What does this bill do?
The bill lets a city use job order contracting—a way to competitively hire contractors for repair, remodeling, or repetitive work priced by unit rates—while capping awards at $3,000,000 per contract and $750,000 per single job and limiting the initial term to 12 months (renewable up to $6,000,000 over two more years). It requires bidders to identify subcontractors, pay prevailing wages, commit to a skilled, apprentice‑trained workforce, bars using these contracts to lay off or replace permanent city employees or work already assigned to city staff, and requires cities to report on their use.
The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.
Existing law, the Local Agency Public Construction Act, sets forth procedures that a local agency is required to follow when procuring certain services or work. Existing law authorizes certain local agencies to engage in job order contracting, as prescribed.
This bill would establish a pilot program to authorize a city to use job order contracting as a procurement method. The bill would impose a $3,000,000 cap on awards under a single job order contract and a $750,000 cap on any single job order. The bill would limit the term of an initial contract to a maximum of 12 months, with extensions as prescribed. The bill would establish various additional procedures and requirements for the use of job order contracting under this authorization. The bill would require the authority, city, on or before January 1, 2030, to submit to the appropriate policy and fiscal committees of the Legislature a report on the use of job order contracting under the bill. The bill would repeal these provisions on January 1, 2032.
Existing law, the Local Agency Public Construction Act, sets forth procedures that a local agency is required to follow when procuring certain services or work. Existing law authorizes certain local agencies to engage in job order contracting, as prescribed.
This bill would establish a pilot program to authorize a city to use job order contracting as a procurement method. The bill would impose a $3,000,000 cap on awards under a single job order contract and a $750,000 cap on any single job order. The bill would limit the term of an initial contract to a maximum of 12 months, with extensions as prescribed. The bill would establish various additional procedures and requirements for the use of job order contracting under this authorization. The bill would require the authority, on or before January 1, 2030, to submit to the appropriate policy and fiscal committees of the Legislature a report on the use of job order contracting under the bill. The bill would repeal these provisions on January 1, 2032.
This bill would authorize the city council to award individual annual job order contracts, not to exceed $500,000, as specified, for repair, remodeling, or other repetitive work to be done according to unit prices. The bill would prohibit, among other things, annual contracts from being awarded for any new construction. The bill would require the contracts to be awarded to the lowest responsible bidder and be based on plans and specifications for typical work. The bill would authorize the city council, by ordinance, to authorize the city manager, public works director, or other city official, as specified, to take or perform any or all acts or actions permitted or required of the city council by the above-described provisions, as prescribed. The bill would require an entity that is awarded an annual job order contract to provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticeable occupation in the building and construction trades, as specified. The bill would require the city to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2031, a report on the use of job order contracting, as described. The bill would authorize a city that has elected to be subject to alternative public project procedures, as specified, to award job order contracts, as described.Existing law, the Local Agency Public Construction Act, sets forth procedures that a local agency is required to follow when procuring certain services or work. Existing law authorizes certain local agencies to engage in job order contracting, as prescribed.
This bill would authorize the city council to award individual annual job order contracts, not to exceed $500,000, as specified, for repair, remodeling, or other repetitive work to be done according to unit prices. The bill would prohibit, among other things, annual contracts from being awarded for any new construction. The bill would require the contracts to be awarded to the lowest responsible bidder and be based on plans and specifications for typical work. The bill would authorize the city council, by ordinance, to authorize the city manager, public works director, or other city official, as specified, to take or perform any or all acts or actions permitted or required of the city council by the above-described provisions, as prescribed. The bill would require an entity that is awarded an annual job order contract to provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticeable occupation in the building and construction trades, as specified. The bill would require the city to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2031, a report on the use of job order contracting, as described. The bill would authorize a city that has elected to be subject to alternative public project procedures, as specified, to award job order contracts, as described.
Existing law, the Local Agency Public Construction Act, sets forth procedures that a local agency is required to follow when procuring certain services or work. Existing law authorizes certain local agencies to engage in job order contracting, as prescribed.
This bill would authorize the city council to award individual annual job order contracts, not to exceed $500,000, as specified, for repair, remodeling, or other repetitive work to be done according to unit prices. The bill would prohibit, among other things, annual contracts from being awarded for any new construction. The bill would require the contracts to be awarded to the lowest responsible bidder and be based on plans and specifications for typical work.
(a)A city may award job order contracts using the procurement method outlined in this article.
(b)Job order contracts shall be competitively bid and awarded to bidders providing qualified responsive bids.
(c)Job order contracts shall be for repair, remodeling, or other repetitive work to be done according to unit prices.
(d)Annual contracts shall not be awarded for any new construction.
20176.1.(a)Solicitations for job order contracts shall progress as follows:
(1)(A)The city shall prepare a set of solicitation documents for job order contracts.
(B)The documents shall include a unit price catalog or other established unit prices, job order contract terms, job order contract technical specifications, and any other information the city deems necessary to adequately describe the citys needs.
(2)An architect, engineer, consultant, or contractor retained by the city to assist in the development of the job order contract solicitation documents shall not be eligible to bid or to participate in the preparation of a job order contract bid.
(3)The city may award multiple job order contracts in response to a single job order contract solicitation.
(4)The city shall develop a system for evaluating job order contract bids for awarding job order contracts.
(b)The award of a job order contract shall progress as follows:
(1)The city shall prepare a request for bids for job order contracts based on the solicitation documents prepared pursuant to paragraph (1) of subdivision (a) that invites job order contractors to submit sealed bids in the manner prescribed by the city.
(2)Each bidding job order contractor shall include in its bid one or more adjustment factors to the established unit prices provided in the request for bids based on the contracts technical specifications.
(3)Each bidding job order contractor shall agree to identify any subcontractors to be used for the job orders performed pursuant to the job order contract.
(4)The award of job order contracts, if any, shall be made to a job order contractor or to job order contractors that the city determines to be qualified and responsive based upon preestablished criteria to be determined by the city.
20176.2.(a)(1)The maximum total dollar amount that may be awarded under a single job order contract shall not exceed three million dollars ($3,000,000) in the initial contract term of the job order contract.
(2)A single job order shall not exceed seven hundred and fifty thousand dollars ($750,000).
(b)Job order contracts may be executed for an initial contract term of no more than 12 months and may be extended or renewed for two subsequent annual terms and a maximum of six million dollars ($6,000,000) over the subsequent two terms of the contract.
(c)Work shall not be split or separated into smaller job orders for the purpose of evading the cost limits of this article.
(d)Dollar amounts specified in this section may be adjusted annually to reflect the percentage change in the California Consumer Price Index.
20176.3.(a)Work shall not be performed under a job order contract except by order of the city council.
(b)(1)Notwithstanding subdivision (a), the city council may, by ordinance, authorize the city manager, public works director, or other city official, as is deemed appropriate, to take or perform any or all acts permitted or required of the city council by this article, including the authority to adopt and advertise plans and specifications, award job order contracts, or order the change or alteration of job order contracts, with respect to either of the following:
(A)Individual job orders that do not exceed one hundred fifty thousand dollars ($150,000).
(B)Changes or alterations to job orders previously authorized by the city council where the changes or alterations do not exceed 10 percent of the amount of the original job order or one hundred fifty thousand dollars ($150,000), whichever is less.
(2)The aggregate total amount of those changes or alterations to an original job order shall not exceed 25 percent of the amount of the original job order.
(3)Any authorization pursuant to this subdivision shall include detailed procedures governing the city official in the exercise of this authority.
(4)If a person with authority delegated pursuant to this subdivision undertakes any action authorized by this subdivision, that person shall report actions taken pursuant to this subdivision to the city council, during a regular meeting, at least once every 90 days, or more frequently at the discretion of the city council.
20176.4.(a)An entity awarded an annual job order contract pursuant to this article shall provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.
(b)Subdivision (a) shall not apply if the job order contract is subject to a project labor agreement that will bind all contractors and subcontractors performing work on the job order contract to use a skilled and trained workforce to perform the job order contract.
20176.5.(a)All work bid under job order contracts shall comply with Chapter 4 (commencing with Section 4100) of Part 1 and is subject to all of the penalties and provisions set forth in that chapter.
(b)For purposes of this article, if a job order contractor chooses to use a subcontractor, the job order contractor shall verify that the subcontractor possesses and maintains the appropriate licenses and credentials required.
(c)If the city, after conducting an administrative due process review, determines that there has been a violation of Chapter 4 (commencing with Section 4100) of Part 1, including, but not limited to, bid shopping by the job order contractor, the city may do any of the following:
(1)Terminate the job order contract.
(2)Declare the contractor ineligible for future job order contracts for a period of time to be determined by the city.
(3)Withdraw authorization for the contractor to proceed with awarded work.
20176.6.(a)A job order contract shall set forth in the general conditions of the job order contract the party or parties responsible for seeing that Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code is complied with.
(b)For purposes of job order contracting, prevailing wages shall apply to all work ordered under the job order contract regardless of thresholds set forth in Section 1771.5 of the Labor Code.
(c)The job order contractor shall pay the prevailing wage in effect at the time the job order contract is issued by the city and all increases as published by the Department of Industrial Relations for the term of the job order contract, including all overtime, holiday, and shift provisions published by the Department of Industrial Relations.
(d)The city shall designate one individual to act as a monitor to inspect job sites for labor compliance violations at the request of the designated labor representative in its project labor agreement, if applicable.
