AB 2700: Transportation electrification: electrical distribution grid upgrades.
- Session Year: 2021-2022
- House: Assembly
- Latest Version Date: 2022-09-16
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require the Energy Commission, in collaboration with the State Air Resources Board, the PUC, and other relevant stakeholders, to annually gather from state agencies, as provided, specified entities fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. The bill would prohibit electrical corporations and local publicly owned electric utilities from disclosing that data to third parties. The bill would require electrical corporations and local publicly owned electric utilities, as part of their distribution planning processes, to consider the fleet data produced by the Energy Commission pursuant to this bill, and other available data, to facilitate the readiness of their distribution systems to support the states anticipated level of electric vehicle charging, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require the Energy Commission, in collaboration with the State Air Resources Board, the PUC, and other relevant stakeholders, to annually gather from state agencies, as provided, specified entities fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. The bill would prohibit electrical corporations and local publicly owned electric utilities from disclosing that data to third parties. The bill would require electrical corporations and local publicly owned electric utilities, as part of their distribution planning processes, to consider the fleet data produced by the Energy Commission pursuant to this bill, and other available data, to facilitate the readiness of their distribution systems to support the states anticipated level of electric vehicle charging, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require the Energy Commission, in collaboration with the State Air Resources Board, the PUC, and other relevant stakeholders, to annually gather from state agencies, as provided, specified entities fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. The bill would prohibit electrical corporations and local publicly owned electric utilities from disclosing that data to third parties. The bill would require electrical corporations and local publicly owned electric utilities, as part of their distribution planning processes, to consider the fleet data produced by the Energy Commission pursuant to this bill, and other available data, to facilitate the readiness of their distribution systems to support the states anticipated level of electric vehicle charging, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require the Energy Commission, in collaboration with the State Air Resources Board, the PUC, and other relevant stakeholders, to annually gather fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. The bill would prohibit electrical corporations and local publicly owned electric utilities from disclosing that data to third parties. The bill would require electrical corporations and local publicly owned electric utilities, as part of their distribution planning processes, to consider the fleet data produced by the Energy Commission pursuant to this bill, and other available data, to facilitate the readiness of their distribution systems to support the states anticipated level of electric vehicle charging, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require the Energy Commission, in collaboration with the State Air Resources Board Board, the PUC, and other relevant stakeholders, to annually gather fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. The bill would prohibit electrical corporations and local publicly owned electric utilities from disclosing that data to third parties. The bill would require electrical corporations and local publicly owned electric utilities, as part of their distribution planning processes, to incorporate consider the fleet data produced by the State Air Resources Board Energy Commission pursuant to this bill, and other available data, to facilitate the readiness of their distribution systems to support the states anticipated level of electric vehicle charging, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require the State Air Resources Board to annually gather fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. The bill would require electrical corporations and local publicly owned electric utilities to use all available data to project future electric vehicle charging requirements to ensure that their distribution systems are upgraded at the times and locations necessary utilities, as part of their distribution planning processes, to incorporate fleet data produced by the State Air Resources Board pursuant to this bill, and other available data, to facilitate the readiness of their distribution systems to support the states anticipated level of electric vehicle charging. The bill would require the PUC, by July 1, 2024, to the extent that there are any permitting or licensing requirements for transmission or distribution grid upgrades necessary to support the anticipated level of electric vehicle charging, to expedite existing permitting and licensing processes to ensure that electrical corporations can meet the requirements to upgrade their distribution systems, and to direct electrical corporations to develop an expedited process for grid interconnection for transportation electrification. The bill would require the State Air Resources Board to annually gather and share fleet data from entities subject to its regulations with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified. charging, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require electrical corporations and local publicly owned electric utilities to use all available data to project future electric vehicle charging requirements to ensure that their distribution systems are upgraded at the times and locations necessary to support the states anticipated level of electric vehicle charging. The bill would require the PUC, by July 1, 2024, to the extent that there are any permitting or licensing requirements for transmission or distribution grid upgrades necessary to support the anticipated level of electric vehicle charging, to develop an expedited process expedite existing permitting and licensing processes to ensure that electrical corporations can meet the requirements to upgrade their distribution systems, and to direct electrical corporations to develop an expedited process for grid interconnection. interconnection for transportation electrification. The bill would require the State Air Resources Board to annually gather and share fleet data from entities subject to its regulations with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified, and would require the Energy Commission to develop more sophisticated distribution system electrical grid-needs forecasting that includes transportation electrification, building electrification, industrial electrification, distributed energy resources, and energy efficiency necessary to meet the states goals. specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the certain provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) and the State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. Existing law requires the Energy Commission, working with the state board and the PUC, to prepare, at least once every 2 years, a statewide assessment of the electrical vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet certain goals.
