AB 1768: Prevailing wage: public works.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2019-10-10
|
Date
|
Status
|
|---|---|
| Oct 10, 2019 | Chaptered by Secretary of State - Chapter 719, Statutes of 2019. |
| Oct 10, 2019 | Approved by the Governor. |
| Sep 25, 2019 | Enrolled and presented to the Governor at 3:30 p.m. |
| Sep 11, 2019 | Assembly Rule 77 suspended. |
| Sep 10, 2019 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 12 pursuant to Assembly Rule 77. |
| Sep 10, 2019 | Read third time. Passed. Ordered to the Assembly. |
| Sep 9, 2019 | Read second time. Ordered to third reading. |
| Sep 6, 2019 | Read third time and amended. Ordered to second reading. |
| Jul 2, 2019 | Read second time. Ordered to third reading. |
| Jul 1, 2019 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jun 19, 2019 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jun 12, 2019 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 4. Noes 1.) (June 12). Re-referred to Com. on APPR. |
| May 22, 2019 | Referred to Com. on L., P.E. & R. |
| May 14, 2019 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 13, 2019 | Read third time. Passed. Ordered to the Senate. |
| May 9, 2019 | Read second time. Ordered to third reading. |
| May 8, 2019 | From committee: Do pass. (Ayes 14. Noes 4.) (May 8). |
| Apr 25, 2019 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (April 24). Re-referred to Com. on APPR. |
| Mar 25, 2019 | Re-referred to Com. on L. & E. |
| Mar 21, 2019 | Referred to Com. on L. & E. |
| Feb 25, 2019 | Read first time. |
| Feb 23, 2019 | From printer. May be heard in committee March 25. |
| Feb 22, 2019 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 11, 2019 | AB 1768 Carrillo Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 10, 2019 | Assembly 3rd Reading AB1768 Carrillo By Hill | Senate Floor |
Passed |
|
| Jun 12, 2019 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Labor, Public Employment and Retirement |
Passed |
|
| May 13, 2019 | AB 1768 Carrillo Assembly Third Reading | Assembly Floor |
Passed |
|
| May 8, 2019 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 24, 2019 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Labor and Employment |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 1768
Author:(Carrillo)
As Amended Ver:September 6, 2019
Majority vote
SUMMARY:
Expands the definition of "public works" to include work performed during construction site assessments and feasibility studies, and specifies that preconstruction work is a part of "public works," regardless of whether any further construction work is conducted.
The Senate Amendments:
Address chaptering out issues with AB 520 (Kalra) of the current legislative session.
COMMENTS:
Existing law requires prevailing wages be paid to all workers on most public works projects. In general, "public works" is defined to include construction, alteration, demolition, installation or repair work done under contract and "paid for in whole or in part out of public funds." These laws aim to provide construction workers on these projects a wage that is commonly paid to similar construction workers in a particular region.
According to the Author:
"While the statute makes clear that 'preconstruction' phases of a project fall under the definition of public works and thus require the payment of prevailing wage, the ambiguity as to what is considered preconstruction work has led to confusion amongst stakeholders in the construction industry as to when prevailing wage requirements apply.
Site assessments and feasibility studies are crucial to construction projects as they typically determine the suitability of the land where a project is to potentially be built. These assessments and studies typically cover a wide range of factors as it relates to a project, including, but not limited to, determining land boundaries and land use patterns.
Simply put, site assessments and feasibility studies are at the core of preconstruction work in that a project would typically not move forward without the successful completion of an assessment of the land."
Arguments in Support:
The State Building and Construction Trades Council, AFL-CIO, a co-sponsor of the bill, states, "By clarifying that preconstruction of public works projects also includes site assessments and feasibility studies under the definition of construction, AB 1768 will ensure workers performing these tasks are paid the wages and benefits they deserve."
Arguments in Opposition:
None on file.
FISCAL COMMENTS:
According to the Senate Appropriations Committee, pursuant to SR 28.8, negligible state costs.