20176.7.(a)In order to prevent fraud, waste, and abuse, the city shall compare the contractors estimate for each job order with the unit price or prices for that work before issuance of any job order.
(b)If the city finds that the job order contractors estimate to perform work for a given job order is inconsistent with the unit price or prices for that work, the city may elect not to issue the job order to the job order contractor, and may, instead, use any other available procurement procedures or choose not to move forward with the work.
20176.8.This article shall not be construed to remove a citys requirement to follow the applicable provisions of this code as it relates to the advertising of public works projects and the award of public works contracts.
20176.9.An annual job order contract awarded pursuant to this article shall not be used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee. for any of the following purposes:
(a)To lay off, reduce the hours of, or involuntarily transfer any permanent employee, as defined in the citys applicable memorandum of understanding or civil service rules.
(b)To perform work that, at the time the job order is issued, is the subject of an active, written work order assigned to city employees in the citys work management system.
(c)As a substitute for a position classification that is both currently funded in the citys adopted budget and occupied by a permanent employee, as defined in the citys applicable memorandum of understanding or civil service rules, at the time the job order contract is awarded.
20176.10.Notwithstanding subdivision (a) of Section 22030, a city that has elected to be subject to the alternative public project procedures in Article 3 (commencing with Section 22030) of Chapter 2 may award job order contracts as provided in this article.
20176.11.(a)A city shall submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2030, a report on the use of job order contracting under this article. The report shall include, but shall not be limited to, all of the following information:
(1)A description of the citys system for evaluating job order contract bids for award of job order contracts, including, but not limited to, the criteria used by the city to determine a qualified and responsive job order contractor.
(2)A description of each job order contract awarded and the contractor awarded the contract.
(3)An assessment of the use of job order contracting under this article.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
20176.12.This article shall remain in effect only until January 1, 2032, and as of that date is repealed.
(a)A city may award job order contracts using the procurement method outlined in this article.
(b)Job order contracts shall be competitively bid and awarded to bidders providing qualified responsive bids.
(c)Job order contracts shall be for repair, remodeling, or other repetitive work to be done according to unit prices.
(d)Annual contracts shall not be awarded for any new construction.
20176.1.(a)Solicitations for job order contracts shall progress as follows:
(1)(A)The city shall prepare a set of solicitation documents for job order contracts.
(B)The documents shall include a unit price catalog or other established unit prices, job order contract terms, job order contract technical specifications, and any other information the city deems necessary to adequately describe the citys needs.
(2)An architect, engineer, consultant, or contractor retained by the city to assist in the development of the job order contract solicitation documents shall not be eligible to bid or to participate in the preparation of a job order contract bid.
(3)The city may award multiple job order contracts in response to a single job order contract solicitation.
(4)The city shall develop a system for evaluating job order contract bids for awarding job order contracts.
(b)The award of a job order contract shall progress as follows:
(1)The city shall prepare a request for bids for job order contracts based on the solicitation documents prepared pursuant to paragraph (1) of subdivision (a) that invites job order contractors to submit sealed bids in the manner prescribed by the city.
(2)Each bidding job order contractor shall include in its bid one or more adjustment factors to the established unit prices provided in the request for bids based on the contracts technical specifications.
(3)Each bidding job order contractor shall agree to identify any subcontractors to be used for the job orders performed pursuant to the job order contract.
(4)The award of job order contracts, if any, shall be made to a job order contractor or to job order contractors that the city determines to be qualified and responsive based upon preestablished criteria to be determined by the city.
20176.2.(a)(1)The maximum total dollar amount that may be awarded under a single job order contract shall not exceed three million dollars ($3,000,000) in the initial contract term of the job order contract.
(2)A single job order shall not exceed seven hundred and fifty thousand dollars ($750,000).
(b)Job order contracts may be executed for an initial contract term of no more than 12 months and may be extended or renewed for two subsequent annual terms and a maximum of six million dollars ($6,000,000) over the subsequent two terms of the contract.
(c)Work shall not be split or separated into smaller job orders for the purpose of evading the cost limits of this article.
(d)Dollar amounts specified in this section may be adjusted annually to reflect the percentage change in the California Consumer Price Index.
20176.3.(a)Work shall not be performed under a job order contract except by order of the city council.
(b)(1)Notwithstanding subdivision (a), the city council may, by ordinance, authorize the city manager, public works director, or other city official, as is deemed appropriate, to take or perform any or all acts permitted or required of the city council by this article, including the authority to adopt and advertise plans and specifications, award job order contracts, or order the change or alteration of job order contracts, with respect to either of the following:
(A)Individual job orders that do not exceed one hundred fifty thousand dollars ($150,000).
(B)Changes or alterations to job orders previously authorized by the city council where the changes or alterations do not exceed 10 percent of the amount of the original job order or one hundred fifty thousand dollars ($150,000), whichever is less.
(2)The aggregate total amount of those changes or alterations to an original job order shall not exceed 25 percent of the amount of the original job order.
(3)Any authorization pursuant to this subdivision shall include detailed procedures governing the city official in the exercise of this authority.
(4)If a person with authority delegated pursuant to this subdivision undertakes any action authorized by this subdivision, that person shall report actions taken pursuant to this subdivision to the city council, during a regular meeting, at least once every 90 days, or more frequently at the discretion of the city council.
20176.4.(a)An entity awarded an annual job order contract pursuant to this article shall provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.
(b)Subdivision (a) shall not apply if the job order contract is subject to a project labor agreement that will bind all contractors and subcontractors performing work on the job order contract to use a skilled and trained workforce to perform the job order contract.
20176.5.(a)All work bid under job order contracts shall comply with Chapter 4 (commencing with Section 4100) of Part 1 and is subject to all of the penalties and provisions set forth in that chapter.
(b)For purposes of this article, if a job order contractor chooses to use a subcontractor, the job order contractor shall verify that the subcontractor possesses and maintains the appropriate licenses and credentials required.
(c)If the city, after conducting an administrative due process review, determines that there has been a violation of Chapter 4 (commencing with Section 4100) of Part 1, including, but not limited to, bid shopping by the job order contractor, the city may do any of the following:
(1)Terminate the job order contract.
(2)Declare the contractor ineligible for future job order contracts for a period of time to be determined by the city.
(3)Withdraw authorization for the contractor to proceed with awarded work.
20176.6.(a)A job order contract shall set forth in the general conditions of the job order contract the party or parties responsible for seeing that Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code is complied with.
(b)For purposes of job order contracting, prevailing wages shall apply to all work ordered under the job order contract regardless of thresholds set forth in Section 1771.5 of the Labor Code.
(c)The job order contractor shall pay the prevailing wage in effect at the time the job order contract is issued by the city and all increases as published by the Department of Industrial Relations for the term of the job order contract, including all overtime, holiday, and shift provisions published by the Department of Industrial Relations.
(d)The city shall designate one individual to act as a monitor to inspect job sites for labor compliance violations at the request of the designated labor representative in its project labor agreement, if applicable.
20176.7.(a)In order to prevent fraud, waste, and abuse, the city shall compare the contractors estimate for each job order with the unit price or prices for that work before issuance of any job order.
(b)If the city finds that the job order contractors estimate to perform work for a given job order is inconsistent with the unit price or prices for that work, the city may elect not to issue the job order to the job order contractor, and may, instead, use any other available procurement procedures or choose not to move forward with the work.
20176.8.This article shall not be construed to remove a citys requirement to follow the applicable provisions of this code as it relates to the advertising of public works projects and the award of public works contracts.
20176.9.An annual job order contract awarded pursuant to this article shall not be used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee.
20176.10.Notwithstanding subdivision (a) of Section 22030, a city that has elected to be subject to the alternative public project procedures in Article 3 (commencing with Section 22030) of Chapter 2 may award job order contracts as provided in this article.
20176.11.(a)A city shall submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2030, a report on the use of job order contracting under this article. The report shall include, but shall not be limited to, all of the following information:
(1)A description of the citys system for evaluating job order contract bids for award of job order contracts, including, but not limited to, the criteria used by the city to determine a qualified and responsive job order contractor.
(2)A description of each job order contract awarded and the contractor awarded the contract.
(3)An assessment of the use of job order contracting under this article.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
20176.12.This article shall remain in effect only until January 1, 2032, and as of that date is repealed.
