SB 617: Public contracts: progressive design-build: local and regional agencies: transit.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2023-10-04
Current Status:
Passed
(2023-10-04: Chaptered by Secretary of State. Chapter 310, Statutes of 2023.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law, until January 1, 2029, authorizes local agencies, defined as any city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process for up to 15 public works projects in excess of $5,000,000 for each project that treats, pumps, stores, or conveys water, wastewater, recycled water, advanced treated water, or supporting facilities. Existing law defines progressive design-build as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project. Existing law requires the selected entity and its general partners or joint venture members to verify specified information under penalty of perjury. Existing law requires local agencies to report to the Legislature by January 1, 2028, regarding the use of the progressive design-build process, as specified.
This bill, until January 1, 2029, would similarly authorize a transit district, municipal operator, consolidated agency, joint powers authority, regional transportation agency, or local or regional agency, as described, to use the progressive design-build process for up to 10 public works projects in excess of $5,000,000 for each project. The bill would, similarly, require information to be provided under penalty of perjury and would require submission of a similar report to the Legislature. The bill would specify that this authority to use the progressive design-build process does not include inspection services for projects on, or interfacing with, the state highway system.
By expanding the crime of perjury, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, until January 1, 2029, authorizes local agencies, defined as any city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process for up to 15 public works projects in excess of $5,000,000 for each project that treats, pumps, stores, or conveys water, wastewater, recycled water, advanced treated water, or supporting facilities. Existing law defines progressive design-build as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project. Existing law requires the selected entity and its general partners or joint venture members to verify specified information under penalty of perjury. Existing law requires local agencies to report to the Legislature by January 1, 2028, regarding the use of the progressive design-build process, as specified.
This bill, until January 1, 2029, would similarly authorize a transit district, municipal operator, consolidated agency, joint powers authority, regional transportation agency, or local or regional agency, as described, to use the progressive design-build process for up to 10 public works projects in excess of $5,000,000 for each project. The bill would, similarly, require information to be provided under penalty of perjury and would require submission of a similar report to the Legislature. The bill would specify that this authority to use the progressive design-build process does not include inspection services for projects on, or interfacing with, the state highway system.
By expanding the crime of perjury, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, until January 1, 2029, authorizes local agencies, defined as any city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process for up to 15 public works projects in excess of $5,000,000 for each project. project that treats, pumps, stores, or conveys water, wastewater, recycled water, advanced treated water, or supporting facilities. Existing law defines progressive design-build as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project. Existing law requires the selected entity and its general partners or joint venture members to verify specified information under penalty of perjury. Existing law requires local agencies to report to the Legislature by January 1, 2028, regarding the use of the progressive design-build process, as specified.
This bill would additionally bill, until January 1, 2029, would similarly authorize a transit district, municipal operator, consolidated agency, joint powers authority, regional transportation agency, or local or regional agency, as described, to use the progressive design-build process. process for up to 10 public works projects in excess of $5,000,000 for each project. The bill would, similarly, require information to be provided under penalty of perjury and would require submission of a similar report to the Legislature. The bill would specify that the this authority to use the progressive design-build process does not include inspection services for projects on, or interfacing with, the state highway system.
By expanding the local agencies that may use the progressive design-build process and thus expanding the crime of perjury, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, until January 1, 2029, authorizes local agencies, defined as any city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process for up to 15 public works projects in excess of $5,000,000 for each project. Existing law defines progressive design-build as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project. Existing law requires the selected entity and its general partners or joint venture members to verify specified information under penalty of perjury.
This bill would additionally authorize a transit district, municipal operator, consolidated agency, joint powers authority, regional transportation agency, or local or regional agency, as described, to use the progressive design-build process. The bill would specify that the authority to use the progressive design-build process does not include inspection services for projects on, or interfacing with, the state highway system.
By expanding the local agencies that may use the progressive design-build process and thus expanding the crime of perjury, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes a regional transportation agency to utilize the design-build method of procurement to design and construct projects on or adjacent to the state highway system, including related nonhighway portions of the project, based on either best value or lowest responsible bid. Existing law also authorizes a regional transportation agency to utilize the design-build method of procurement, based on either best value or lowest responsible bid, to design and construct projects on expressways that are not on the state highway system if the projects are developed pursuant to an expenditure plan, as specified.This bill would provide that the above-described authorizations to use design-build procurement also include authorization to use progressive design-build procurement, as defined.Existing law authorizes a regional transportation agency to utilize the design-build method of procurement to design and construct projects on or adjacent to the state highway system, including related nonhighway portions of the project, based on either best value or lowest responsible bid. Existing law also authorizes a regional transportation agency to utilize the design-build method of procurement, based on either best value or lowest responsible bid, to design and construct projects on expressways that are not on the state highway system if the projects are developed pursuant to an expenditure plan, as specified.
This bill would provide that the above-described authorizations to use design-build procurement also include authorization to use progressive design-build procurement, as defined.