VOTES:
ASM LABOR AND EMPLOYMENT: 7-0-0
YES: Kalra, Flora, Carrillo, Diep, Gonzalez, Jones-Sawyer, Luz Rivas
ASM APPROPRIATIONS: 14-4-0
YES: Gonzalez, Bloom, Bonta, Calderon, Carrillo, Chau, Diep, Eggman, Gabriel, Eduardo Garcia, Maienschein, Petrie-Norris, Quirk, Robert Rivas
NO: Bigelow, Brough, Fong, Obernolte
ASSEMBLY FLOOR: 61-12-7
YES: Aguiar-Curry, Bauer-Kahan, Berman, Bloom, Boerner Horvath, Bonta, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Chu, Cooley, Cooper, Cunningham, Daly, Diep, Eggman, Flora, Friedman, Gabriel, Cristina Garcia, Eduardo Garcia, Gipson, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Levine, Limón, Low, Maienschein, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Weber, Wicks, Wood, Rendon
NO: Bigelow, Choi, Fong, Gallagher, Kiley, Lackey, Mathis, Melendez, Obernolte, Patterson, Voepel, Waldron
ABS, ABST OR NV: Arambula, Brough, Burke, Dahle, Frazier, Gloria, Mayes
SENATE FLOOR: 31-8-1
YES: Allen, Archuleta, Atkins, Beall, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Lena Gonzalez, Hertzberg, Hill, Hueso, Hurtado, Jackson, Leyva, McGuire, Mitchell, Monning, Pan, Portantino, Roth, Rubio, Skinner, Stern, Umberg, Wieckowski, Wiener, Wilk
NO: Bates, Borgeas, Dahle, Grove, Moorlach, Morrell, Nielsen, Stone
ABS, ABST OR NV: Jones
UPDATED:
VERSION: September 6, 2019
CONSULTANT: Megan Lane / L. & E. / (916) 319-2091 FN: 0002244
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1768 |
THIRD READING
Bill No: AB 1768
Amended: 9/6/19 in Senate
SENATE LABOR, PUB. EMP. & RET. COMMITTEE: 4-1, 6/12/19
AYES: Hill, Jackson, Mitchell, Pan
NOES: Morrell
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 61-12, 5/13/19 - See last page for vote
SUBJECT: Prevailing wage: public works
SOURCE: International Union of Operating Engineers, California-Nevada
Conference
State Building and Construction Trades Council
DIGEST:
This bill expands the definition of public works, triggering the payment of prevailing wages, to include work conducted during site assessment or feasibility studies. This bill also specifies that preconstruction work is deemed part of a public work, regardless of whether any further construction work is conducted.
Senate Floor Amendments of 9/6/19 adopt double-jointing language in order to avoid chaptering out issues with AB 520 (Kalra), which provides a definition for what is considered a “de minimis” public subsidy for purposes of public works projects.
Existing law:
- Requires that not less than the general prevailing rate of per diem wages be paid to all workers employed on a “public works” project costing over $1,000 and imposes misdemeanor penalties for violation of this requirement. (Labor Code §1771)
- Defines “public work” to include, among other things, construction, alteration, demolition, installation or repair work done under contract and paid for in whole or in part out of public funds, except work done directly by any public utility company pursuant to an order of the Public Utilities Commission or other public authority. (Labor Code §1720(a))
- Specifies that for prevailing wage purposes, “construction” includes work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. (Labor Code §1720(a))
- Defines “paid for in whole or in part out of public funds” as, among other things, “Fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations normally required in the execution of a contract that are paid, reduced, charged at less than fair market value, waived or forgiven.” (Labor Code §1720(b))
- Requires that the applicable general prevailing rate of per diem wages be determined by the Director of the Department of Industrial Relations (DIR) for each locality in which the public work is to be performed and for each craft, classification, or type of worker needed to execute the public works project. (Labor Code §1773)
- Provides that private residential projects built on private property are not subject to the requirements of public works provisions, unless the projects are built pursuant to an agreement with a state agency, redevelopment agency, or local public housing authority. (Labor Code §1720(c)(1))
- Authorizes the Labor Commissioner, or their designee, to issue civil wage and penalty assessments on a contractor or subcontractor, or both, that fails to pay prevailing wages in connection with a public work. (Labor Code §1741)
This bill:
- Expands on the definition of “public works,” triggering the payment of prevailing wages, to include work performed during construction site assessments and feasibility studies.
- Specifies that preconstruction work, including design, site assessments, feasibility studies, inspections and land surveying work is deemed part of a “public work,” regardless of whether any further construction work is conducted.
- Includes double jointing language with AB 520 (Kalra) which sets a limit of $500,000 and 2% of the total cost on the amount of public reimbursement or subsidy a private developer can receive for a project before triggering additional public works regulations, including the payment of prevailing wages.