20176.(a)(1)Notwithstanding any other law, the city council may award individual annual job order contracts, none of which shall exceed five hundred thousand dollars ($500,000), as adjusted annually to reflect the percentage change in the California Consumer Price Index, for repair, remodeling, or other repetitive work to be done according to unit prices. (2)Annual contracts shall not be awarded for any new construction.(3)The contracts shall be awarded to the lowest responsible bidder and shall be based on plans and specifications for typical work.(4)No project shall be performed under the contract except by order of the city council or an officer acting pursuant to subdivision (b).(b)(1)The city council may by ordinance authorize the city manager, public works director, or other city official, as is deemed appropriate, to take or perform any or all acts or actions permitted or required of the city council by this section, including the authority to adopt and advertise plans and specifications, award job order contracts, or order the change or alteration of job order contracts, with respect to either of the following:(A)Individual job orders which do not exceed one hundred fifty thousand dollars ($150,000).(B)Changes or alterations to job orders previously authorized by the city council where the changes or alterations do not exceed 10 percent of the amount of the original job order or one hundred fifty thousand dollars ($150,000), whichever is less.(2)The aggregate total amount of those changes or alterations to an original job order may not exceed 25 percent of the amount of the original job order.(3)Any authorization pursuant to this subdivision shall include detailed procedures governing the city official in the exercise of that authority.(c)This section shall not be construed to remove the citys requirement to follow the applicable provisions of this code as it relates to the advertising of public works projects and the award of public works contracts.(d)An annual job order contract shall not be used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee.(e)(1)An entity awarded an annual job order contract pursuant to this section shall provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.(2)Paragraph (1) shall not apply if the job order contract is subject to a project labor agreement that will bind all contractors and subcontractors performing work on the job order contract to use a skilled and trained workforce to perform the job order contract.20176.1.(a)(1)The city shall submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2031, a report on the use of job order contracting under this article.(2)The report shall include, but not be limited to, all of the following information:(A)A description of the citys system for evaluating job order contract bids for award of job order contracts, including, but not limited to, the criteria used by the city to determine a qualified and responsive job order contractor.(B)A description of each job order contract awarded and the contractor awarded the contract.(C)An assessment of the use of job order contracting under this article.(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.20176.2.Notwithstanding subdivision (a) of Section 22030, a city that has elected to be subject to the alternative public project procedures in Article 3 (commencing with Section 22030) of Chapter 2 may award job order contracts as provided in this article.(a)(1)Notwithstanding any other law, the city council may award individual annual job order contracts, none of which shall exceed five hundred thousand dollars ($500,000), as adjusted annually to reflect the percentage change in the California Consumer Price Index, for repair, remodeling, or other repetitive work to be done according to unit prices.
(b)(2)Annual contracts shall not be awarded for any new construction.
(c)(3)The contracts shall be awarded to the lowest responsible bidder and shall be based on plans and specifications for typical work.
(d)(4)No project shall be performed under the contract except by order of the city council or an officer acting pursuant to authority. subdivision (b).
(b)(1)The city council may by ordinance authorize the city manager, public works director, or other city official, as is deemed appropriate, to take or perform any or all acts or actions permitted or required of the city council by this section, including the authority to adopt and advertise plans and specifications, award job order contracts, or order the change or alteration of job order contracts, with respect to either of the following:
(A)Individual job orders which do not exceed one hundred fifty thousand dollars ($150,000).
(B)Changes or alterations to job orders previously authorized by the city council where the changes or alterations do not exceed 10 percent of the amount of the original job order or one hundred fifty thousand dollars ($150,000), whichever is less.
(2)The aggregate total amount of those changes or alterations to an original job order may not exceed 25 percent of the amount of the original job order.
(3)Any authorization pursuant to this subdivision shall include detailed procedures governing the city official in the exercise of that authority.
(c)This section shall not be construed to remove the citys requirement to follow the applicable provisions of this code as it relates to the advertising of public works projects and the award of public works contracts.
(d)An annual job order contract shall not be used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee.
(e)(1)An entity awarded an annual job order contract pursuant to this section shall provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.
(2)Paragraph (1) shall not apply if the job order contract is subject to a project labor agreement that will bind all contractors and subcontractors performing work on the job order contract to use a skilled and trained workforce to perform the job order contract.
20176.1.(a)(1)The city shall submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2031, a report on the use of job order contracting under this article.
(2)The report shall include, but not be limited to, all of the following information:
(A)A description of the citys system for evaluating job order contract bids for award of job order contracts, including, but not limited to, the criteria used by the city to determine a qualified and responsive job order contractor.
(B)A description of each job order contract awarded and the contractor awarded the contract.
(C)An assessment of the use of job order contracting under this article.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
20176.2.Notwithstanding subdivision (a) of Section 22030, a city that has elected to be subject to the alternative public project procedures in Article 3 (commencing with Section 22030) of Chapter 2 may award job order contracts as provided in this article.
(a)Notwithstanding any other law, the city council may award individual annual job order contracts, none of which shall exceed five hundred thousand dollars ($500,000), as adjusted annually to reflect the percentage change in the California Consumer Price Index, for repair, remodeling, or other repetitive work to be done according to unit prices.
(b)Annual contracts shall not be awarded for any new construction.
(c)The contracts shall be awarded to the lowest responsible bidder and shall be based on plans and specifications for typical work.
(d)No project shall be performed under the contract except by order of the city council or an officer acting pursuant to authority.
|
Date
|
Status
|
|---|---|
| Jul 1, 2026 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jun 10, 2026 | Referred to Com. on L. GOV. |
| May 28, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 27, 2026 | Read third time. Passed. Ordered to the Senate. |
| May 27, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 69. Noes 1. Page 5440.) |
| May 27, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 69. Noes 1.) |
| May 22, 2026 | Read third time and amended. Ordered to third reading. |
| May 22, 2026 | Read third time and amended. Ordered to third reading. (Page 5272.) |
| May 5, 2026 | Read second time. Ordered to third reading. |
| May 4, 2026 | Read second time and amended. Ordered returned to second reading. |
| Apr 30, 2026 | From committee: Amend, and do pass as amended. (Ayes 8. Noes 0.) (April 29). |
| Apr 21, 2026 | Re-referred to Com. on L. GOV. |
| Apr 20, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended. |
| Mar 2, 2026 | Referred to Com. on L. GOV. |
| Feb 18, 2026 | From printer. May be heard in committee March 20. |
| Feb 17, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 27, 2026 | AB 2033 Papan Assembly Third Reading | Assembly Floor |
Passed |
|
| Apr 29, 2026 | Do pass as amended. | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| American Federation Of State, County And Municipal Employees, Afl-Cio | ** Against | |
| Associated General Contractors, California Chapters | ** Against | |
| California Chapters of the American Public Works Association | ** Support | |
| California State Council Of Laborers | ** Against | |
| City of Belmont | ** Support | |
| City of Corona | ** Support | |
| City of Foster City | ** Support | |
| City of Rancho Cucamonga | ** Support | |
| Construction Industry Force Account Council | ** Against | |
| District Council Of Iron Workers Of The State Of California And Vicinity | ** Against | |
| International Union of Operating Engineers | ** Against | |
| League Of California Cities | ** Support | |
| Marin County Council of Mayors and Councilmembers | ** Support | |
| State Building and Construction Trades Council | ** Against | |
| The Gordian Group | ** Support | |
| The Gordian Group (if amended) | ** Support | |
| Western Electrical Contractors Association | ** Against |
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2025 - 2026 Regular
Bill No: | AB 2033 | Hearing Date: | 7/1/26 |
Author: | Papan | Fiscal: | No |
Version: | 5/22/26 | Consultant: | Vargas |
Local Agency Public Construction Act: job order contracting: cities
Authorizes general law cities to use the Job Order Contracting procurement method.
Background
Contracting. The Local Agency Public Construction Act generally requires local agencies to invite bids for construction projects and award contracts to the lowest responsible bidder. Local agencies typically use the traditional design-bid-build method for constructing public works. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local agencies invite bids from the construction community and award the contract to the lowest responsible bidder. Over the last couple of decades, legislators have gradually expanded local agencies’ authority to procure construction projects using various alternatives to the design-bid-build project delivery method.
Job order contracts (JOC). A JOC is a competitively bid, fixed price, indefinite quantity contract for the performance of minor construction, as well as the renovation, alteration, painting and repair of existing public facilities. A JOC is generally a multi-year contract that includes a base year and multiple “option years,” and is awarded before the awarding agency has identified specific work that it needs the contractor to perform. Instead of bidding each project separately, the agency awards a JOC that identifies specific tasks and covers a range of recurring work, such as roofing, electrical work, plumbing, and painting, across facilities it owns.
A JOC is a fixed price agreement in that it is based upon specified charges contained in a Unit Price Book (UPB), which is prepared by the public agency or by independent commercial sources. The UPB sets forth detailed repair and construction tasks, including task descriptions, specifications, units of measurement, and unit prices for each task (“Unit Price” means the amount paid for a single unit of an item of work). This contracting method is intended to reduce costs and accelerate completion of smaller projects.
The Legislature has authorized multiple agencies to use JOC, some state and some local, including counties, school districts, community college districts, the California State University system, and Caltrans. California counties have had the authority to use JOC since 1983.
City of Belmont. California cities fall into one of two types: general law or charter cities. Unlike charter cities, general law cities must follow all general, statewide laws, including procurement authorities. The City of Belmont located in the County of San Mateo, is a general law city along with 362 other general law cities. Belmont reports it undergoes months of design, advertisement, and formal bidding. Sometimes this leads to a no bid cycle for small projects that do not attract large contractors, resulting in significant delays and inflation-driven cost increases.
The City of Belmont wants the Legislature to allow general law cities to use JOC to ensure faster procurement practices for repair and repetitive work.
Proposed Law
Assembly Bill 2033 allows, until January 1, 2032, cities to use JOC procurement authority. To use this authority, a city must follow that:
- Job order contracts must be competitively bid and awarded to bidders providing qualified responsive bids;
- Job order contracts must be for repair, remodeling, or other repetitive work to be done according to unit prices; and
- Annual contracts shall not be awarded for any new construction.
Solicitations for a JOC must comply with the following requirements:
- The city must prepare a set of solicitation documents for job order contracts. Documents must include a unit price catalog or other established unit prices; and
- An architect, engineer, consultant, or contractor retained by the city to assist in the development of the JOC solicitation documents must not be eligible to bid or participate in the preparation of the JOC bid.