This bill would require electrical corporations and local publicly owned electric utilities to ensure that their distribution systems are upgraded at the times and locations necessary to support the states anticipated level of electric vehicle charging. The bill would require the PUC, by July 1, 2024, to the extent that there are any permitting or licensing requirements for transmission or distribution grid upgrades necessary to support the anticipated level of electric vehicle charging, to develop an expedited process to ensure that electrical corporations can meet the requirements to upgrade their distribution systems, and to direct electrical corporations to develop an expedited process for grid interconnection. The bill would require the State Air Resources Board to annually gather and share fleet data from entities subject to its regulations with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, as specified, and would require the Energy Commission to develop more sophisticated distribution system electrical grid-needs forecasting that includes transportation electrification, building electrification, industrial electrification, distributed energy resources, and energy efficiency necessary to meet the states goals.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing the bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Global Warming Solutions Act of 2006 designates the State Air Resources Board as the state agency charged with monitoring and regulating sources of emissions of greenhouse gases. The state board is required to approve a statewide greenhouse gas emissions limit equivalent to the statewide greenhouse gas emissions level in 1990 to be achieved by 2020 and to ensure that statewide greenhouse gas emissions are reduced to at least 40% below the 1990 level by 2030. The act requires the state board to prepare and approve a scoping plan for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases by 2020 and to update the scoping plan at least once every 5 years. This bill would require the scoping plan to be for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases consistent with limits established by the act.The California Global Warming Solutions Act of 2006 designates the State Air Resources Board as the state agency charged with monitoring and regulating sources of emissions of greenhouse gases. The state board is required to approve a statewide greenhouse gas emissions limit equivalent to the statewide greenhouse gas emissions level in 1990 to be achieved by 2020 and to ensure that statewide greenhouse gas emissions are reduced to at least 40% below the 1990 level by 2030. The act requires the state board to prepare and approve a scoping plan for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases by 2020 and to update the scoping plan at least once every 5 years.
This bill would require the scoping plan to be for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases consistent with limits established by the act.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles everywhere feasible by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The commission, in collaboration with the State Air Resources Board, the Public Utilities Commission, and other relevant stakeholders, shall do both of the following:
(1)Annually gather entities fleet data from state agencies that already collect fleet data, including, but not limited to, data collected by the State Air Resources Board pursuant to its zero-emission vehicle regulations, and vehicle registration data collected by the Department of Motor Vehicles, to the extent that such data is collected by state agencies at the time. The data collected from state agencies pursuant to this paragraph shall encompass fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors of only those entities that are subject to the regulations of the State Air Resources Board, and shall include, but not be limited to, all of the following data:
(A)The total vehicle fleet or equipment size and composition, including each vehicles fuel type, including battery electric, plug-in hybrid, or fuel cell.
(B)The physical address of the fleets location.
(C)Information that would allow the electrical corporation or local publicly owned electric utility to estimate the total anticipated charging capacity at each fleet location.
(2)Enter into data sharing agreements with state agencies, as necessary, to facilitate the gathering of data pursuant to this section.
(c)The commission shall share the data gathered pursuant to subdivision (b) with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts.
(d)For data shared pursuant to subdivision (c), an electrical corporation or local publicly owned utility shall not disclose information protected pursuant to Sections 8380 and 8381 of the Public Utilities Code.
(e)For data shared pursuant to subdivision (c), an electrical corporation or local publicly owned utility shall not disclose the data to third parties for any purpose.
