SB 694: Fire prevention: electrical corporations: wildfire mitigation: workforce diversity.
- Session Year: 2021-2022
- House: Senate
- Latest Version Date: 2021-10-08
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law establishes the Wildfire Safety Division within the commission. Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the division for review and approval, as specified. Existing law prevents an electrical corporation from diverting revenues authorized to implement the plan to any activities or investments outside of the plan and requires an electrical corporation to notify the commission and the Office of Energy Infrastructure Safety by advice letter of the date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its plan, as specified.
This bill would require an electrical corporation to also notify the commission and the office by advice letter a detailed summary of specified workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, a description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps and members of community conservation corps, as defined.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing this bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 8386.3 of the Public Utilities Code proposed by AB 9 to be operative only if this bill and AB 9 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law establishes the Wildfire Safety Division within the commission. Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the division for review and approval, as specified. Existing law prevents an electrical corporation from diverting revenues authorized to implement the plan to any activities or investments outside of the plan and requires an electrical corporation to notify the commission and the Office of Energy Infrastructure Safety by advice letter of the date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its plan, as specified.
This bill would require an electrical corporation to also notify the commission and the office by advice letter a detailed summary of specified workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, a description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps and members of community conservation corps, as defined.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing this bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 8386.3 of the Public Utilities Code proposed by AB 9 to be operative only if this bill and AB 9 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law established establishes the Wildfire Safety Division within the commission. Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the commission division for review and approval, as specified. Existing law prevents an electrical corporation from diverting revenues authorized to implement the plan to any activities or investments outside of the plan and requires an electrical corporation to notify the commission and the Office of Energy Infrastructure Safety by advice letter of the date when it the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its plan, as specified.
This bill would require an electrical corporation to also notify the commission and the office by advice letter a detailed summary of specified workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including including, but not limited to, a description of and data on the extent to which the electrical corporation and its contractors employ former advertises job openings to members of California Conservation Corps crews, and members of community conservation corps, and formerly incarcerated conservation crew members. as defined.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing this bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 8386.3 of the Public Utilities Code proposed by AB 9 to be operative only if this bill and AB 9 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law established the Wildfire Safety Division within the commission. Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the commission for review and approval, as specified. Existing law requires an electrical corporations wildfire mitigation plan to include specified components. prevents an electrical corporation from diverting revenues authorized to implement the plan to any activities or investments outside of the plan and requires an electrical corporation to notify the commission by advice letter of the date when it projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its plan, as specified.
This bill would require an electrical corporations wildfire mitigation plan to include a description of how the electrical corporation will develop sufficient numbers of experienced personnel necessary to complete the work described in the plan, as provided.This bill would require an electrical corporation to also notify the commission by advice letter a detailed summary of specified workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including data on the extent to which the electrical corporation and its contractors employ former members of California Conservation Corps crews, members of community conservation corps, and formerly incarcerated conservation crew members.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because this bill would add additional requirements to an electrical corporations wildfire mitigation plan that would be approved and overseen by the commission and because a violation of an order or decision of the commission implementing its this bills requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the commission for review and approval, as specified. Existing law requires an electrical corporations wildfire mitigation plan to include specified components.
This bill would require an electrical corporations wildfire mitigation plan to include a description of how the electrical corporation will develop sufficient numbers of experienced personnel necessary to complete the work described in the plan, as provided.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because this bill would add additional requirements to an electrical corporations wildfire mitigation plan that would be approved and overseen by the commission and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
It is the intent of the Legislature to enact legislation that would expand opportunities for meaningful employment in electrical grid modernization, vegetation management, and wildland firefighting.
SEC. 2.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Department of Forestry and Fire Protection on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action by the office or for a violation of a commission enforcement action, decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing the electrical corporations compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Department of Forestry and Fire Protection, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the office. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for the divisions costs to implement this section with respect to that electrical corporation.
(d)(1)An electrical corporation shall not divert revenues authorized by the commission to implement the wildfire mitigation plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of both of the following:
(A)The date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(B)A detailed summary of the electrical corporations workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(i)A description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(ii)A description of and data on the extent to which the electrical corporation, in seeking to develop potential members of its workforce, has links to or otherwise works with community-based or other organizations that work with current members of California Conservation Corps crews and current members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(iii)A description of the extent to which the electrical corporation supports skill-development efforts that would assist current and former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, formerly incarcerated conservation crew members, and others with similar skillsets in acquiring skills needed to complete work on or near electrical facilities. Nothing in this clause alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(2)An electrical corporation shall provide to the office a copy of the advice letter pursuant to paragraph (1) at the same time the advice letter is submitted to the commission.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 2.5.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Office of the State Fire Marshal on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action by the office or for a violation of a commission enforcement action, decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing the electrical corporations compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Office of the State Fire Marshal, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the office. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for the divisions costs to implement this section with respect to that electrical corporation.