The city may award multiple JOCs in response to a single JOC solicitation. The city must also develop a system for evaluating and awarding JOC bids. To award a contract:
- The city must prepare a request for bids for JOC based on the solicitation documents and request sealed bids;
- Each bidder must include in its bid one or more adjustment factors to the established unit prices;
- Each bidder must agree to identify any subcontractors to be used; and
- The district must award the JOC, if any, to a bidder that the district determines is qualified and responsive.
The maximum total amount that the city may award under a single JOC must not exceed $3 million in the initial contract term, and any single job order must not exceed $750,000. The initial contract term is to be no more than 12 months, and the city may extend or renew the contract for two subsequent annual terms with a maximum of $6 million over the subsequent terms of the contract. AB 2033 does not allow for work to be split or separated into smaller job orders for the purpose of evading the cost limits the bill establishes. The city may adjust bid limits annually to reflect the percentage change in the California Consumer Price Index.
AB 2033 requires no work under JOC to be performed except by order of the city council. A city council may, by ordinance, authorize the city manager, public works director or other city official, to perform any or all acts permitted or required of the city council, including the authority to adopt and advertise plans and specifications, award job order contracts, or order the change or alteration of job order contracts with respect to the following:
- Individual job orders which do not exceed $150,000;
- Changes or alterations to job orders previously authorized by the city council where the changes or alterations do not exceed 10% of the amount of the original job order or $150,000, whichever is less; and
- The aggregate total amount of the changes or alterations to an original job order must not exceed 25% of the amount of the original job order.
Any authorization to a city official must include detailed procedures to exercise the authority. If a person with delegated authority undertakes any action, that person must report actions taken to the city council, during a regular meeting, at least once every 90 days, or more frequently at the discretion of the city council.
AB 2033 states that a contractor awarded an annual job order contract must provide an enforceable commitment to the city that the contractor and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the job order contract that falls within an apprenticeable occupation in the building and construction trades. However, the contractor is exempt from the commitment if the job order contract is subject to a project labor agreement that will bind all contractors and subcontractors performing work on the job order contract to use a skilled and trained workforce to perform the job order contract.
AB 2033 specifies that if a job order contractor chooses to use a subcontractor, the job order contractor needs to verify that the subcontractor possesses and maintains the appropriate licenses and credentials required. If the city, after conducting an administrative due process review, determines that there has been a violation of the Subletting and Subcontracting Fair Practices Act, including, but not limited to, bid shopping by the job order contractor, the city may terminate the job order contract, declare the contractor ineligible for future job order contracts for a period of time to be determined by city, or withdraw authorization for the contractor to proceed with awarded work.
AB 2033 specifies that prevailing wage requirements apply to all work ordered under the JOC and requires the contract to specify who is responsible for ensuring compliance with the requirements of prevailing wages on public works projects. The city must also designate one individual to act as a monitor to inspect job sites for labor compliance violations at the request of the designated labor representative in its PLA.
In order to prevent fraud, waste, and abuse, the city must compare the contractor’s cost estimate for each individual job order developed under a JOC. If the city finds the job order contractor’s estimate to perform work for a given job order to be unreasonable, not cost effective, or undesirable, the city may elect not to issue the job order to the job order contractor and instead use any other available procurement procedures.
An annual job order contract must not be used for any of the following:
- To lay off, reduce the hours of, or involuntarily transfer any permanent employee, as defined in the city’s applicable memorandum of understanding or civil service rules;
- To perform work that, at the time the job order is issued, is the subject of an active, written work order assigned to city employee management system; and
- To substitute for a position classification that is both currently funded in the city’s adopted budget and occupied by a permanent employee as defined in the city’s applicable memorandum of understanding or civil service rules, at the time the job order contract is awarded.
Lastly, AB 2033 requires the city that elects to use JOC to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2030, a report on the use of JOC. The report must include:
- A description of the city’s system for evaluating JOC bids for award of JOCs, including, but not limited to, the criteria used by the city to determine a qualified and responsive job order contractor;
- A description of each JOC the city awarded, and the contractor awarded the contract; and
- An assessment of the use of job order contracting under this bill.
Comments
1. Purpose of the bill. According to the author, “AB 2033 authorizes general law cities to use annual Job Order Contracts (JOCs) for projects under $500K involving repair, remodeling, and other defined-scope, project-based public works performed according to competitively bid prices.
“Currently, general law cities are limited to the traditional design-bid-award system, which requires even modest public works projects to undergo full plan preparation, advertisement, bidding, and award before work can begin. For projects such as facility rehabilitation, accessibility upgrades, or system replacements, this process can take six to twelve months to complete. In the city of Belmont, an EV charger site preparation project received no initial bids and was delayed nearly three years with estimated costs rising 30–40%, while routine restroom renovations were delayed almost a year, and emergency facility repair negotiations with an urgent contractor likely resulted in a 30–40% premium due to the lack of preset pricing.
“By allowing general law cities to use JOCs for smaller projects, AB 2033 will streamline procurement, reduce administrative costs, and enable cities to complete routine repairs and improvements more efficiently. The Legislature has already authorized the use of JOCs for other state and local agencies, and it is time that we offer the same, proven instrument for small and medium-sized projects.”
2. Protect me. The Legislature has authorized multiple agencies to use JOC, some state and some local, including counties, school districts, community college districts, the California State University system, and Caltrans. The authorities are relatively the same and similar in scope. California counties have had the authority to use JOC since 1983. Each of these statutory authorities, the local agencies have include protections for workers by requiring JOC be applied through project labor agreements. While AB 2033 includes important labor standards, including prevailing wage and skilled and trained workforce requirements, the bill does not include labor protections that are included in other JOC authorities. PLAs provide a comprehensive framework for resolving disputes, promoting apprenticeship, and workforce development opportunities while maintaining strong labor compliance. Preserving and administering project labor agreements helps ensure that public projects are completed efficiently, safely, and with a highly skilled workforce. The Committee may wish to consider whether additional language is needed to ensure contractors are protected under project labor agreements.
3. I’m here! Existing memorandum of understanding or civil service rules often require public agencies to provide advance notice to recognized employee organizations before contracting out work that is traditionally performed by public employees. AB 2033 expands the authority of cities to use JOC for a broader range of public works projects, employee organizations have expressed concern that work historically performed by the public workforce could instead be contracted to outside entities without adequate notice or an opportunity to engage with the public agency. Currently, the bill does not establish a notification requirement for recognized employee organizations prior to awarding a JOC. The Committee may wish to consider adding a requirement to notice to an affected employee organizations before a public agency awards, renews or extends a JOC provides an opportunity to address potential workforce impacts before contracts are signed.
Assembly Actions
Assembly Local Government Committee: 8-0
Assembly Floor: 69-1
Support and Opposition
(6/26/26)
Support: City of Belmont (Sponsor)
California Chapters of the American Public Works Association
City of Corona
City of Foster City
City of Rancho Cucamonga
League of California Cities
Marin County Council of Mayors and Councilmembers
The Gordian Group
Opposition: Associated General Contractors, California Chapters
California State Council of Laborers
Construction Industry Force Account Council
District Council of Iron Workers of the State of California and Vicinity
International Union of Operating Engineers
State Building and Construction Trades Council
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 2033
Author:(Papan)
As Amended Ver:May 22, 2026
Majority vote
SUMMARY
Authorizes cities to award job order contracts (JOCs) of up to $3 million, until January 1, 2032.
Major Provisions
- Authorizes cities to award JOCs using the procurement method outlined in this bill.
- Requires JOCs to be competitively bid and awarded to bidders providing qualified responsive bids.
- Requires JOCs to be for repair, remodeling, or other repetitive work to be done according to unit prices.
- Prohibits JOCs from being awarded for any new construction.
- Specifies the solicitation and award process for JOCs and requires cities to develop a system for evaluating JOC bids.
- Provides that the maximum total dollar amount that may be awarded under a single JOC shall not exceed $3 million in the initial contract term of the JOC, and that no single job order may exceed $750,000.
- Provides that JOCs may be executed for an initial contract term of no more than 12 months and may be extended or renewed for two subsequent annual terms and a maximum of $6 million over the subsequent two terms of the contract.
- Prohibits work from being split or separated into smaller job orders for the purpose of evading the cost limits of this bill and authorizes cities to adjust these amounts annually to reflect the percentage change in the California Consumer Price Index.
- Provides delegated authority for JOCs to a city manager, public works director, or other city official for job orders that do not exceed $150,000 and for changes to job orders that do not exceed 10% of the amount of the original job order or $150,000, whichever is less, with an aggregate cap of 25% of the original amount, as specified.
- Includes provisions governing the use of a skilled and trained workforce, subcontracting, prevailing wages, compliance with labor laws, and the prevention of fraud, waste and abuse, as specified.
- Prohibits an annual JOC awarded pursuant to this bill from being used for any of the following purposes:
- To lay off, reduce the hours of, or involuntarily transfer any permanent employee, as defined in the city's applicable memorandum of understanding or civil service rules.
- To perform work that, at the time the job order is issued, is the subject of an active, written work order assigned to city employees in the city's work management system.
- As a substitute for a position classification that is both currently funded in the city's adopted budget and occupied by a permanent employee, as defined in the city's applicable memorandum of understanding or civil service rules, at the time the job order contract is awarded.
- Requires cities to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2030, a report on the use of job order contracting under this bill and specifies the contents of that report.
- Provides a sunset date of January 1, 2032.