(f)The commissions data collection pursuant to this section is not intended to create any new or duplicate reporting requirements on behalf of fleet operators.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Each electrical corporation, as part of its distribution planning process, shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated in its service territory by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In its general rate case, each electrical corporation shall identify how investments made pursuant to this section will support electric vehicle deployment within its service territory. Each electrical corporation shall consider the electric vehicle deployment goals in Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, and the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code. Each electrical corporation may also consider relevant State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(c)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a).
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.(a)In its relevant distribution planning process, a local publicly owned electric utility shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, and relevant State Air Resources Board regulations. The local publicly owned electric utilitys consideration shall also include, as applicable and available, other local plans related to electric vehicle charging, including air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)A local publicly owned electric utility shall identify any distribution investments made pursuant to this section in its integrated resource plan adopted pursuant to Section 9621.
SEC. 5.The Legislature finds and declares that Section 2 of this act, which adds Section 25328 of the Public Resources Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and proprietary information of an entity subject to Section 2 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles everywhere feasible by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The commission, in collaboration with the State Air Resources Board, the Public Utilities Commission, and other relevant stakeholders, shall do both of the following:
(1)Annually gather entities fleet data from state agencies that already collect fleet data, including, but not limited to, data collected by the State Air Resources Board pursuant to its zero-emission vehicle regulations, and vehicle registration data collected by the Department of Motor Vehicles, to the extent that such data is collected by state agencies at the time. The data collected from state agencies pursuant to this paragraph shall encompass fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors of only those entities that are subject to the regulations of the State Air Resources Board, and shall include, but not be limited to, all of the following data:
(A)The total vehicle fleet or equipment size and composition, including each vehicles fuel type, including battery electric, plug-in hybrid, or fuel cell.
(B)The physical address of the fleets location.
(C)Information that would allow the electrical corporation or local publicly owned electric utility to estimate the total anticipated charging capacity at each fleet location.
(2)Enter into data sharing agreements with state agencies, as necessary, to facilitate the gathering of data pursuant to this section.
(c)The commission shall share the data gathered pursuant to subdivision (b) with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts.
(d)For data shared pursuant to subdivision (c), an electrical corporation or local publicly owned utility shall not disclose information protected pursuant to Sections 8380 and 8381 of the Public Utilities Code.
(e)For data shared pursuant to subdivision (c), an electrical corporation or local publicly owned utility shall not disclose the data to third parties for any purpose.
(f)The commissions data collection pursuant to this section is not intended to create any new or duplicate reporting requirements on behalf of fleet operators.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Each electrical corporation, as part of its distribution planning process, shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated in its service territory by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In its general rate case, each electrical corporation shall identify how investments made pursuant to this section will support electric vehicle deployment within its service territory. Each electrical corporation shall consider the electric vehicle deployment goals in Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, and the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code. Each electrical corporation may also consider relevant State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(c)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a).
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.(a)In its relevant distribution planning process, a local publicly owned electric utility shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, and relevant State Air Resources Board regulations. The local publicly owned electric utilitys consideration shall also include, as applicable and available, other local plans related to electric vehicle charging, including air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)A local publicly owned electric utility shall identify any distribution investments made pursuant to this section in its integrated resource plan adopted pursuant to Section 9621.
SEC. 5.The Legislature finds and declares that Section 2 of this act, which adds Section 25328 of the Public Resources Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and proprietary information of an entity subject to Section 2 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles everywhere feasible by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The commission, in collaboration with the State Air Resources Board, the Public Utilities Commission, and other relevant stakeholders, shall annually do both of the following:
(1)Annually gather entities fleet data from state agencies that already collect fleet data, including, but not limited to, data collected by the State Air Resources Board pursuant to its zero-emission vehicle regulations, and vehicle registration data collected by the Department of Motor Vehicles, to the extent that such data is collected by state agencies at the time. The data collected from state agencies pursuant to this paragraph shall encompass fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from of only those entities that are subject to its the regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, including, but not limited to, of the State Air Resources Board, and shall include, but not be limited to, all of the following data:
(1)(A)The total vehicle fleet or equipment size and composition, including each vehicles fuel type, including battery electric, plug-in hybrid, or fuel cell.
(2)(B)The physical address of the fleets location.