(d)(1)An electrical corporation shall not divert revenues authorized by the commission to implement the wildfire mitigation plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of both of the following:
(A)The date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(B)A detailed summary of the electrical corporations workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(i)A description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(ii)A description of and data on the extent to which the electrical corporation, in seeking to develop potential members of its workforce, has links to or otherwise works with community-based or other organizations that work with current members of California Conservation Corps crews and current members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(iii)A description of the extent to which the electrical corporation supports skill-development efforts that would assist current and former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, formerly incarcerated conservation crew members, and others with similar skillsets in acquiring skills needed to complete work on or near electrical facilities. Nothing in this clause alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(2)An electrical corporation shall provide to the office a copy of the advice letter pursuant to paragraph (1) at the same time the advice letter is submitted to the commission.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 3.Section 2.5 of this bill incorporates amendments to Section 8386.3 of the Public Utilities Code proposed by both this bill and Assembly Bill 9. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2022, (2) each bill amends Section 8386.3 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 9, in which case Section 2 of this bill shall not become operative.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
It is the intent of the Legislature to enact legislation that would expand opportunities for meaningful employment in electrical grid modernization, vegetation management, and wildland firefighting.
SEC. 2.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Department of Forestry and Fire Protection on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action by the office or for a violation of a commission enforcement action, decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing the electrical corporations compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Department of Forestry and Fire Protection, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the office. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for the divisions costs to implement this section with respect to that electrical corporation.
(d)(1)An electrical corporation shall not divert revenues authorized by the commission to implement the wildfire mitigation plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of both of the following:
(A)The date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(B)A detailed summary of the electrical corporations workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(i)A description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(ii)A description of and data on the extent to which the electrical corporation, in seeking to develop potential members of its workforce, has links to or otherwise works with community-based or other organizations that work with current members of California Conservation Corps crews and current members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(iii)A description of the extent to which the electrical corporation supports skill-development efforts that would assist current and former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, formerly incarcerated conservation crew members, and others with similar skillsets in acquiring skills needed to complete work on or near electrical facilities. Nothing in this clause alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(2)An electrical corporation shall provide to the office a copy of the advice letter pursuant to paragraph (1) at the same time the advice letter is submitted to the commission.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 2.5.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Office of the State Fire Marshal on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action by the office or for a violation of a commission enforcement action, decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing the electrical corporations compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Office of the State Fire Marshal, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the office. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for the divisions costs to implement this section with respect to that electrical corporation.
(d)(1)An electrical corporation shall not divert revenues authorized by the commission to implement the wildfire mitigation plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of both of the following:
(A)The date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(B)A detailed summary of the electrical corporations workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(i)A description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(ii)A description of and data on the extent to which the electrical corporation, in seeking to develop potential members of its workforce, has links to or otherwise works with community-based or other organizations that work with current members of California Conservation Corps crews and current members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(iii)A description of the extent to which the electrical corporation supports skill-development efforts that would assist current and former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, formerly incarcerated conservation crew members, and others with similar skillsets in acquiring skills needed to complete work on or near electrical facilities. Nothing in this clause alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(2)An electrical corporation shall provide to the office a copy of the advice letter pursuant to paragraph (1) at the same time the advice letter is submitted to the commission.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 3.Section 2.5 of this bill incorporates amendments to Section 8386.3 of the Public Utilities Code proposed by both this bill and Assembly Bill 9. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2022, (2) each bill amends Section 8386.3 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 9, in which case Section 2 of this bill shall not become operative.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
It is the intent of the Legislature to enact legislation that would expand opportunities for meaningful employment in electrical grid modernization, vegetation management, and wildland firefighting.