COMMENTS
A JOC is a competitively bid, fixed price, indefinite quantity contract for the performance of minor construction, as well as the renovation, alteration, painting and repair of existing public facilities. A JOC is generally a multi-year contract that includes a base year and multiple "option years," and is awarded before the awarding agency has identified specific work that it needs the contractor to perform. A typical JOC involves a variety of tasks such as roofing, electrical work, plumbing and painting, that are required for all of a public agency's buildings for a period of years.
A JOC is a fixed price agreement in that it is based upon specified charges contained in a Unit Price Book (UPB), which is prepared by the public agency or by independent commercial sources. The UPB sets forth detailed repair and construction tasks, including task descriptions, specifications, units of measurement, and unit prices for each task ("Unit Price" means the amount paid for a single unit of an item of work). A contractor's bid is expressed in terms of a percentage of the specified UPB charges. The UPB is then used to determine the costs of each proposed project during the term of the contract. As an example, if a procuring agency's per unit catalog price for an HVAC installation is $1,000, and a contractor submits a bid to do that work with an adjustment factor of 1.13, the contractor is agreeing to install the HVAC for $1,130.
The total JOC value may be specified as a range with a certain guaranteed minimum. The award of annual contracts on a unit price basis enables what would otherwise be multiple separately-bid projects to be combined into one bid. This contracting method is intended to reduce costs and accelerate completion of smaller projects. It is not generally viewed as an appropriate method of contracting for large, complex construction projects that require extensive or innovative design or are likely to encounter changes and revisions during construction. JOC are typically used for well-defined, recurring or repetitive work where quick execution is essential, not for single larger projects.
The Legislature has authorized multiple agencies to use JOC, some state and some local, including counties, school districts, community college districts, the California State University system, and Caltrans. California counties have enjoyed the authority to use JOC since 1983. Counties may award annual JOCs of up to $3 million, adjusted annually to reflect the California Consumer Price Index (CPI), to the lowest responsible bidder or using best value (for specified counties).
Additionally, as part of the 2021-2022 state budget, the Legislature authorized Caltrans to use JOC, but the authority was limited to the new Clean California Beautification Program. In 2023, as part of the Governor's Infrastructure package Caltrans' authority was expanded. SB 146 (Gonzalez), Chapter 58, Statutes of 2023, authorized Caltrans to use JOCs, through 2033, for general highway and traffic maintenance. The Legislature approved JOC authority for some regional transportation agencies including the Santa Clara Valley Transportation Authority, the Los Angeles County Metropolitan Transportation Authority (LA Metro), and the San Mateo County Transit District.
According to the Author
"Currently, general law cities are limited to the traditional design-bid-award system, which requires even modest public works projects to undergo full plan preparation, advertisement, bidding, and award before work can begin. For projects such as facility rehabilitation, accessibility upgrades, or system replacements, this process can take six to twelve months to complete. In the city of Belmont, an EV charger site preparation project received no initial bids and was delayed nearly three years with estimated costs rising 30–40%, while routine restroom renovations were delayed almost a year, and emergency facility repair negotiations with an urgent contractor likely resulted in a 30–40% premium due to the lack of preset pricing."
"By allowing general law cities to use JOCs for smaller projects, AB 2033 will streamline procurement, reduce administrative costs, and enable cities to complete routine repairs and improvements more efficiently. The Legislature has already authorized the use of JOCs for other state and local agencies, and it is time that we offer the same, proven instrument for small and medium-sized projects."
Arguments in Support
The City of Belmont, sponsor of this measure, writes, "Under current law, General Law cities like Belmont are often forced into a 'one-size-fits-all' procurement model. Even for standardized, modest-scale work, we must undergo months of design, advertisement, and formal bidding. This rigidity leads to a 'no-bid' cycle for small projects that do not attract large contractors, resulting in significant delays and inflation-driven cost increases..."
"Belmont's recent experiences highlight the urgent need for AB 2033. This authority addresses specific, documented challenges we have experienced delivering routine facility and infrastructure projects under the traditional design-bid-award process. Over the past several years, Belmont has encountered significant delays and cost escalation on projects that were modest in size but required full formal bidding procedures. For example:
- Sustainability Goals: Preparation for EV charging sites, including American Disability Act (ADA) compliance, sat for three years after receiving zero bids, ultimately costing 30–40% more than originally budgeted. The site preparation, including required ADA modifications, received no bids under the initial solicitation and experienced a three-year delay. The project ultimately saw an estimated 30–40% cost increase due to re-procurement and inflation.
- Public Safety Infrastructure: Security fencing and gate installation at a fire station—a critical County hazardous materials site—was delayed two years, seeing a 40% cost increase due to procurement hurdles.
- Routine Project Delivery: City Hall interior rehabilitation work has experienced cost escalation of approximately 30% on completed components due to procurement inefficiencies and delay, and simple restroom renovations and ADA improvements have been delayed nearly one year.
- Emergency & Urgent Work Responsiveness: During a recent water intrusion emergency, the lack of pre-established unit pricing forced an urgent negotiation that we estimate carried a 30 to 40% premium."
"These are not large-scale capital expansion projects. They are routine, necessary facility improvements that already require competitive bidding and licensed contractors under public works law. However, the current procurement structure often requires months of design preparation, advertisement, bidding, and award – even for standardized work. As a result, Belmont has also experienced substantial administrative burden on limited Public Works staff, repeated bid cycles when projects receive no bids, and delay-driven cost escalation due to inflation…"
"AB 2033 is a common-sense reform that empowers local governments to be better stewards of taxpayer dollars. It reduces administrative burdens, mitigates inflation risks, and ensures that essential public facilities are maintained without unnecessary bureaucratic delay."
Arguments in Opposition
The Western Electrical Contractors Association (WECA) writes in an "oppose, unless amended" position, "WECA does not oppose alternatives to lowest responsible bidding for small projects, those envisioned by AB 2033. However, AB 2033, as amended, repeats a deeply flawed pattern that has appeared in several recent bills: it conditions labor law enforcement on whether a project is covered by a PLA, granting preferential treatment to PLA projects while denying equal enforcement standards to all others.
"Under AB 2033, contractors on Job Order Contracting (JOC) projects are required to comply with the state's skilled and trained workforce requirements. Yet if a Project Labor Agreement (PLA) is in place, enforcement of labor standards is diverted away from the normal public enforcement mechanisms and instead relegated to private arbitration processes controlled by the parties to the PLA. This creates two separate legal regimes for the exact same statutory obligations:
- Non-PLA projects remain subject to ordinary state enforcement mechanisms, including oversight by public agencies charged with enforcing California labor law;
- PLA projects are effectively shielded from equivalent public enforcement, with disputes instead resolved through private grievance and arbitration systems inaccessible to outside scrutiny."
"This is bad public policy."
"California labor laws should be enforced uniformly and transparently by accountable public agencies—not through closed private systems accessible only to favored classes of contractors. The state should not create one enforcement standard for union-signatory contractors operating under PLAs and another for everyone else. Such unequal treatment undermines confidence in fair competition, erodes transparency, and creates the appearance that certain contractors are being granted immunity from independent regulatory oversight."
"If the skilled and trained workforce mandate is important enough to impose on every contractor working on JOC projects, then compliance must be verified and enforced equally across all projects, regardless of whether a PLA exists. A statutory labor standard cannot remain credible if its enforcement depends on the contractor's labor affiliation. WECA urges you to amend AB 2033 to eliminate this discriminatory dual-track enforcement structure and preserve equal enforcement of labor laws for all contractors."
FISCAL COMMENTS
None
VOTES
ASM LOCAL GOVERNMENT: 8-0-2
YES: Carrillo, Ta, Pacheco, Ransom, Blanca Rubio, Caloza, Ward, Wilson
ABS, ABST OR NV: Johnson, Ramos
UPDATED
VERSION: May 22, 2026
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0003129
ASSEMBLY THIRD READING
ATR Bill Id:AB 2033
Author:(Papan)
As Amended Ver:May 4, 2026
Majority vote
SUMMARY
Authorizes cities to award job order contracts (JOCs) of up to $3 million, until January 1, 2032.
Major Provisions
- Authorizes cities to award JOCs using the procurement method outlined in this bill.
- Requires JOCs to be competitively bid and awarded to bidders providing qualified responsive bids.
- Requires JOCs to be for repair, remodeling, or other repetitive work to be done according to unit prices.
- Prohibits JOCs from being awarded for any new construction.
- Specifies the solicitation and award process for JOCs and requires cities to develop a system for evaluating JOC bids.
- Provides that the maximum total dollar amount that may be awarded under a single JOC shall not exceed $3 million in the initial contract term of the JOC, and that no single job order may exceed $750,000.
- Provides that JOCs may be executed for an initial contract term of no more than 12 months and may be extended or renewed for two subsequent annual terms and a maximum of $6 million over the subsequent two terms of the contract.
- Prohibits work from being split or separated into smaller job orders for the purpose of evading the cost limits of this bill and authorizes cities to adjust these amounts annually to reflect the percentage change in the California Consumer Price Index.
- Provides delegated authority for JOCs to a city manager, public works director, or other city official for job orders that do not exceed $150,000 and for changes to job orders that do not exceed 10% of the amount of the original job order or $150,000, whichever is less, with an aggregate cap of 25% of the original amount, as specified.
- Includes provisions governing the use of a skilled and trained workforce, subcontracting, prevailing wages, compliance with labor laws, and the prevention of fraud, waste and abuse, as specified.
- Prohibits an annual JOC awarded pursuant to this bill from being used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee.