(3)(C)Information that would allow the electrical corporation or local publicly owned electric utility to estimate the total anticipated charging capacity at each fleet location.
(2)Enter into data sharing agreements with state agencies, as necessary, to facilitate the gathering of data pursuant to this section.
(c)The State Air Resources Board shall conduct outreach to fleets regulated pursuant to its relevant zero-emission fleet vehicle regulations to support the submission of data collected by the commission pursuant to subdivision (b). The commission shall share the data gathered pursuant to subdivision (b) with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts.
(d)For data shared pursuant to subdivision (b), (c), an electrical corporation or local publicly owned utility shall not disclose information protected pursuant to Sections 8380 and 8381 of the Public Utilities Code.
(e)For data shared pursuant to subdivision (b), (c), an electrical corporation or local publicly owned utility shall not disclose the data to third parties for any purpose.
(f)The commissions data collection pursuant to this section is not intended to create any new or duplicate reporting requirements on behalf of fleet operators.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Each electrical corporation, as part of its distribution planning process, shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated in its service territory by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In its general rate case, each electrical corporation shall identify how investments made pursuant to this section will support electric vehicle deployment within its service territory. Each electrical corporation shall consider the electric vehicle deployment goals in Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, and the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code. Each electrical corporation may also consider relevant State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(c)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a).
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.(a)In its relevant distribution planning process, a local publicly owned electric utility shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, and relevant State Air Resources Board regulations. The local publicly owned electric utilitys consideration shall also include, as applicable and available, other local plans related to electric vehicle charging, including air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)A local publicly owned electric utility shall identify any distribution investments made pursuant to this section in its integrated resource plan adopted pursuant to Section 9621.
SEC. 5.The Legislature finds and declares that Section 2 of this act, which adds Section 25328 of the Public Resources Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and proprietary information of an entity subject to Section 2 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles everywhere feasible by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The commission, in collaboration with the State Air Resources Board, the Public Utilities Commission, and other relevant stakeholders, shall annually gather fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, including, but not limited to, all of the following data:
(1)The total vehicle fleet or equipment size and composition, including each vehicles fuel type, including battery electric, plug-in hybrid, or fuel cell.
(2)The physical address of the fleets location.
(3)Information that would allow the electrical corporation or local publicly owned electric utility to estimate the total anticipated charging capacity at each fleet location.
(c)The State Air Resources Board shall conduct outreach to fleets regulated pursuant to its relevant zero-emission fleet vehicle regulations to support the submission of data collected by the commission pursuant to subdivision (b).
(d)For data shared pursuant to subdivision (b), an electrical corporation or local publicly owned utility shall not disclose information protected pursuant to Sections 8380 and 8381 of the Public Utilities Code.
(e)For data shared pursuant to subdivision (b), an electrical corporation or local publicly owned utility shall not disclose the data to third parties for any purpose.
(f)It is the intent of the Legislature that the collection of data pursuant to this section shall not result in duplicate reporting requirements for clean fleets.(f)The commissions data collection pursuant to this section is not intended to create any new or duplicate reporting requirements on behalf of fleet operators.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Each electrical corporation, as part of its distribution planning process, shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated in its service territory by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In its general rate case, each electrical corporation shall identify how investments made pursuant to this section will support electric vehicle deployment within its service territory. Each electrical corporation shall consider the electric vehicle deployment goals in Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, and the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code. Each electrical corporation may also consider relevant State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(c)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a).
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.(a)In its relevant distribution planning process, a local publicly owned electric utility shall consider the fleet data produced by the Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, and relevant State Air Resources Board regulations. The local publicly owned electric utilitys consideration shall also include, as applicable and available, other local plans related to electric vehicle charging, including air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)A local publicly owned electric utility shall identify any distribution investments made pursuant to this section in its integrated resource plan adopted pursuant to Section 9621.
SEC. 5.The Legislature finds and declares that Section 2 of this act, which adds Section 25328 of the Public Resources Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and proprietary information of an entity subject to Section 2 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles everywhere feasible by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The commission, in collaboration with the State Air Resources Board Board, the Public Utilities Commission, and other relevant stakeholders, shall annually gather fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, including, but not limited to, all of the following data:
(1)The total vehicle fleet or equipment size and composition, including each vehicles fuel type, including battery electric, plug-in hybrid, or fuel cell.