SEC. 2.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Department of Forestry and Fire Protection on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action for a violation of a commission decision, order, or rule.(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing its compliance with the plan during the prior calendar year.(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Department of Forestry and Fire Protection, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the Wildfire Safety Division of the commission. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).(6)Each electrical corporation shall reimburse the Wildfire Safety Division for its costs to implement this section with respect to that electrical corporation.(d)An electrical corporation shall not divert revenues authorized to implement the plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of both of the following:(1)The date when it projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.(2)A detailed summary of workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:(A)A description and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.(B)A description and data on the extent to which the electrical corporation has workforce development links to organizations that work with current and former members of California Conservation Corps crews and current and former members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.(C)Data on the extent to which the electrical corporation and its contractors employ former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members. Data shall only be collected on a voluntary basis after the start of employment and shall not be a basis for adverse action by an employer. Nothing in this subparagraph alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.SEC. 2.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Department of Forestry and Fire Protection on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action by the office or for a violation of a commission enforcement action, decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing its the electrical corporations compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Department of Forestry and Fire Protection, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the office. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for its the divisions costs to implement this section with respect to that electrical corporation.
(d)(1)An electrical corporation shall not divert revenues authorized by the commission to implement the wildfire mitigation plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of the date when it projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date, and provide the office with a copy of the advice letter at the same time it is submitted to the commission. both of the following:
(A)The date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(B)A detailed summary of the electrical corporations workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(i)A description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(ii)A description of and data on the extent to which the electrical corporation, in seeking to develop potential members of its workforce, has links to or otherwise works with community-based or other organizations that work with current members of California Conservation Corps crews and current members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(iii)A description of the extent to which the electrical corporation supports skill-development efforts that would assist current and former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, formerly incarcerated conservation crew members, and others with similar skillsets in acquiring skills needed to complete work on or near electrical facilities. Nothing in this clause alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(2)An electrical corporation shall provide to the office a copy of the advice letter pursuant to paragraph (1) at the same time the advice letter is submitted to the commission.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 2.5.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Department of Forestry and Fire Protection Office of the State Fire Marshal on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action by the office or for a violation of a commission enforcement action, decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing its the electrical corporations compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Department of Forestry and Fire Protection, Office of the State Fire Marshal, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the office. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for its the divisions costs to implement this section with respect to that electrical corporation.
(d)(1)An electrical corporation shall not divert revenues authorized by the commission to implement the wildfire mitigation plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of the date when it projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date, and provide the office with a copy of the advice letter at the same time it is submitted to the commission. both of the following:
(A)The date when the electrical corporation projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(B)A detailed summary of the electrical corporations workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(i)A description of and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(ii)A description of and data on the extent to which the electrical corporation, in seeking to develop potential members of its workforce, has links to or otherwise works with community-based or other organizations that work with current members of California Conservation Corps crews and current members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(iii)A description of the extent to which the electrical corporation supports skill-development efforts that would assist current and former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, formerly incarcerated conservation crew members, and others with similar skillsets in acquiring skills needed to complete work on or near electrical facilities. Nothing in this clause alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(2)An electrical corporation shall provide to the office a copy of the advice letter pursuant to paragraph (1) at the same time the advice letter is submitted to the commission.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 3.Section 2.5 of this bill incorporates amendments to Section 8386.3 of the Public Utilities Code proposed by both this bill and Assembly Bill 9. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2022, (2) each bill amends Section 8386.3 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 9, in which case Section 2 of this bill shall not become operative.
SEC. 3.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
It is the intent of the Legislature to enact legislation that would expand opportunities for meaningful employment in electrical grid modernization, vegetation management, and wildland firefighting.
SEC. 2.Section 8386 of the Public Utilities Code is amended to read:8386.(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.(c)The wildfire mitigation plan shall include all of the following:(1)An accounting of the responsibilities of persons responsible for executing the plan.(2)The objectives of the plan.(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.(6)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:(A)Critical first responders.(B)Health and communication infrastructure.(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:(i)The customer relies on life-support equipment that operates on electricity to sustain life.(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program created pursuant to Section 739.1.(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.(7)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for notifying a customer receiving a medical baseline allowance as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.(8)Plans for vegetation management.(9)Plans for inspections of the electrical corporations electrical infrastructure.(10)Protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure.(11)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.(12)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.(13)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.(14)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.(15)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.(16)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.(17)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.(18)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.(19)A statement of how the electrical corporation will restore service after a wildfire.(20)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.(21)A description of the processes and procedures the electrical corporation will use to do all of the following:(A)Monitor and audit the implementation of the plan.(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.(22)A description of how the electrical corporation will develop sufficient numbers of experienced personnel necessary to complete the work described in the plan, including the extent to which the electrical corporation is seeking to develop as part of its workforce current and former members of California Conservation Corps crews, current and former crew members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.(23)Any other information that the Wildfire Safety Division may require.(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website for no less than two months before the divisions decision regarding approval of the plan. The division shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.SEC. 2.Section 8386.3 of the Public Utilities Code is amended to read:8386.3.(a)The Wildfire Safety Division shall approve or deny each wildfire mitigation plan and update submitted by an electrical corporation within three months of its submission, unless the division makes a written determination, which shall include reasons supporting the determination, that the three-month deadline cannot be met. Each electrical corporations approved plan shall remain in effect until the division approves the electrical corporations subsequent plan. The division shall consult with the Department of Forestry and Fire Protection on the review of each wildfire mitigation plan and update. In rendering its decision, the division shall consider comments submitted pursuant to subdivision (d) of Section 8386. Before approval, the division may require modifications of the plan. After approval by the division, the commission shall ratify the action of the division.