- Requires cities to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2030, a report on the use of job order contracting under this bill and specifies the contents of that report.
- Provides a sunset date of January 1, 2032.
COMMENTS
A JOC is a competitively bid, fixed price, indefinite quantity contract for the performance of minor construction, as well as the renovation, alteration, painting and repair of existing public facilities. A JOC is generally a multi-year contract that includes a base year and multiple "option years," and is awarded before the awarding agency has identified specific work that it needs the contractor to perform. A typical JOC involves a variety of tasks such as roofing, electrical work, plumbing and painting, that are required for all of a public agency's buildings for a period of years.
A JOC is a fixed price agreement in that it is based upon specified charges contained in a Unit Price Book (UPB), which is prepared by the public agency or by independent commercial sources. The UPB sets forth detailed repair and construction tasks, including task descriptions, specifications, units of measurement, and unit prices for each task ("Unit Price" means the amount paid for a single unit of an item of work). A contractor's bid is expressed in terms of a percentage of the specified UPB charges. The UPB is then used to determine the costs of each proposed project during the term of the contract. As an example, if a procuring agency's per unit catalog price for an HVAC installation is $1,000, and a contractor submits a bid to do that work with an adjustment factor of 1.13, the contractor is agreeing to install the HVAC for $1,130.
The total JOC value may be specified as a range with a certain guaranteed minimum. The award of annual contracts on a unit price basis enables what would otherwise be multiple separately-bid projects to be combined into one bid. This contracting method is intended to reduce costs and accelerate completion of smaller projects. It is not generally viewed as an appropriate method of contracting for large, complex construction projects that require extensive or innovative design or are likely to encounter changes and revisions during construction. JOC are typically used for well-defined, recurring or repetitive work where quick execution is essential, not for single larger projects.
The Legislature has authorized multiple agencies to use JOC, some state and some local, including counties, school districts, community college districts, the California State University system, and Caltrans. California counties have enjoyed the authority to use JOC since 1983. Counties may award annual JOCs of up to $3 million, adjusted annually to reflect the California Consumer Price Index (CPI), to the lowest responsible bidder or using best value (for specified counties).
Additionally, as part of the 2021-2022 state budget, the Legislature authorized Caltrans to use JOC, but the authority was limited to the new Clean California Beautification Program. In 2023, as part of the Governor's Infrastructure package Caltrans' authority was expanded. SB 146 (Gonzalez), Chapter 58, Statutes of 2023, authorized Caltrans to use JOCs, through 2033, for general highway and traffic maintenance. The Legislature approved JOC authority for some regional transportation agencies including the Santa Clara Valley Transportation Authority, the Los Angeles County Metropolitan Transportation Authority (LA Metro), and the San Mateo County Transit District.
According to the Author
"Currently, general law cities are limited to the traditional design-bid-award system, which requires even modest public works projects to undergo full plan preparation, advertisement, bidding, and award before work can begin. For projects such as facility rehabilitation, accessibility upgrades, or system replacements, this process can take six to twelve months to complete. In the city of Belmont, an EV charger site preparation project received no initial bids and was delayed nearly three years with estimated costs rising 30–40%, while routine restroom renovations were delayed almost a year, and emergency facility repair negotiations with an urgent contractor likely resulted in a 30–40% premium due to the lack of preset pricing."
"By allowing general law cities to use JOCs for smaller projects, AB 2033 will streamline procurement, reduce administrative costs, and enable cities to complete routine repairs and improvements more efficiently. The Legislature has already authorized the use of JOCs for other state and local agencies, and it is time that we offer the same, proven instrument for small and medium-sized projects."
Arguments in Support
The City of Belmont, sponsor of this measure, writes, "Under current law, General Law cities like Belmont are often forced into a 'one-size-fits-all' procurement model. Even for standardized, modest-scale work, we must undergo months of design, advertisement, and formal bidding. This rigidity leads to a 'no-bid' cycle for small projects that do not attract large contractors, resulting in significant delays and inflation-driven cost increases..."
"Belmont's recent experiences highlight the urgent need for AB 2033. This authority addresses specific, documented challenges we have experienced delivering routine facility and infrastructure projects under the traditional design-bid-award process. Over the past several years, Belmont has encountered significant delays and cost escalation on projects that were modest in size but required full formal bidding procedures. For example:
- Sustainability Goals: Preparation for EV charging sites, including American Disability Act (ADA) compliance, sat for three years after receiving zero bids, ultimately costing 30–40% more than originally budgeted. The site preparation, including required ADA modifications, received no bids under the initial solicitation and experienced a three-year delay. The project ultimately saw an estimated 30–40% cost increase due to re-procurement and inflation.
- Public Safety Infrastructure: Security fencing and gate installation at a fire station—a critical County hazardous materials site—was delayed two years, seeing a 40% cost increase due to procurement hurdles.
- Routine Project Delivery: City Hall interior rehabilitation work has experienced cost escalation of approximately 30% on completed components due to procurement inefficiencies and delay, and simple restroom renovations and ADA improvements have been delayed nearly one year.
- Emergency & Urgent Work Responsiveness: During a recent water intrusion emergency, the lack of pre-established unit pricing forced an urgent negotiation that we estimate carried a 30 to 40% premium."
"These are not large-scale capital expansion projects. They are routine, necessary facility improvements that already require competitive bidding and licensed contractors under public works law. However, the current procurement structure often requires months of design preparation, advertisement, bidding, and award – even for standardized work. As a result, Belmont has also experienced substantial administrative burden on limited Public Works staff, repeated bid cycles when projects receive no bids, and delay-driven cost escalation due to inflation…
"AB 2033 is a common-sense reform that empowers local governments to be better stewards of taxpayer dollars. It reduces administrative burdens, mitigates inflation risks, and ensures that essential public facilities are maintained without unnecessary bureaucratic delay."
Arguments in Opposition
The American Federation of State, County and Municipal Employees, AFL-CIO (AFSCME), in an "oppose, unless amended" position, writes, "While the bill has been recently amended, those changes fail to address our core concerns. As drafted, AB 2033 continues to authorize the expanded use of Job Order Contracting (JOC) for 'repair, remodeling, or other repetitive work' – a broad and undefined category that overlaps directly with work traditionally and historically performed by represented city employees."
"Although the bill includes anti-displacement language prohibiting layoffs, reductions in hours, or involuntary transfers, this provision is insufficient. JOC allows cities to divert work away from the bargaining unit without triggering these protections, resulting in the gradual erosion of public sector jobs through attrition, reduced hiring, and diminished overtime opportunities. In effect, the bill still facilitates 'outsourcing by design,' even if not by immediate displacement."
"Additionally, the bill continues to lack any meaningful transparency or accountability mechanisms related to the Unit Price Catalog and the scope of work that may be assigned under these contracts. Without advance notice or the ability for recognized employee organizations to review and challenge whether proposed work falls within their scope of representation, the statutory meet-and-confer rights guaranteed under the Meyers-Milias-Brown Act are rendered practically impossible to exercise."
"AFSCME must also note for the Committee that, despite our early engagement and clearly articulated concerns, the author's office has not engaged in meaningful or good-faith negotiations to address these issues. We have consistently offered reasonable, workable amendments to preserve public sector work and uphold collective bargaining rights, yet those proposals have not been substantively considered or incorporated into the bill."
"To resolve our opposition, we continue to urge the inclusion of amendments that would:
- Prohibit the use of JOC for work within the scope of representation of a recognized employee organization or for existing, budgeted classifications;
- Require advance notice and full disclosure of the Unit Price Catalog to affected unions prior to solicitation; and
- Provide a mechanism for employee organizations to identify and exclude bargaining unit work from JOC contracts."
"Without these safeguards, AB 2033 creates a structural loophole that undermines transparency, weakens collective bargaining, and incentivizes the outsourcing of stable, middle-class public sector jobs."
FISCAL COMMENTS
None
VOTES
ASM LOCAL GOVERNMENT: 8-0-2
YES: Carrillo, Ta, Pacheco, Ransom, Blanca Rubio, Caloza, Ward, Wilson
ABS, ABST OR NV: Johnson, Ramos
UPDATED
VERSION: May 4, 2026
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0002478
Date of Hearing: April 29, 2026
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
ABPCA Bill Id:AB 2033 (
Author:Papan) – As Amended Ver:April 20, 2026
SUBJECT: Local Agency Public Construction Act: job order contracting
SUMMARY: Authorizes cities to enter into job order contracts (JOCs). Specifically, this bill:
- Allows, notwithstanding any other law, a city council to award individual annual JOCs, none of which shall exceed $500,000, as adjusted annually to reflect the percentage change in the California Consumer Price Index (California CPI), for repair, remodeling, or other repetitive work to be done according to unit prices.
- Prohibits annual contracts from being awarded for any new construction.
- Requires contracts to be awarded to the lowest responsible bidder and to be based on plans and specifications for typical work.
- Provides that no project shall be performed under the contract except by order of the city council or an officer acting pursuant to the following:
- Allows the city council, by ordinance, to authorize the city manager, public works director, or other city official, as is deemed appropriate, to take or perform any or all acts or actions permitted or required of the city council by this bill, including the authority to adopt and advertise plans and specifications, award JOCs, or order the change or alteration of JOCs, with respect to either of the following:
- Individual job orders which do not exceed $150,000.
- Changes or alterations to job orders previously authorized by the city council where the changes or alterations do not exceed 10% of the amount of the original job order or $150,000, whichever is less.