Background
“Public Works” and Prevailing Wage. Existing law requires that not less than the general prevailing wage rate of per diem wages, as determined by the Director of DIR, be paid to all workers employed on a “public works” projects. The prevailing wage rate is the basic hourly rate paid on public works projects to a majority of workers engaged in a particular craft, classification or type of work within the locality and in the nearest labor market area. The determination of whether a project is deemed a “public work” is important because the Labor Code requires (except for projects of $1,000 or less) that the prevailing wage be paid to all workers employed on public works projects.
In general, “public works” is defined to include construction, alteration, demolition, installation or repair work done under contract and “paid for in whole or in part out of public funds.” Almost 20 years ago, there was much administrative and legislative action over what constituted the term “paid for in whole or in part out of public funds.” These debates culminated in the enactment of SB 975 (Alarcón, Chapter 938, Statutes of 2001), which codified a definition of “paid for in whole or in part out of public funds” as well as exempted certain affordable housing, residential and private development projects, as specified. Currently, “paid for in whole or in part out of public funds” is defined as, among other things, “fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations normally required in the execution of a contract that are paid, reduced, charged at less than fair market value, waived or forgiven.”
Comments
Need for this bill? According to the author, there is some confusion between awarding agencies, contractors and labor groups pertaining to when and where prevailing wage requirements apply on preconstruction activities. As noted above, the definition of “construction” on public works projects is defined to include work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work. While the statute makes clear that “preconstruction” phases of a project fall under the definition of public works and thus require the payment of prevailing wage, the author argues that the ambiguity as to what is considered preconstruction work has led to confusion.
The author argues that site assessments and feasibility studies are at the core of preconstruction work in that a project would typically not move forward without the successful completion of an assessment of the land. According to the author, given the vagueness of the term “preconstruction,” the potential exists for contractors to determine that some aspects of preconstruction, including site assessments and feasibility studies, do not meet their definition of construction and do not require prevailing wage.
This bill makes two changes to the definition of “construction” under public works provisions to: (1) include any work performed during construction site assessments and feasibility studies, and (2) specify that preconstruction work, including design, site assessments, feasibility studies, inspections and land surveying work is deemed part of a “public work,” regardless of whether any further construction work is conducted.
Related/Prior Legislation
AB 1613 (O’Donnell, 2019) expands the definition of “public works” to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a charter school when the project is paid for, in whole or in part, with the proceeds of conduit revenue bonds.
AB 1066 (Aguiar-Curry, Chapter 616, Statutes of 2017) expanded the meaning of the term “public works” to include specific types of tree removal work.
AB 852 (Burke, Chapter 745, Statutes of 2015) expanded the definition of public works projects to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a general acute care hospital funded in whole or in part by conduit revenue bonds.
AB 26 (Bonilla, Chapter 864, Statutes of 2014) expanded the definition of “public works” to include work performed during the design and preconstruction phases of construction, as specified, and work performed during the postconstruction phases of construction, as specified.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
International Union of Operating Engineers, California-Nevada Conference (co-source)
State Building and Construction Trades Council (co-source)
California Teamsters
None received
ARGUMENTS IN SUPPORT: According to the State Building and Construction Trades Council, “there exists a need to clarify what is covered under preconstruction in order to ensure workers receive their fair wages and avoid disagreements amongst construction industry stakeholders as to when the prevailing wage requirements apply.” Furthermore, they state “These assessments and studies cover a wide range of factors relating to the project, including determining land boundaries and land use patterns. Site assessments and feasibility studies are at the core of preconstruction work because a project may not move forward without their successful completion. By clarifying that preconstruction of public works projects also includes site assessments and feasibility studies under the definition of construction, AB 1768 will ensure workers performing these tasks are paid the wages and benefits they deserve.”