(b)The Wildfire Safety Divisions approval of a plan is not a defense to any enforcement action for a violation of a commission decision, order, or rule.
(c)Following approval of a wildfire mitigation plan, the Wildfire Safety Division shall oversee compliance with the plan consistent with all of the following:
(1)Three months after the end of an electrical corporations initial compliance period, as established by the Wildfire Safety Division pursuant to subdivision (b) of Section 8386, and annually thereafter, each electrical corporation shall file with the division a report addressing its compliance with the plan during the prior calendar year.
(2)(A)Before March 1, 2021, and before each March 1 thereafter, the Wildfire Safety Division, in consultation with the Department of Forestry and Fire Protection, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B)(i)Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporations compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the Wildfire Safety Division of the commission. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluators report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii)The Wildfire Safety Division shall consider the independent evaluators findings, but the independent evaluators findings are not binding on the division, except as otherwise specified.
(iii)The independent evaluators findings shall be used by the Wildfire Safety Division to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv)The independent evaluators findings do not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3)The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4)The Wildfire Safety Division shall complete its compliance review within 18 months after the submission of the electrical corporations compliance report.
(5)(A)An electrical corporation shall notify the Wildfire Safety Division, within one month after it completes a substantial portion of the vegetation management requirements in its wildfire mitigation plan, of the completion. Upon receiving the notice from the electrical corporation, the division shall, consistent with its authority pursuant to paragraph (1) of subdivision (a) of Section 326, promptly audit the work performed by, or on behalf of, the electrical corporation. The audit shall specify any failure of the electrical corporation to fully comply with the vegetation management requirements in the wildfire mitigation plan. The division shall provide the audit to the electrical corporation. The electrical corporation shall have a reasonable time, as determined by the division, to correct and eliminate any deficiency specified in the audit.
(B)The Wildfire Safety Division may engage its own independent evaluator, who shall be a certified arborist and shall have any other qualifications determined appropriate by the division, to conduct the audit specified in subparagraph (A). The independent evaluator shall consult with, and operate under the direction of, the division.
(C)Within one year of the expiration of the time period for an electrical corporation to correct and eliminate any deficiency identified in the audit, the independent evaluator shall issue a report to the electrical corporation, the Wildfire Safety Division, and the Safety and Enforcement Division of the commission specifically describing any failure of the electrical corporation to substantially comply with the substantial portion of the vegetation management requirements in the electrical corporations wildfire mitigation plan. The report shall be made publicly available. The Wildfire Safety Division shall include the report in its compliance review prepared pursuant to paragraph (4).
(6)Each electrical corporation shall reimburse the Wildfire Safety Division for its costs to implement this section with respect to that electrical corporation.
(d)An electrical corporation shall not divert revenues authorized to implement the plan to any activities or investments outside of the plan. An electrical corporation shall notify the commission by advice letter of both of the date following:
(1)The date when it projects that it will have spent, or incurred obligations to spend, its entire annual revenue requirement for vegetation management in its wildfire mitigation plan not less than 30 days before that date.
(2)A detailed summary of workforce development efforts completed in compliance with the Office of Federal Contract Compliance Programs, including, but not limited to, all of the following:
(A)A description and data on the extent to which the electrical corporation advertises job openings to members of California Conservation Corps crews and members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code.
(B)A description and data on the extent to which the electrical corporation has workforce development links to organizations that work with current and former members of California Conservation Corps crews and current and former members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(C)Data on the extent to which the electrical corporation and its contractors employ former members of California Conservation Corps crews, members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members. Data shall only be collected on a voluntary basis after the start of employment and shall not be a basis for adverse action by an employer. Nothing in this subparagraph alters the requirements imposed on an employer pursuant to Section 12952 of the Government Code.