- Provides that the aggregate total amount of the changes or alterations to an original job order specified in 5), above, may not exceed 25% of the amount of the original job order.
- Provides that any authorization pursuant to 5) and 6), above, shall include detailed procedures governing the city official in the exercise of that authority.
- Provides that this bill shall not be construed to remove the city’s requirement to follow the applicable provisions of the Public Contract Code as it relates to the advertising of public works projects and the award of public works contracts.
- Provides that an annual JOC shall not be used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee.
- Requires an entity awarded an annual JOC pursuant to this bill to provide an enforceable commitment to the city that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the JOC that falls within an apprenticable occupation in the building and construction trades, in accordance specified existing law governing skilled and trained workforce requirements for public entities. This requirement shall not apply if the JOC is subject to a project labor agreement (PLA) that will bind all contractors and subcontractors performing work on the JOC to use a skilled and trained workforce to perform the JOC.
- Requires the city to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2031, a report on the use of job order contracting under this bill. The report shall include, but not be limited to, all of the following information:
- A description of the city’s system for evaluating JOC bids for award of JOCs, including, but not limited to, the criteria used by the city to determine a qualified and responsive job order contractor.
- A description of each JOC awarded and the contractor awarded the contract.
- An assessment of the use of job order contracting under this article.
- Requires a report specified in 11), above, to be submitted pursuant to specified existing law governing reports to the Legislature.
- Specifies that a city that has elected to be subject to the Uniform Public Construction Cost Accounting Act (UPCCAA) may award job order contracts as provided in this bill.
FISCAL EFFECT: None
COMMENTS:
- Author’s Statement. According to the author, “AB 2033 authorizes general law cities to use annual Job Order Contracts (JOCs) for projects under $500K involving repair, remodeling, and other defined-scope, project-based public works performed according to competitively bid prices.
“Currently, general law cities are limited to the traditional design-bid-award system, which requires even modest public works projects to undergo full plan preparation, advertisement, bidding, and award before work can begin. For projects such as facility rehabilitation, accessibility upgrades, or system replacements, this process can take six to twelve months to complete. In the city of Belmont, an EV charger site preparation project received no initial bids and was delayed nearly three years with estimated costs rising 30–40%, while routine restroom renovations were delayed almost a year, and emergency facility repair negotiations with an urgent contractor likely resulted in a 30–40% premium due to the lack of preset pricing.
“By allowing general law cities to use JOCs for smaller projects, AB 2033 will streamline procurement, reduce administrative costs, and enable cities to complete routine repairs and improvements more efficiently. The Legislature has already authorized the use of JOCs for other state and local agencies, and it is time that we offer the same, proven instrument for small and medium-sized projects.”
- Background. A JOC is a competitively bid, fixed price, indefinite quantity contract for the performance of minor construction, as well as the renovation, alteration, painting and repair of existing public facilities. A JOC is generally a multi-year contract that includes a base year and multiple “option years,” and is awarded before the awarding agency has identified specific work that it needs the contractor to perform. A typical JOC involves a variety of tasks such as roofing, electrical work, plumbing and painting, that are required for all of a public agency’s buildings for a period of years.
A JOC is a fixed price agreement in that it is based upon specified charges contained in a Unit Price Book (UPB), which is prepared by the public agency or by independent commercial sources. The UPB sets forth detailed repair and construction tasks, including task descriptions, specifications, units of measurement, and unit prices for each task (“Unit Price” means the amount paid for a single unit of an item of work). A contractor’s bid is expressed in terms of a percentage of the specified UPB charges. The UPB is then used to determine the costs of each proposed project during the term of the contract. As an example, if a procuring agency’s per unit catalog price for an HVAC installation is $1,000, and a contractor submits a bid to do that work with an adjustment factor of 1.13, the contractor is agreeing to install the HVAC for $1,130.
The total JOC value may be specified as a range with a certain guaranteed minimum. The award of annual contracts on a unit price basis enables what would otherwise be multiple separately-bid projects to be combined into one bid. This contracting method is intended to reduce costs and accelerate completion of smaller projects. It is not generally viewed as an appropriate method of contracting for large, complex construction projects that require extensive or innovative design or are likely to encounter changes and revisions during construction. JOC are typically used for well-defined, recurring or repetitive work where quick execution is essential, not for single larger projects.
The Legislature has authorized multiple agencies to use JOC, some state and some local, including counties, school districts, community college districts, the California State University system, and Caltrans. California counties have enjoyed the authority to use JOC since 1983. Counties may award annual JOCs of up to $3 million, adjusted annually to reflect the California CPI, to the lowest responsible bidder or using best value (for specified counties).
Additionally, as part of the 2021-2022 state budget, the Legislature authorized Caltrans to use JOC, but the authority was limited to the new Clean California Beautification Program. In 2023, as part of the Governor’s Infrastructure package Caltrans’ authority was expanded. SB 146 (Gonzalez), Chapter 58, Statutes of 2023, authorized Caltrans to use JOCs, through 2033, for general highway and traffic maintenance. The Legislature approved JOC authority for some regional transportation agencies including the Santa Clara Valley Transportation Authority and the Los Angeles County Metropolitan Transportation Authority (LA Metro).
- SB 272 of 2025. The Legislature approved the most recent JOC authorization just last year via SB 2472 (Becker), Chapter 310, Statutes of 2025, which authorized the San Mateo County Transit District (SamTrans) to enter into JOCs on a competitive basis for repair, remodeling, or other repetitive work according to unit prices.
SB 272 contained a number of specific and detailed parameters within which SamTrans was authorized to enter into JOCs. The bill:
- Prohibited JOCs from being awarded for any new construction.
- Limited the maximum total dollar amount that may be awarded under a single JOC to $5 million in the initial contract term and specified that no single job order may exceed $1 million.
- Specified that JOCs may be executed for an initial contract term of no more than 12 months and may be extended or renewed for two subsequent annual terms totaling a maximum of $10 million.
- Prohibited SamTrans from contracting for work that is protected by applicable collective bargaining agreements, required all JOCs to comply with all SamTrans collective bargaining agreements, and required JOCs to be subject to a PLA between SamTrans and the San Mateo Building Trades Council, as specified.
- Required specified subcontracting practices, the payment of prevailing wages, and mechanisms for ensuring labor compliance consistent with existing law, as specified.
- Outlined the process for SamTrans to follow in soliciting and awarding JOCs, including the ability to award job orders of $250,000 or less to Small Business Enterprise (SBE) or Disabled Veterans Business Enterprise (DVBE) contractors.
- Required SamTrans to submit to the appropriate policy and fiscal committees of the Legislature, on or before January 1, 2030, a report on its use of job order contracting, as specified.
- Provided a sunset date of January 1, 2032.
- Bill Summary. This bill allows, notwithstanding any other law, a city council to award individual annual JOCs, none of which shall exceed $500,000, as adjusted annually to reflect the percentage change in the California CPI, for repair, remodeling, or other repetitive work to be done according to unit prices. This bill:
- Prohibits annual contracts from being awarded for any new construction.
- Requires contracts to be awarded to the lowest responsible bidder and to be based on plans and specifications for typical work.
- Authorizes delegated authority to the city manager, public works director, or other city official for job orders of $150,000 or less, or changes to job orders that do not exceed 10% of the amount of the original job order or $150,000, whichever is less. The aggregate total amount of these changes may not exceed 25% of the amount of the original job order. This delegated authority shall include detailed procedures governing the city official in the exercise of that authority.
- Provides that this bill shall not be construed to remove the city’s requirement to follow the applicable provisions of the Public Contract Code as it relates to the advertising of public works projects and the award of public works contracts.
- Provides that an annual JOC shall not be used to lay off, reduce the hours of, or involuntarily transfer any permanent city employee.
- Requires an entity awarded an annual JOC to provide an enforceable commitment that the entity and its subcontractors will use a skilled and trained workforce, as specified.
- Requires a city to submit a report with specified contents to the Legislature on the use of job order contracting by January 1, 2031.
- Specifies that a city that has elected to be subject to the UPCCAA may award job order contracts as provided in this bill.
This bill is sponsored by the City of Belmont.
- Policy Considerations. The Committee may wish to consider the following:
- Consistency with Recent JOC Authorization. While this bill contains some of the details and parameters that were included in SB 272, some of these details are missing from this bill. These include:
- The process for soliciting and awarding JOCs, including (among other things) allowing cities to award JOCs to qualified and responsive bidders based on pre-established criteria determined by the city.
- Specifications regarding contract renewals and a prohibition against splitting work for smaller job orders for the purpose of evading the cost limits in this bill.
- Provisions requiring compliance with the Subletting and Subcontracting Fair Practices Act and other subcontracting practices.
- Provisions governing the payment of prevailing wages pursuant to specified existing law, including ensuring compliance with these provisions.
- Provisions to prevent fraud, waste and abuse through the preparation of independent cost estimates.
- A sunset date to provide automatic Legislative review of this new authorization for cities throughout the state.
- Consistency with Recent JOC Authorization. While this bill contains some of the details and parameters that were included in SB 272, some of these details are missing from this bill. These include:
The Committee may wish to consider if additional details and parameters should be included in this bill.