ASSEMBLY FLOOR: 61-12, 5/13/19
AYES: Aguiar-Curry, Bauer-Kahan, Berman, Bloom, Boerner Horvath, Bonta, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Chu, Cooley, Cooper, Cunningham, Daly, Diep, Eggman, Flora, Friedman, Gabriel, Cristina Garcia, Eduardo Garcia, Gipson, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Levine, Limón, Low, Maienschein, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Weber, Wicks, Wood, Rendon
NOES: Bigelow, Choi, Fong, Gallagher, Kiley, Lackey, Mathis, Melendez, Obernolte, Patterson, Voepel, Waldron
NO VOTE RECORDED: Arambula, Brough, Burke, Dahle, Frazier, Gloria, Mayes
Prepared by: Alma Perez-Schwab / L., P.E. & R. / (916) 651-1556
9/9/19 18:30:55
**** END ****
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1768 |
THIRD READING
Bill No: AB 1768
Amended: 3/21/19 in Assembly
SENATE LABOR, PUB. EMP. & RET. COMMITTEE: 4-1, 6/12/19
AYES: Hill, Jackson, Mitchell, Pan
NOES: Morrell
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 61-12, 5/13/19 - See last page for vote
SUBJECT: Prevailing wage: public works
SOURCE: International Union of Operating Engineers, California-Nevada
Conference
State Building and Construction Trades Council
DIGEST:
This bill expands the definition of public works, triggering the payment of prevailing wages, to include work conducted during site assessment or feasibility studies. This bill also specifies that preconstruction work is deemed part of a public work, regardless of whether any further construction work is conducted.
Existing law:
- Requires that not less than the general prevailing rate of per diem wages be paid to all workers employed on a “public works” project costing over $1,000 and imposes misdemeanor penalties for violation of this requirement. (Labor Code §1771)
- Defines “public work” to include, among other things, construction, alteration, demolition, installation or repair work done under contract and paid for in whole or in part out of public funds, except work done directly by any public utility company pursuant to an order of the Public Utilities Commission or other public authority. (Labor Code §1720(a))
- Specifies that for prevailing wage purposes, “construction” includes work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. (Labor Code §1720(a))
- Defines “paid for in whole or in part out of public funds” as, among other things, “Fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations normally required in the execution of a contract that are paid, reduced, charged at less than fair market value, waived or forgiven.” (Labor Code §1720(b))
- Requires that the applicable general prevailing rate of per diem wages be determined by the Director of the Department of Industrial Relations (DIR) for each locality in which the public work is to be performed and for each craft, classification, or type of worker needed to execute the public works project. (Labor Code §1773)
- Provides that private residential projects built on private property are not subject to the requirements of public works provisions, unless the projects are built pursuant to an agreement with a state agency, redevelopment agency, or local public housing authority. (Labor Code §1720(c)(1))
- Authorizes the Labor Commissioner, or their designee, to issue civil wage and penalty assessments on a contractor or subcontractor, or both, that fails to pay prevailing wages in connection with a public work. (Labor Code §1741)
This bill:
- Expands on the definition of “public works,” triggering the payment of prevailing wages, to include work performed during construction site assessments and feasibility studies.
- Specifies that preconstruction work, including design, site assessments, feasibility studies, inspections and land surveying work is deemed part of a “public work,” regardless of whether any further construction work is conducted.
Background
“Public Works” and Prevailing Wage. Existing law requires that not less than the general prevailing wage rate of per diem wages, as determined by the Director of DIR, be paid to all workers employed on a “public works” projects. The prevailing wage rate is the basic hourly rate paid on public works projects to a majority of workers engaged in a particular craft, classification or type of work within the locality and in the nearest labor market area. The determination of whether a project is deemed a “public work” is important because the Labor Code requires (except for projects of $1,000 or less) that the prevailing wage be paid to all workers employed on public works projects.
In general, “public works” is defined to include construction, alteration, demolition, installation or repair work done under contract and “paid for in whole or in part out of public funds.” Almost 20 years ago, there was much administrative and legislative action over what constituted the term “paid for in whole or in part out of public funds.” These debates culminated in the enactment of SB 975 (Alarcón, Chapter 938, Statutes of 2001), which codified a definition of “paid for in whole or in part out of public funds” as well as exempted certain affordable housing, residential and private development projects, as specified. Currently, “paid for in whole or in part out of public funds” is defined as, among other things, “fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations normally required in the execution of a contract that are paid, reduced, charged at less than fair market value, waived or forgiven.”
Comments
Need for this bill? According to the author, there is some confusion between awarding agencies, contractors and labor groups pertaining to when and where prevailing wage requirements apply on preconstruction activities. As noted above, the definition of “construction” on public works projects is defined to include work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work. While the statute makes clear that “preconstruction” phases of a project fall under the definition of public works and thus require the payment of prevailing wage, the author argues that the ambiguity as to what is considered preconstruction work has led to confusion.