(2)The fleet physical address of the fleets location.
(3)The Information that would allow the electrical corporation or local publicly owned electric utility to estimate the total anticipated charging capacity at each fleet location.
(c)The State Air Resources Board shall conduct outreach to fleets regulated pursuant to its relevant zero-emission fleet vehicle regulations to support the submission of data collected by the commission pursuant to subdivision (b).
(d)For data shared pursuant to subdivision (b), an electrical corporation or local publicly owned utility shall not disclose information protected pursuant to Sections 8380 and 8381 of the Public Utilities Code.
(e)For data shared pursuant to subdivision (b), an electrical corporation or local publicly owned utility shall not disclose the data to third parties for any purpose.
(f)It is the intent of the Legislature that the collection of data pursuant to this section shall not result in duplicate reporting requirements for clean fleets.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Each electrical corporation, as part of its distribution planning process, shall incorporate consider the fleet data produced by the State Air Resources Board Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated in its service territory by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In its general rate case, each electrical corporation shall identify how investments made pursuant to this section will support electric vehicle deployment within its service territory. Each electrical corporation shall consider the electric vehicle deployment goals in Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, and the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code. Each electrical corporation may also consider relevant State Air Resources Board regulations, air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)(c)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a), and shall ensure reasonable cost recovery. (a).
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.The governing board of (a)In its relevant distribution planning process, a local publicly owned electric utility, as part of its distribution planning process, shall incorporate utility shall consider the fleet data produced by the State Air Resources Board Energy Commission pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, and relevant State Air Resources Board regulations, regulations. The local publicly owned electric utilitys consideration shall also include, as applicable and available, other local plans related to electric vehicle charging, including air quality management plans, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)A local publicly owned electric utility shall identify any distribution investments made pursuant to this section in its integrated resource plan adopted pursuant to Section 9621.
SEC. 5.The Legislature finds and declares that Section 2 of this act, which adds Section 25328 of the Public Resources Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and proprietary information of an entity subject to Section 2 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 5.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The State Air Resources Board shall annually gather and share fleet data for on-road and off-road vehicles in the medium- and heavy-duty sectors from entities subject to its regulations and share that data with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, including, but not limited to, all of the following data:
(1)The vehicle fleet size and composition, including battery electric, hybrid, or fuel cell.
(2)The fleet location.
(3)The total anticipated charging capacity at each fleet location.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Electrical corporations shall use all available data to project future electric vehicle charging requirements to ensure that their distribution systems are upgraded at the times and locations necessary Each electrical corporation, as part of its distribution planning process, shall incorporate the fleet data produced by the State Air Resources Board pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, the Transportation Agencys Climate Action Plan for Transportation Infrastructure, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a), and shall ensure reasonable cost recovery.(c)On or before January 1, 2024, to the extent that there are any permitting or licensing requirements for transmission or distribution grid upgrades necessary to support the level of electric vehicle charging anticipated by the states transportation electrification goals and regulations, the commission shall do both of the following: (1)Expedite existing permitting and licensing processes to ensure that electrical corporations can meet the requirements of subdivision (a).(2)Direct electrical corporations to develop an expedited process for grid interconnection for transportation electrification, as defined in Section 237.5.SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.The governing board of a local publicly owned electric utility shall use all available data to project future electric vehicle charging requirements to ensure that their distribution systems are upgraded at the times and locations necessary utility, as part of its distribution planning process, shall incorporate the fleet data produced by the State Air Resources Board pursuant to Section 25328 of the Public Resources Code, and other available data, to facilitate the readiness of their distribution systems to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, the Transportation Agencys Climate Action Plan for Transportation Infrastructure, regional seaport plans, regional transportation plans, and sustainable communities strategies.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The State Air Resources Board shall annually gather and share fleet data from entities subject to its regulations with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, including, but not limited to, all of the following data:
(1)The vehicle fleet size and composition, including battery electric, hybrid, or fuel cell.
(2)The fleet location.
(3)The total anticipated charging capacity at each fleet location.