For purposes of this chapter, the following definitions apply:
(a)(1) Best value means a value determined by evaluation of objective criteria that may include, but are not limited to, price, features, function, life-cycle costs, experience, and past performance.
(2)A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and the objectives of the project.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services, as needed, pursuant to a design-build contract.
(d)Design-build project means a project using the progressive design-build construction procurement process described in this chapter.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Guaranteed maximum price means the maximum payment amount agreed upon by the local agency and the design-build entity for the design-build entity to finish all remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(g)Local agency means any of the following:
(1)A transit district, included transit district, municipal operator, included municipal operator, or a consolidated agency, as described in Section 132353.1 of the Public Utilities Code.
(2)A joint powers authority formed to provide transit service, or a county transportation commission created pursuant to Section 130050, 130050.1, or 130050.2 of the Public Utilities Code.
(3)A regional transportation agency, as defined in subdivision (i) of Section 6820.
(4)A local or regional agency responsible for the construction of transit projects.
(h)Progressive design-build means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
(i)Qualifications-based selection means the process by which the local agency solicits for services from the design-build entities and that price is not the sole factor as the basis of award.
22180.1.A local agency may procure progressive design-build contracts and use the progressive design-build contracting process described in this chapter for up to 10 public works projects in excess of five million dollars ($5,000,000) for each project.
22180.2.A local agency entering into design-build contracts authorized under this chapter shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the local agency relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team.
22180.3.The procurement process for progressive design-build projects shall progress as follows:
(a)The local agency shall prepare and issue a request for qualifications in order to select a design-build entity to execute the project. The request for qualifications shall include, but is not limited to, the following elements:
(1)Documentation of the size, type, and desired design character of the project and any other information deemed necessary to describe adequately the local agencys needs, including the expected cost range, the methodology that will be used by the local agency to evaluate the design-build entitys qualifications, the procedure for final selection of the design-build entity, and any other information deemed necessary by the local agency to inform interested parties of the contracting opportunity.
(2)Significant factors that the local agency reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, and all other nonprice-related factors. The local agency may require that a preliminary cost estimate be included in the design-build entities responses and consider those costs in evaluating the statements of qualifications.
(3)The relative importance or the weight assigned to each of the factors identified in the request for qualifications.
(4)A standard template request for statements of qualifications prepared by the local agency. In preparing the standard template, the local agency may consult with the construction industry, the building trades and surety industry, and other local agencies interested in using the authorization provided by this chapter. The template shall require the following information:
(A)If the design-build entity is a privately held corporation, limited liability company, partnership, or joint venture, a listing of all of the entitys shareholders, partners, or members known at the time of the statement of qualification submission who will perform work on the project.
(B)Evidence that the members of the design-build team have completed, or have demonstrated the experience, competency, capability, and capacity to complete, projects of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the design-build entity has the capacity to complete the project.
(C)The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.
(D)Evidence that establishes that the design-build entity has the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.
(E)Information concerning workers compensation experience history and a worker safety program.
(F)If the proposed design-build entity is a corporation, limited liability company, partnership, joint venture, or other legal entity, a copy of the organizational documents or agreement committing to form the organization.
(G)An acceptable safety record. A proposers safety record shall be deemed acceptable if its experience modification rate for the most recent three-year period is an average of 1.00 or less, and its average total recordable injury or illness rate and average lost work rate for the most recent three-year period does not exceed the applicable statistical standards for its business category or if the proposer is a party to an alternative dispute resolution system as provided for in Section 3201.5 of the Labor Code.
(5)The information required under this subdivision shall be certified under penalty of perjury by the design-build entity and its general partners or joint venture members.
(b)(1) A design-build entity shall not be evaluated for selection unless the entity provides an enforceable commitment to the local agency that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.
(2)This subdivision shall not apply if one or more of the following requirements are met:
(A)The local agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project or contract to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(B)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the local agency before January 1, 2023.
(C)The entity has entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project or contract to use a skilled and trained workforce.
(3)For purposes of this subdivision, project labor agreement has the same meaning as provided in paragraph (1) of subdivision (b) of Section 2500.
(c)At the close of the solicitation period, the local agency shall review the submissions. The local agency may evaluate submissions based solely upon the information provided in each design-build entitys statement of qualifications. The local agency may also interview some or all of the design-build entities to further evaluate their qualifications for the project.
(d)Notwithstanding any other provision of this code, upon issuance of a contract award, the local agency shall publicly announce its award, identifying the design-build entity to which the award is made, along with a statement regarding the basis of the award. The statement regarding the local agencys contract award and the contract file shall provide sufficient information to satisfy an external audit.
22180.4.(a)The design-build entity shall provide payment and performance bonds for the project in the form and in the amount required by the local agency, and issued by a California admitted surety. The amount of the payment bond shall not be less than the amount of the performance bond.
(b)The design-build contract shall require errors and omissions insurance coverage for the design elements of the project.
(c)The local agency shall develop a standard form of payment and performance bond for its design-build projects.