The author argues that site assessments and feasibility studies are at the core of preconstruction work in that a project would typically not move forward without the successful completion of an assessment of the land. According to the author, given the vagueness of the term “preconstruction,” the potential exists for contractors to determine that some aspects of preconstruction, including site assessments and feasibility studies, do not meet their definition of construction and do not require prevailing wage.
This bill makes two changes to the definition of “construction” under public works provisions to: (1) include any work performed during construction site assessments and feasibility studies, and (2) specify that preconstruction work, including design, site assessments, feasibility studies, inspections and land surveying work is deemed part of a “public work,” regardless of whether any further construction work is conducted.
Related/Prior Legislation
SB 533 (Monning, 2019) specifies that work performed within the territory of Fort Ord for which a contractor or subcontractor is required to pay prevailing wages pursuant to a resolution of the board, deed restriction, or covenant shall be deemed “public works.”
AB 1613 (O’Donnell, 2019) expands the definition of “public works” to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a charter school when the project is paid for, in whole or in part, with the proceeds of conduit revenue bonds.
AB 1066 (Aguiar-Curry, Chapter 616, Statutes of 2017) expanded the meaning of the term “public works” to include specific types of tree removal work.
AB 852 (Burke, Chapter 745, Statutes of 2015) expanded the definition of public works projects to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a general acute care hospital funded in whole or in part by conduit revenue bonds.
AB 26 (Bonilla, Chapter 864, Statutes of 2014) expanded the definition of “public works” to include work performed during the design and preconstruction phases of construction, as specified, and work performed during the postconstruction phases of construction, as specified.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
International Union of Operating Engineers, California-Nevada Conference (co-source)
State Building and Construction Trades Council (co-source)
California Teamsters
None received
ARGUMENTS IN SUPPORT: According to the State Building and Construction Trades Council, “there exists a need to clarify what is covered under preconstruction in order to ensure workers receive their fair wages and avoid disagreements amongst construction industry stakeholders as to when the prevailing wage requirements apply.” Furthermore, they state “These assessments and studies cover a wide range of factors relating to the project, including determining land boundaries and land use patterns. Site assessments and feasibility studies are at the core of preconstruction work because a project may not move forward without their successful completion. By clarifying that preconstruction of public works projects also includes site assessments and feasibility studies under the definition of construction, AB 1768 will ensure workers performing these tasks are paid the wages and benefits they deserve.”
ASSEMBLY FLOOR: 61-12, 5/13/19
AYES: Aguiar-Curry, Bauer-Kahan, Berman, Bloom, Boerner Horvath, Bonta, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Chu, Cooley, Cooper, Cunningham, Daly, Diep, Eggman, Flora, Friedman, Gabriel, Cristina Garcia, Eduardo Garcia, Gipson, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Levine, Limón, Low, Maienschein, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Weber, Wicks, Wood, Rendon
NOES: Bigelow, Choi, Fong, Gallagher, Kiley, Lackey, Mathis, Melendez, Obernolte, Patterson, Voepel, Waldron
NO VOTE RECORDED: Arambula, Brough, Burke, Dahle, Frazier, Gloria, Mayes
Prepared by: Alma Perez-Schwab / L., P.E. & R. / (916) 651-1556
7/3/19 14:36:36
**** END ****
SENATE COMMITTEE ON LABOR, PUBLIC EMPLOYMENT AND RETIREMENT
Senator Jerry Hill, Chair
2019 - 2020 Regular
Bill No: AB 1768 Hearing Date: June 12, 2019
Author: | Carrillo | ||
Version: | March 21, 2019 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Alma Perez-Schwab | ||
SUBJECT: Prevailing wage: public works
KEY ISSUES
Should the definition of “public works” be expanded to include work performed during construction site assessments and feasibility studies thereby requiring the payment of prevailing wages for this work?
Should this and other preconstruction work be considered “public works” regardless of whether any further construction work is conducted?