(c)The commission shall develop more sophisticated distribution system electrical grid-needs forecasting that includes transportation electrification, building electrification, industrial electrification, distributed energy resources, and energy efficiency necessary to meet the states goals.SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Electrical corporations shall use all available data to project future electric vehicle charging requirements to ensure that their distribution systems are upgraded at the times and locations necessary to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, the Transportation Agencys Climate Action Plan for Transportation Infrastructure, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)In reviewing electrical corporation proposals to meet the requirements of subdivision (a), the commission shall ensure proposed investments are consistent with preparing the electrical grid for the achievement of the states goals and regulations identified in subdivision (a), and shall ensure reasonable cost recovery.
(b)(c)On or before January 1, 2024, to the extent that there are any permitting or licensing requirements for transmission or distribution grid upgrades necessary to support the level of electric vehicle charging anticipated by the states transportation electrification goals and regulations, the commission shall do both of the following:
(1)Develop an expedited process Expedite existing permitting and licensing processes to ensure that electrical corporations can meet the requirements of subdivision (a).
(2)Direct electrical corporations to develop an expedited process for grid interconnection. interconnection for transportation electrification, as defined in Section 237.5.
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.The governing board of a local publicly owned electric utility shall do both of the following:
(a)Ensure shall use all available data to project future electric vehicle charging requirements to ensure that their distribution systems are upgraded at the times and locations necessary to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, the Transportation Agencys Climate Action Plan for Transportation Infrastructure, regional seaport plans, regional transportation plans, and sustainable communities strategies.(b)Use all available data to project future electric vehicle charging requirements so as to ensure the distribution grid is capable of supporting the level of electric vehicle charging necessary to achieve the states transportation electrification goals and regulations.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Under existing state regulations and goals, the State Energy Resources Conservation and Development Commission and the State Air Resources Board anticipate 8,000,000 electric vehicles in California by 2030.
(2)Widespread electric vehicle charging that is strategically integrated can support the operation of the electric grid to the benefit of all utility customers.
(3)To meet the states climate and air quality goals, especially in areas where there is a concentration of medium- and heavy-duty vehicles and other goods movement equipment, electrical corporations and local publicly owned utilities must be able to proactively plan and build electrical distribution grid upgrades necessary to accommodate the level of electric vehicle charging anticipated by the State Energy Resources Conservation and Development Commission and the State Air Resources Board.
(4)Improved strategic planning and investment by electrical corporations and local publicly owned utilities to accommodate electric vehicle charging will help achieve the states goals, avoid delays, minimize costs, and maximize benefits.
(b)It is the policy of the state and the intent of the Legislature to encourage transportation electrification as a means to achieve ambient air quality standards and the states climate goals.
SEC. 2.Section 25328 is added to the Public Resources Code, to read:25328.(a)In order to achieve the states goal of reaching 100 percent zero-emission vehicles for new passenger vehicles sales by 2035 and for medium- and heavy-duty vehicles by 2045, it is the intent of the Legislature to advance zero-emission infrastructure deployment.
(b)The State Air Resources Board shall annually gather and share fleet data from entities subject to its regulations with electrical corporations and local publicly owned electric utilities to help inform electrical grid planning efforts, including, but not limited to, all of the following data:
(1)The vehicle fleet size and composition, including battery electric, hybrid, or fuel cell.
(2)The fleet location.
(3)The total anticipated charging capacity at each fleet location.
(c)The commission shall develop more sophisticated distribution system electrical grid-needs forecasting that includes transportation electrification, building electrification, industrial electrification, distributed energy resources, and energy efficiency necessary to meet the states goals.
SEC. 3.Section 740.21 is added to the Public Utilities Code, to read:740.21.(a)Electrical corporations shall ensure that their distribution systems are upgraded at the times and locations necessary to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, the Transportation Agencys Climate Action Plan for Transportation Infrastructure, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)On or before January 1, 2024, to the extent that there are any permitting or licensing requirements for transmission or distribution grid upgrades necessary to support the level of electric vehicle charging anticipated by the states transportation electrification goals and regulations, the commission shall do both of the following:
(1)Develop an expedited process to ensure that electrical corporations can meet the requirements of subdivision (a).
