutes of 2022.
AB 843 (Aguiar-Curry) authorizes a CCA to execute contracts for eligible bioenergy projects and submit those contracts for cost recovery pursuant to the BioMAT program, if open capacity exists within the 250-megawatt BioMAT program limit. Status: Chapter 234, Statutes of 2021.
AB 322 (Salas) requires the CEC to consider, in the investment planning process for electric ratepayer-funded Electric Program Investment Charge program, funding for eligible biomass conversion to energy projects. Status: Chapter 229, Statutes of 2021.
AB 3163 (Salas), expands the definition of “biomethane” to include methane that is produced from the non-combustion thermal conversion of eligible biomass feedstock, for purposes of the CPUC’s consideration of adopting biomethane procurement targets. Status: Chapter 358, Statutes of 2020.
SB 901 (Dodd), among its many provisions, required an extension by 5 years of the existing biomass procurement contracts authorized under an executive order from Governor J. Brown. Status: Chapter 626, Statutes of 2018.
SB 859 (Committee on Budget and Fiscal Review), among its many provisions, directed 125 MW of bioenergy procurement. Status: Chapter 368, Statutes of 2016.
SB 1122 (Rubio), established a statewide procurement of up to 250 MW of renewable energy from small biomass or biogas technologies that utilize low emission technologies, and requires 50 MW be from small-scale bioenergy from the byproducts of sustainable forestry. This established the BioMAT program. Status: Chapter 612, Statutes of 2012.
- Double Referral. This bill is double-referred; upon passage in this Committee, this bill will be referred to the Assembly Committee on Natural Resources.
REGISTERED SUPPORT / OPPOSITION:
Support
Association of California Water Agencies (ACWA)
Bioenergy Association of California
California Forestry Association
Camptonville Community Partnership, INC
Marin Clean Energy (MCE)
Pioneer Community Energy (UNREG)
Placer County Air Pollution Control District
Rostrum
Rural County Representatives of California (RCRC)
Oppose
Climate Action California
Sierra Club
Oppose Unless Amended
Sempra Energy and Its Affiliates: San Diego Gas & Electric Company and Southern California Gas Company
Analysis Prepared by: Samuel Mahanes / U. & E. / (916) 319-2083
CEC website, “California Biomass and Waste-to-Energy Statistics and Data,” https://ww2.energy.ca.gov/almanac/renewables_data/biomass/index_cms.php, viewed on 04.22.2022 ↑
CPUC, CAL-FIRE, “Joint Institute Recommendations to Expand Wood and Biomass Utilization in California,” November 4, 2020. ↑
Pacific Gas & Electric (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E) ↑
As reported to this Committee by the CPUC on March 16, 2023. ↑
R. 18-07-003 ↑
D. 20-08-043 ↑
D. 14-12-081 ↑
R. 22-10-010 ↑
Memorandum of Understanding, “Agreement for Shared Stewardship of California’s Forest and Rangelands between the State of California and the USDA, Forest Service Pacific Southwest Region,” August 12, 2020. ↑
According to the Board of Forestry, state requirements to remove forest fuels on one million acres per year will lead to 10 to 15 million bone dry tons of forest waste biomass annually. Existing biomass plants use about five million BDT of biomass per year. ↑
Governor Edmund G. Brown, E.O. B-52-18 ↑
Taken from pg. 14 of the CPUC’s 2022 Padilla Report, published May 2022. ↑
12.8 ¢/kWh for biogas; 1848 ¢/kWh for dairy/ag; and 20 ¢/kWh for forest; pg. 15, 2022 Padilla Report. ↑
Pg. 25, 2022 Padilla Report ↑
Discussed in Hearing
Assembly Standing Committee on Natural Resources
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):