ANALYSIS
Existing law:
- Requires that not less than the general prevailing rate of per diem wages be paid to all workers employed on a "public works" project costing over $1,000 dollars and imposes misdemeanor penalties for violation of this requirement. (Labor Code §1771)
- Defines "public work" to include, among other things, construction, alteration, demolition, installation or repair work done under contract and paid for in whole or in part out of public funds, except work done directly by any public utility company pursuant to an order of the Public Utilities Commission or other public authority. [Labor Code §1720(a)]
- Specifies that for prevailing wage purposes, “construction” includes work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. [Labor Code §1720(a)]
- Defines “paid for in whole or in part out of public funds” as, among other things, “Fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations normally required in the execution of a contract that are paid, reduced, charged at less than fair market value, waived or forgiven.” [Labor Code §1720(b)]
- Requires that the applicable general prevailing rate of per diem wages be determined by the Director of the Department of Industrial Relations (DIR) for each locality in which the public work is to be performed and for each craft, classification, or type of worker needed to execute the public works project. (Labor Code §1773)
- Provides that private residential projects built on private property are not subject to the requirements of public works provisions, unless the projects are built pursuant to an agreement with a state agency, redevelopment agency, or local public housing authority. [Labor Code §1720(c)(1)]
- Authorizes the Labor Commissioner, or their designee, to issue civil wage and penalty assessments on a contractor or subcontractor, or both, that fails to pay prevailing wages in connection with a public work. (Labor Code §1741)
This bill:
- Expands on the definition of “public works,” triggering the payment of prevailing wages, to include work performed during construction site assessments and feasibility studies.
- Specifies that preconstruction work, including design, site assessments, feasibility studies, inspections and land surveying work is deemed part of a “public work,” regardless of whether any further construction work is conducted.
COMMENTS
1. Background on “Public Works” and Prevailing Wage:
Existing law requires that not less than the general prevailing wage rate of per diem wages, as determined by the director of the Department of Industrial Relations (DIR), be paid to all workers employed on a “public works” projects. The prevailing wage rate is the basic hourly rate paid on public works projects to a majority of workers engaged in a particular craft, classification or type of work within the locality and in the nearest labor market area. The determination of whether a project is deemed a "public work" is important because the Labor Code requires (except for projects of $1,000 or less) that the prevailing wage be paid to all workers employed on public works projects.
In general, "public works" is defined to include construction, alteration, demolition, installation or repair work done under contract and "paid for in whole or in part out of public funds." Almost twenty years ago, there was much administrative and legislative action over what constituted the term "paid for in whole or in part out of public funds." These debates culminated in the enactment of SB 975 (Alarcón), Chapter #938, Statutes of 2001, which codified a definition of "paid for in whole or in part out of public funds" as well as exempted certain affordable housing, residential and private development projects, as specified. Currently, “paid for in whole or in part out of public funds” is defined as, among other things, “fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations normally required in the execution of a contract that are paid, reduced, charged at less than fair market value, waived or forgiven.”
2. Need for this bill?
According to the author, there is some confusion between awarding agencies, contractors and labor groups pertaining to when and where prevailing wage requirements apply on preconstruction activities. As noted above, the definition of "construction" on public works projects is defined to include work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work. While the statute makes clear that “preconstruction” phases of a project fall under the definition of public works and thus require the payment of prevailing wage, the author argues that the ambiguity as to what is considered preconstruction work has led to confusion.
The author argues that site assessments and feasibility studies are at the core of preconstruction work in that a project would typically not move forward without the successful completion of an assessment of the land. According to the author, given the vagueness of the term “preconstruction,” the potential exists for contractors to determine that some aspects of preconstruction, including site assessments and feasibility studies, do not meet their definition of construction and do not require prevailing wage.
This bill makes two changes to the definition of “construction” under public works provisions to: 1) include any work performed during construction site assessments and feasibility studies, and 2) specify that preconstruction work, including design, site assessments, feasibility studies, inspections and land surveying work is deemed part of a “public work,” regardless of whether any further construction work is conducted.
3. Proponent Arguments
According to the State Building and Construction Trades Council, “there exists a need to clarify what is covered under preconstruction in order to ensure workers receive their fair wages and avoid disagreements amongst construction industry stakeholders as to when the prevailing wage requirements apply.” Furthermore, they state “These assessments and studies cover a wide range of factors relating to the project, including determining land boundaries and land use patterns. Site assessments and feasibility studies are at the core of preconstruction work because a project may not move forward without their successful completion. By clarifying that preconstruction of public works projects also includes site assessments and feasibility studies under the definition of construction, AB 1768 will ensure workers performing these tasks are paid the wages and benefits they deserve.”
4. Opponent Arguments:
None received.