(2)Direct electrical corporations to develop an expedited process for grid interconnection.
SEC. 4.Section 9625 is added to the Public Utilities Code, to read:9625.The governing board of a local publicly owned electric utility shall do both of the following:
(a)Ensure that their distribution systems are upgraded at the times and locations necessary to support the level of electric vehicle charging anticipated by Executive Orders No. B-48-18 and N-79-20, the Energy Commissions integrated energy policy report adopted pursuant to Section 25302 of the Public Resources Code, the Energy Commissions assessment prepared pursuant to Section 25229 of the Public Resources Code, State Air Resources Board regulations, air quality management plans, the Transportation Agencys Climate Action Plan for Transportation Infrastructure, regional seaport plans, regional transportation plans, and sustainable communities strategies.
(b)Use all available data to project future electric vehicle charging requirements so as to ensure the distribution grid is capable of supporting the level of electric vehicle charging necessary to achieve the states transportation electrification goals and regulations.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 38561 of the Health and Safety Code is amended to read:38561.(a)The state board shall prepare and approve a scoping plan, as that term is understood by the state board, for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases consistent with limits established by this division. The state board shall consult with all state agencies with jurisdiction over sources of greenhouse gases, including the Public Utilities Commission and the State Energy Resources Conservation and Development Commission, on all elements of its plan that pertain to energy-related matters including, but not limited to, electrical generation, load based-standards or requirements, the provision of reliable and affordable electrical service, petroleum refining, and statewide fuel supplies to ensure the greenhouse gas emissions reduction activities to be adopted and implemented by the state board are complementary, nonduplicative, and can be implemented in an efficient and cost-effective manner.(b)The plan shall identify and make recommendations on direct emissions reduction measures, alternative compliance mechanisms, market-based compliance mechanisms, and potential monetary and nonmonetary incentives for sources and categories of sources that the state board finds are necessary or desirable to facilitate the achievement of the maximum feasible and cost-effective reductions of greenhouse gas emissions.(c)In making the determinations required by subdivision (b), the state board shall consider all relevant information pertaining to greenhouse gas emissions reduction programs in other states, localities, and nations, including the northeastern states of the United States, Canada, and the European Union.(d)The state board shall evaluate the total potential costs and total potential economic and noneconomic benefits of the plan for reducing greenhouse gases to Californias economy, environment, and public health, using the best available economic models, emission estimation techniques, and other scientific methods.(e)In developing its plan, the state board shall take into account the relative contribution of each source or source category to statewide greenhouse gas emissions, and the potential for adverse effects on small businesses, and shall recommend a de minimis threshold of greenhouse gas emissions below which emissions reduction requirements will not apply.(f)In developing its plan, the state board shall identify opportunities for emissions reduction measures from all verifiable and enforceable voluntary actions, including, but not limited to, carbon sequestration projects and best management practices.(g)The state board shall conduct a series of public workshops to give interested parties an opportunity to comment on the plan. The state board shall conduct a portion of these workshops in regions of the state that have the most significant exposure to air pollutants, including, but not limited to, communities with minority populations, communities with low-income populations, or both.(h)The state board shall update its plan for achieving the maximum technologically feasible and cost-effective reductions of greenhouse gas emissions at least once every five years.(a)On or before January 1, 2009, the The state board shall prepare and approve a scoping plan, as that term is understood by the state board, for achieving the maximum technologically feasible and cost-effective reductions in greenhouse gas emissions from sources or categories of sources of greenhouse gases by 2020 under consistent with limits established by this division. The state board shall consult with all state agencies with jurisdiction over sources of greenhouse gases, including the Public Utilities Commission and the State Energy Resources Conservation and Development Commission, on all elements of its plan that pertain to energy-related matters including, but not limited to, electrical generation, load based-standards or requirements, the provision of reliable and affordable electrical service, petroleum refining, and statewide fuel supplies to ensure the greenhouse gas emissions reduction activities to be adopted and implemented by the state board are complementary, nonduplicative, and can be implemented in an efficient and cost-effective manner.