(e)The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the first five billion dollars ($5,000,000,000) expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations approved wildfire mitigation plans. An electrical corporations share of the fire risk mitigation capital expenditures and the debt financing costs of these fire risk mitigation capital expenditures may be financed through a financing order pursuant to Section 850.1 subject to the requirements of that financing order.
(f)This section does not impose any liability on the Wildfire Safety Division regarding the performance of its duties.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
It is the intent of the Legislature to enact legislation that would expand opportunities for meaningful employment in electrical grid modernization, vegetation management, and wildland firefighting.
SEC. 2.Section 8386 of the Public Utilities Code is amended to read:8386.(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
(c)The wildfire mitigation plan shall include all of the following:
(1)An accounting of the responsibilities of persons responsible for executing the plan.
(2)The objectives of the plan.
(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.
(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
(A)Critical first responders.
(B)Health and communication infrastructure.
(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
(i)The customer relies on life-support equipment that operates on electricity to sustain life.
(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program created pursuant to Section 739.1.
(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
(7)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers notifying a customer receiving a medical baseline allowances allowance as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.
(8)Plans for vegetation management.
(9)Plans for inspections of the electrical corporations electrical infrastructure.
(10)Protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure.
(11)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
(12)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
(13)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
(14)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
(15)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
(16)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(17)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(18)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(19)A statement of how the electrical corporation will restore service after a wildfire.
(20)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
(21)A description of the processes and procedures the electrical corporation will use to do all of the following:
(A)Monitor and audit the implementation of the plan.
(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(22)A description of how the electrical corporation will develop sufficient numbers of experienced personnel necessary to complete the work described in the plan, including the extent to which the electrical corporation is seeking to develop as part of its workforce current and former members of California Conservation Corps crews, current and former crew members of community conservation corps, as defined in Section 14507.5 of the Public Resources Code, and formerly incarcerated conservation crew members.
(22)(23)Any other information that the Wildfire Safety Division may require.
(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website for no less than two months before the divisions decision regarding approval of the plan. The division shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Oct 8, 2021 | Chaptered by Secretary of State. Chapter 733, Statutes of 2021. |
| Oct 8, 2021 | Approved by the Governor. |
| Sep 17, 2021 | Enrolled and presented to the Governor at 1:30 p.m. |
| Sep 10, 2021 | Assembly amendments concurred in. (Ayes 37. Noes 0. Page 2607.) Ordered to engrossing and enrolling. |
| Sep 7, 2021 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 7, 2021 | Read third time. Passed. (Ayes 70. Noes 0. Page 2813.) Ordered to the Senate. |
| Sep 3, 2021 | Read third time and amended. |
| Jul 15, 2021 | Read second time. Ordered to third reading. |
| Jul 14, 2021 | From committee: Do pass. (Ayes 13. Noes 0.) (July 14). |
| Jun 30, 2021 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (June 30). Re-referred to Com. on APPR. |
| Jun 22, 2021 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 14, 2021 | June 16 set for first hearing canceled at the request of author. |
| May 20, 2021 | Referred to Com. on U. & E. |
| May 10, 2021 | In Assembly. Read first time. Held at Desk. |
| May 10, 2021 | Read third time. Passed. (Ayes 37. Noes 0. Page 1061.) Ordered to the Assembly. |
| May 5, 2021 | Read second time. Ordered to consent calendar. |
| May 4, 2021 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Apr 21, 2021 | Set for hearing May 3. |
| Apr 20, 2021 | From committee: Do pass and re-refer to Com. on APPR with recommendation: To consent calendar. (Ayes 14. Noes 0. Page 842.) (April 19). Re-referred to Com. on APPR. |
| Mar 26, 2021 | Set for hearing April 19. |
| Mar 3, 2021 | Referred to Com. on E., U. & C. |
| Feb 22, 2021 | Art. IV. Sec. 8(a) of the Constitution dispensed with. |
| Feb 22, 2021 | From printer. May be acted upon on or after March 24. |
| Feb 19, 2021 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 10, 2021 | Unfinished Business SB694 Bradford Concurrence | Senate Floor |
Passed |
|
| Sep 7, 2021 | SB 694 Bradford Senate Third Reading By Holden | Assembly Floor |
Passed |
|
| May 10, 2021 | Consent Calendar SB694 | Senate Floor |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author