5. Prior and Related Legislation:
SB 533 (Monning) of 2019, currently pending in this Committee, would specify that work performed within the territory of Fort Ord for which a contractor or subcontractor is required to pay prevailing wages pursuant to a resolution of the board, deed restriction, or covenant shall be deemed “public works.”
AB 1613 (O’Donnell) of 2019 would expand the definition of “public works” to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a charter school when the project is paid for, in whole or in part, with the proceeds of conduit revenue bonds. AB 1613 is pending Referral in Senate Rules.
AB 3222 (O’Donnell) of 2018, held in Senate Appropriations Committee, was similar to AB 1613 from this year, discussed above.
AB 1066 (Aguiar-Curry) Chapter 616, Statutes of 2017 expanded the meaning of the term “public works” to include specific types of tree removal work.
AB 852 (Burke), Chapter 745, Statutes of 2015, expanded the definition of public works projects to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a general acute care hospital funded in whole or in part by conduit revenue bonds.
AB 26 (Bonilla) Chapter 864, Statutes of 2014, expanded the definition of “public works” to include work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite.
SUPPORT
International Union of Operating Engineers, CAL-Nevada Conference (Co-Sponsor)
State Building and Construction Trades Council (Co-Sponsor)
California Teamsters
OPPOSITION
None received
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 1768
Author:(Carrillo)
As Amended Ver:March 21, 2019
Majority vote
SUMMARY:
Expands the definition of "public works" to include work performed during construction site assessments and feasibility studies, and specifies that preconstruction work is a part of "public works," regardless of whether any further construction work is conducted.
Major Provisions
See summary.
COMMENTS:
Existing law requires prevailing wages be paid to all workers on most public works projects. In general, "public works" is defined to include construction, alteration, demolition, installation or repair work done under contract and "paid for in whole or in part out of public funds." These laws aim to provide construction workers on these projects a wage that is commonly paid to similar construction workers in a particular region.
According to the Author:
"While the statute makes clear that 'preconstruction' phases of a project fall under the definition of public works and thus require the payment of prevailing wage, the ambiguity as to what is considered preconstruction work has led to confusion amongst stakeholders in the construction industry as to when prevailing wage requirements apply.
Site assessments and feasibility studies are crucial to construction projects as they typically determine the suitability of the land where a project is to potentially be built. These assessments and studies typically cover a wide range of factors as it relates to a project, including, but not limited to, determining land boundaries and land use patterns.
Simply put, site assessments and feasibility studies are at the core of preconstruction work in that a project would typically not move forward without the successful completion of an assessment of the land."
Arguments in Support:
The State Building and Construction Trades Council, AFL-CIO, a co-sponsor of the bill, states, "By clarifying that preconstruction of public works projects also includes site assessments and feasibility studies under the definition of construction, AB 1768 will ensure workers performing these tasks are paid the wages and benefits they deserve."
In addition, the California-Nevada Conference of Operating Engineers, co-sponsor of the bill, states that the bill captures the full scope of a project "by specifying that site assessments and feasibility studies fall under the definition of construction, regardless of whether further construction is performed after the assessment is completed."
Arguments in Opposition:
No known opposition on file.
FISCAL COMMENTS:
According to the Assembly Appropriations Committee minor and absorbable state costs.
VOTES:
ASM LABOR AND EMPLOYMENT: 7-0-0
YES: Kalra, Flora, Carrillo, Diep, Gonzalez, Jones-Sawyer, Luz Rivas
ASM APPROPRIATIONS: 14-4-0
YES: Gonzalez, Bloom, Bonta, Calderon, Carrillo, Chau, Diep, Eggman, Gabriel, Eduardo Garcia, Maienschein, Petrie-Norris, Quirk, Robert Rivas
NO: Bigelow, Brough, Fong, Obernolte
UPDATED:
VERSION: March 21, 2019
CONSULTANT: Megan Lane / L. & E. / (916) 391-2091 FN: 0000394
Date of Hearing: May 8, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 1768
Author:(Carrillo) – As Amended Ver:March 21, 2019
Policy Committee: | Labor and Employment | Vote: | 7 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill makes two changes to the definition of “construction” as it related to public works projects. First, this bill includes in construction any work performed during the site assessment and during a feasibility study. Second, this bill clarifies that “inspection and land surveying work” is considered construction regardless of whether any further construction work is conducted.
FISCAL EFFECT:
Minor and absorbable state costs.