(b)The plan shall identify and make recommendations on direct emissions reduction measures, alternative compliance mechanisms, market-based compliance mechanisms, and potential monetary and nonmonetary incentives for sources and categories of sources that the state board finds are necessary or desirable to facilitate the achievement of the maximum feasible and cost-effective reductions of greenhouse gas emissions by 2020. emissions.
(c)In making the determinations required by subdivision (b), the state board shall consider all relevant information pertaining to greenhouse gas emissions reduction programs in other states, localities, and nations, including the northeastern states of the United States, Canada, and the European Union.
(d)The state board shall evaluate the total potential costs and total potential economic and noneconomic benefits of the plan for reducing greenhouse gases to Californias economy, environment, and public health, using the best available economic models, emission estimation techniques, and other scientific methods.
(e)In developing its plan, the state board shall take into account the relative contribution of each source or source category to statewide greenhouse gas emissions, and the potential for adverse effects on small businesses, and shall recommend a de minimis threshold of greenhouse gas emissions below which emissions reduction requirements will not apply.
(f)In developing its plan, the state board shall identify opportunities for emissions reduction measures from all verifiable and enforceable voluntary actions, including, but not limited to, carbon sequestration projects and best management practices.
(g)The state board shall conduct a series of public workshops to give interested parties an opportunity to comment on the plan. The state board shall conduct a portion of these workshops in regions of the state that have the most significant exposure to air pollutants, including, but not limited to, communities with minority populations, communities with low-income populations, or both.
(h)The state board shall update its plan for achieving the maximum technologically feasible and cost-effective reductions of greenhouse gas emissions at least once every five years.
|
Date
|
Status
|
|---|---|
| Sep 16, 2022 | Chaptered by Secretary of State - Chapter 354, Statutes of 2022. |
| Sep 16, 2022 | Approved by the Governor. |
| Sep 9, 2022 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 30, 2022 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 29, 2022 | Read third time. Passed. Ordered to the Assembly. (Ayes 33. Noes 2. Page 5230.). |
| Aug 11, 2022 | From committee: Do pass. (Ayes 5. Noes 0.) (August 11). |
| Aug 8, 2022 | In committee: Referred to suspense file. |
| Aug 2, 2022 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on APPR. |
| Aug 1, 2022 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on APPR. |
| Jul 20, 2022 | In committee: Hearing postponed by committee. |
| Jun 30, 2022 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 29, 2022 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 0.) (June 29). |
| Jun 21, 2022 | From committee: Do pass and re-refer to Com. on E.Q. (Ayes 10. Noes 1.) (June 21). Re-referred to Com. on E.Q. |
| Jun 9, 2022 | Action rescinded whereby the bill was referred to Com. on TRANS. |
| Jun 8, 2022 | Referred to Coms. on E., U. & C., E.Q. and TRANS. |
| May 26, 2022 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 25, 2022 | Read third time. Passed. Ordered to the Senate. (Ayes 58. Noes 1. Page 4947.) |
| May 19, 2022 | From committee: Do pass. (Ayes 12. Noes 0.) (May 19). |
| May 11, 2022 | In committee: Set, first hearing. Referred to suspense file. |
| Apr 28, 2022 | Re-referred to Com. on APPR. |
| Apr 27, 2022 | Read second time and amended. |
| Apr 26, 2022 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (April 25). |
| Apr 21, 2022 | From committee: Do pass and re-refer to Com. on TRANS. (Ayes 13. Noes 0.) (April 20). Re-referred to Com. on TRANS. |
| Apr 18, 2022 | Re-referred to Com. on U. & E. |
| Apr 7, 2022 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 28, 2022 | Re-referred to Coms. on U. & E. and TRANS. pursuant to Assembly Rule 96. |
| Mar 22, 2022 | Re-referred to Com. on NAT. RES. |
| Mar 21, 2022 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 10, 2022 | Referred to Com. on NAT. RES. |
| Feb 19, 2022 | From printer. May be heard in committee March 21. |
| Feb 18, 2022 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 30, 2022 | AB 2700 McCarty Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 29, 2022 | Assembly 3rd Reading AB2700 McCarty et al. By Allen | Senate Floor |
Passed |
|
| May 25, 2022 | AB 2700 McCarty Assembly Third Reading | Assembly Floor |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author
Bill Co-Author(s):