- Caps for JOCs and Job Orders. The Gordian Group, which provides services to assist public agencies in efficiently running their JOC programs, writes in a “support, if amended” position, “Our sole concern with AB 2033 is that the caps proposed for JOC contracts, and individual job orders under them, are too low to achieve the efficiencies that guarantee cost savings and reduced project delivery time. When Gordian helps a public agency develop a new JOC program, Gordian does so at no charge to the public agency client. Gordian invests resources to develop a custom construction task catalog that is tailored to the local labor and material costs. Gordian only gets paid if and when the public agency uses JOC, as Gordian receives a percentage of the value of each Job Order.
“With current caps in the bill ($500,000 per contract, and only $150,000 per job order), Gordian could not justify the up-front expense of setting up a JOC program for an individual city, because at those low amounts, Gordian would never be able to cover its costs, let alone make a profit. As a result, Gordian would likely not be able to submit a bid to provide JOC services to any city in California that might otherwise benefit from AB 2033. Furthermore, the burden of procuring JOC services would likely not be worth the effort for the vast majority of cities, who would only be able to utilize their JOC program for a very limited number of projects a year and would create an undue burden to utilize a program built on efficiencies. Additional local controls could be added in if desired, but considerations should be made for the utilization of this program by entities of all sizes.”
The Committee may wish to consider if the caps in this bill should be increased to provide a JOC authorization that will be more useful to cities.
- Delegated Authority. This bill allows a city council to delegate its authority over the use of JOC to a city manager, public works director, or other city official. While this language does require detailed procedures governing the city official in the exercise of this authority, it does not include any requirement to report back to the city council after the delegated official exercise this authority.
The Committee may wish to consider if a requirement to report to the city council should be added to this bill.
- Committee Amendments. The Committee may wish to adopt the following amendments to address the policy considerations noted above:
- Add language, consistent with the provisions of AB 272, to:
- Specify the process for soliciting and awarding JOCs.
- Add requirements for contract renewals and prohibit the splitting of work for smaller job orders for the purpose of evading the cost limits in this bill.
- Add requirements for complying with the Subletting and Subcontracting Fair Practices Act and other subcontracting practices.
- Add provisions governing the payment of prevailing wages and ensuring compliance with these provisions.
- Add provisions to prevent fraud, waste and abuse through the comparison of cost estimates with unit prices before a job order is issued.
- Add a sunset date of January 1, 2032.
- Set higher caps at $3 million for annual JOCs, and at $750,000 for individual job orders.
- Require, if a person with authority delegated pursuant to this bill undertakes any action authorized by this bill, that person to report those actions to the city council at a regular meeting at least quarterly.
- Add language, consistent with the provisions of AB 272, to:
- Related Legislation. AB 1809 (Fong) extends and modifies JOC authority for school and community college districts (CCDs), establishes contract duration limits, and updates project and cost oversight provisions. AB 1809 is pending in the Appropriations Committee.
SB 983 (Weber Pierson) authorizes the use of JOC for the San Diego Unified Port District until January 1, 2037. SB 983 is pending in the Senate Local Government Committee.
SB 1055 (Laird) authorizes the Pajaro Regional Flood Management Agency to use specified procurement methods and processes (including JOC, among others) for flood projects. SB 1055 is pending in the Senate Appropriations Committee.
- Previous Legislation. AB 499 (Luz Rivas), Chapter 87, Statutes of 2023, authorized LA Metro to enter into job order contracts JOCs.
SB 146 (Gonzalez), Chapter 58, Statutes of 2023, expanded Caltrans authorization to use JOCs, through 2033, for general highway and traffic maintenance.
AB 2039 (Luz Rivas) of 2022 was nearly identical to AB 499. AB 2039 was held in the Senate Transportation Committee.
AB 2763 (Kalra), Chapter 803, Statutes of 2022, authorized the Santa Clara Valley Transportation Authority to enter into JOCs.
SB 1366 (McGuire) of 2022 would have authorized DGS to engage in job order contracting for certain public works projects, until July 1, 2027. SB 1366 was held on the Senate Floor.
AB 149 (Committee on Budget), Chapter 81, Statutes of 2021, among other things, authorized Caltrans to utilize job order contracting for the Clean California Beautification Program of 2021, as specified.
AB 846 (Low), Chapter 303, Statutes of 2021, extended the existing authority for school and community college districts to administer job order contracting, until January 1, 2027.
AB 618 (Low), Chapter 296, Statutes of 2017, authorized community college districts to enter into JOCs, until January 1, 2022.
SB 793 (Hill), Chapter 627, Statutes of 2017, allowed specified counties to use the best value construction contracting method to award JOCs for up to $3 million, adjusted for inflation.
AB 1431 (Gomez), Chapter 753, Statutes of 2015, authorized school districts to utilize job order contracting.
SB 744 (Hughes), Chapter 431, Statutes of 1997, increased the annual maximum contract amount that counties may award for county JOCs from $1 million to $3 million.
AB 680 (La Follette), Chapter 164, Statutes of 1983, authorized counties to award annual JOCs of up to $1 million.
- Arguments in Support. The City of Belmont, sponsor of this measure, writes, “Under current law, General Law cities like Belmont are often forced into a ‘one-size-fits-all’ procurement model. Even for standardized, modest-scale work, we must undergo months of design, advertisement, and formal bidding. This rigidity leads to a ‘no-bid’ cycle for small projects that do not attract large contractors, resulting in significant delays and inflation-driven cost increases...
“Belmont’s recent experiences highlight the urgent need for AB 2033. This authority addresses specific, documented challenges we have experienced delivering routine facility and infrastructure projects under the traditional design-bid-award process. Over the past several years, Belmont has encountered significant delays and cost escalation on projects that were modest in size but required full formal bidding procedures. For example:
- Sustainability Goals: Preparation for EV charging sites, including ADA compliance, sat for three years after receiving zero bids, ultimately costing 30–40% more than originally budgeted. The site preparation, including required ADA modifications, received no bids under the initial solicitation and experienced a three-year delay. The project ultimately saw an estimated 30–40 percent cost increase due to re-procurement and inflation.
- Public Safety Infrastructure: Security fencing and gate installation at a fire station—a critical County hazardous materials site—was delayed two years, seeing a 40% cost increase due to procurement hurdles.
- Routine Project Delivery: City Hall interior rehabilitation work has experienced cost escalation of approximately 30 percent on completed components due to procurement inefficiencies and delay, and simple restroom renovations and ADA improvements have been delayed nearly one year.
- Emergency & Urgent Work Responsiveness: During a recent water intrusion emergency, the lack of pre-established unit pricing forced an urgent negotiation that we estimate carried a 30 to 40% premium.
“These are not large-scale capital expansion projects. They are routine, necessary facility improvements that already require competitive bidding and licensed contractors under public works law. However, the current procurement structure often requires months of design preparation, advertisement, bidding, and award – even for standardized work. As a result, Belmont has also experienced substantial administrative burden on limited Public Works staff, repeated bid cycles when projects receive no bids, and delay-driven cost escalation due to inflation…
“AB 2033 is a common-sense reform that empowers local governments to be better stewards of taxpayer dollars. It reduces administrative burdens, mitigates inflation risks, and ensures that essential public facilities are maintained without unnecessary bureaucratic delay.”
- Arguments in Opposition. The American Federation of State, County and Municipal Employees, AFL-CIO (AFSCME), in an “oppose, unless amended” position, writes, “While the bill has been recently amended, those changes fail to address our core concerns. As drafted, AB 2033 continues to authorize the expanded use of Job Order Contracting (JOC) for ‘repair, remodeling, or other repetitive work’ – a broad and undefined category that overlaps directly with work traditionally and historically performed by represented city employees.
“Although the bill includes anti-displacement language prohibiting layoffs, reductions in hours, or involuntary transfers, this provision is insufficient. JOC allows cities to divert work away from the bargaining unit without triggering these protections, resulting in the gradual erosion of public sector jobs through attrition, reduced hiring, and diminished overtime opportunities. In effect, the bill still facilitates ‘outsourcing by design,’ even if not by immediate displacement.
“Additionally, the bill continues to lack any meaningful transparency or accountability mechanisms related to the Unit Price Catalog and the scope of work that may be assigned under these contracts. Without advance notice or the ability for recognized employee organizations to review and challenge whether proposed work falls within their scope of representation, the statutory meet-and-confer rights guaranteed under the Meyers-Milias-Brown Act are rendered practically impossible to exercise.
“AFSCME must also note for the Committee that, despite our early engagement and clearly articulated concerns, the author’s office has not engaged in meaningful or good-faith negotiations to address these issues. We have consistently offered reasonable, workable amendments to preserve public sector work and uphold collective bargaining rights, yet those proposals have not been substantively considered or incorporated into the bill.
“To resolve our opposition, we continue to urge the inclusion of amendments that would:
- Prohibit the use of JOC for work within the scope of representation of a recognized employee organization or for existing, budgeted classifications;
- Require advance notice and full disclosure of the Unit Price Catalog to affected unions prior to solicitation; and
- Provide a mechanism for employee organizations to identify and exclude bargaining unit work from JOC contracts.
“Without these safeguards, AB 2033 creates a structural loophole that undermines transparency, weakens collective bargaining, and incentivizes the outsourcing of stable, middle-class public sector jobs.”
REGISTERED SUPPORT / OPPOSITION:
Support
City of Belmont [SPONSOR]
California Chapters of the American Public Works Association
City of Foster City
League of California Cities
The Gordian Group (if amended)
Opposition
American Federation of State, County and Municipal Employees, AFL-CIO (unless amended)
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
Bill Author
Bill Co-Author(s):