COMMENTS:
- Prevailing wage laws. Existing law requires prevailing wages be paid to all workers on most public works projects. In general, "public works" is defined to include construction, alteration, demolition, installation or repair work done under contract and "paid for in whole or in part out of public funds." These laws aim to provide construction workers on these projects a wage that is commonly paid to similar construction workers in a particular region.
- Purpose. According to the author, AB 1768 will clarify that site assessments and feasibility studies, which are crucial to determining the feasibility of a project, are at the core of preconstruction work.
- Antelope Valley project. In early 2017, the Department of Industrial Relations (DIR) issued a determination that work done to conduct a feasibility study was a public work and therefore subject to prevailing wage requirements. This case revolved around a state grant to Antelope Valley Water Storage, LLC for the purposes of studying a potential energy storage technology.
Analysis Prepared by: Luke Reidenbach / APPR. / (916) 319-2081
Date of Hearing: April 24, 2019
ASSEMBLY COMMITTEE ON LABOR AND EMPLOYMENT
Ash Kalra, Chair
ABPCA Bill Id:AB 1768 (
Author:Carrillo) – As Amended Ver:March 21, 2019
SUBJECT: Prevailing wage: public works
SUMMARY: Expands the definition of “public works” to include work performed during construction site assessments and feasibility studies, and specifies that preconstruction work is a part of “public works,” regardless of whether any further construction work is conducted.
EXISTING LAW:
- Defines the term “public works” as, among other things, the construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds, except work done directly by any public utility company pursuant to order of the Public Utilities Commission or other public authority.
- Establishes requirements regarding the payment of prevailing wages, the regulation of working hours, and the securing of workers’ compensation for public works projects.
- Requires that, except as specified, not less than the general prevailing rate of per diem wages, determined by the Director of Industrial Relations, be paid to workers employed on public works projects.
- Establishes that a willful violation of laws relating to the payment of prevailing wages on public works is a misdemeanor.
FISCAL EFFECT: Unknown
COMMENTS: According to the author, “While the statute makes clear that ‘preconstruction’ phases of a project fall under the definition of public works and thus require the payment of prevailing wage, the ambiguity as to what is considered preconstruction work has led to confusion amongst stakeholders in the construction industry as to when prevailing wage requirements apply.
Site assessments and feasibility studies are crucial to construction projects as they typically determine the suitability of the land where a project is to potentially be built. These assessments and studies typically cover a wide range of factors as it relates to a project, including, but not limited to, determining land boundaries and land use patterns.
Simply put, site assessments and feasibility studies are at the core of preconstruction work in that a project would typically not move forward without the successful completion of an assessment of the land.”
Arguments in Support
The State Building and Construction Trades Council, AFL-CIO, a co-sponsor of the bill, states, “By clarifying that preconstruction of public works projects also includes site assessments and feasibility studies under the definition of construction, AB 1768 will ensure workers performing these tasks are paid the wages and benefits they deserve.”
In addition, the California-Nevada Conference of Operating Engineers, co-sponsor of the bill, states that the bill captures the full scope of a project “by specifying that site assessments and feasibility studies fall under the definition of construction, regardless of whether further construction is performed after the assessment is completed.”
No known opposition on file.
Related and Prior Legislation
AB 1613 (O’Donnell) of 2019 would expand the definition of “public works,” for the purposes of provisions relating to the prevailing rate of per diem wages, to also include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a charter school, as defined, when the project is paid for, in whole or in part, with the proceeds of conduit revenue bonds. The bill is currently pending in this Committee.
AB 1066 (Aguiar-Curry) Chapter 616, Statutes of 2017 expanded the meaning of the term “public works” to include specific types of tree removal work.
AB 852 (Burke), Chapter 745, Statutes of 2015, expanded the definition of public works projects to include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a general acute care hospital funded in whole or in part by conduit revenue bonds.
AB 26 (Bonilla) Chapter 864, Statutes of 2014, expanded the definition of “public works” to include work performed during the design and preconstruction phases of construction, including, but not limited to, inspection and land surveying work, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite.
REGISTERED SUPPORT / OPPOSITION:
Support
International Union of Operating Engineers, Cal-Nevada Conference (sponsor)
State Building and Construction Trades Council of CA (cosponsor)
Opposition
None on file.
Analysis Prepared by: Megan Lane / L. & E. /
Bill Author
Bill Co-Author(s):