22180.5.(a)After selecting a design-build entity based upon qualifications, the local agency may enter into a contract and direct the design-build entity to begin design and preconstruction activities sufficient to establish a guaranteed maximum price for the project.
(b)(1) Upon agreement of the guaranteed maximum price for the project, the local agency, at its sole and absolute discretion, may amend its contract with the design-build entity to contract for the remaining design, preconstruction, and construction activities sufficient to complete and close out the project, consistent with the guaranteed maximum price. In the event that there are unforeseen site conditions, the local agency may amend its contract with the design-build entity accordingly and consistent with the guaranteed maximum price, to enable the entity to complete the remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(2)If the cost for completing all remaining design, preconstruction, and construction activities sufficient to complete and close out the project exceed the guaranteed maximum price, the costs exceeding the guaranteed maximum price shall be the responsibility of the design-build entity. If the cost for these activities are less than the guaranteed maximum price, the design-build entity shall not be entitled to the difference between the cost and the guaranteed maximum price unless there is a prior written agreement concerning the sharing of these funds. For purposes of this section, cost shall include the design-build entitys direct costs, general conditions, overhead, and fee.
(c)(1) If the local agency and the design-build entity do not reach agreement on a guaranteed maximum price, or the local agency otherwise elects not to amend the design-build entitys contract to complete the remaining work, the local agency may solicit proposals to complete the project from firms that submitted statements of qualifications pursuant to Section 22180.3. The local agency may also, upon written determination that it is in the best interest of the city, county, city and county, or special district, as applicable, to do so, formally solicit proposals from other design-build entities, and contract award shall be made on a best value basis.
(2)The design professionals responsible for performing design services on behalf of a design-build entity that has been replaced pursuant to paragraph (1) shall have sole liability for their design errors and omissions, provided the local agency elects to use their complete and stamped designs with subsequent design-build entities or licensed contractors.
22180.6.(a)The local agency, in each design-build request for qualifications, may identify specific types of subcontractors that shall be included in the design-build entitys statement of qualifications. All construction subcontractors that are identified in the statement of qualifications shall be afforded the protections of Chapter 4 (commencing with Section 4100) of Part 1.
(b)Following award of the design-build contract, except for those construction subcontractors listed in the statement of qualifications, the design-build entity shall proceed as listed in this subdivision in awarding construction subcontracts with a value exceeding one-half of 1 percent of the contract price allocable to construction work for projects with a contract value greater than or equal to ten million dollars ($10,000,000).
(1)Provide public notice of availability of work to be subcontracted in accordance with the publication requirements applicable to the competitive bidding process of the local agency, including a fixed date and time on which qualifications statements, bids, or proposals will be due.
(2)Establish reasonable qualification criteria and standards.
(3)Award the subcontract on a best value basis. The process may include prequalification or short-listing.
(c)Subcontractors awarded construction subcontracts under this subdivision shall be afforded all the protections of Chapter 4 (commencing with Section 4100) of Part 1.
(d)A construction subcontractor licensed pursuant to Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code that provides design services used on a project authorized by this chapter shall not be subject to any liability arising from their design if the construction subcontract for that design is not performed by that subcontractor.
22180.7.(a)If the local agency elects to award a project pursuant to this chapter, retention proceeds withheld by the local agency from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation. Work performed to establish the guaranteed maximum price shall not be subject to retention.
(b)In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld shall not exceed the percentage specified in the contract between the local agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, before or at the time the bid is requested, that a bond may be required, and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the local agency and the design-build entity from any payment made by the design-build entity to the subcontractor.
22180.8.(a)Notwithstanding Section 10231.5 of the Government Code, no later than January 1, 2028, a local agency that uses the progressive design-build process pursuant to this chapter shall submit to the appropriate policy and fiscal committees of the Legislature a report on the use of the progressive design-build process.
(b)The report shall include, but is not limited to, the following information:
(1)A description of the project or projects awarded using the progressive design-build process.
(2)The contract award amounts.
(3)The design-build entities awarded the project or projects.
(4)A description of any written protests concerning any aspect of the solicitation, bid, or award of the contracts, including the resolution of the protests.
(5)A description of the prequalification process.
(6)The number of specialty subcontractors listed by construction trade type, on each project, that provided design services, but did not meet the target price for their scope of work, and therefore did not perform construction services on that project.
(7)Whether or not any portion of a design prepared by the specialty subcontractor that did not perform the construction work for that design was used by the local agency.
(8)The number of specialty subcontractors listed by construction trade type, on each project, that meet the definition of a small business, as specified in paragraph (1) of subdivision (d) of Section 14837 of the Government Code.
(9)The number of specialty subcontractors listed by construction trade type, on each project, that meet the definition of a microbusiness, as specified in paragraph (2) of subdivision (d) of Section 14837 of the Government Code.
(10)If a project awarded under this chapter has been completed, an assessment of the project performance, including, but not limited to, a summary of any delays or cost increases.
(c)The report submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
22180.9.The authorization to use the progressive design-build contracting process pursuant to this chapter does not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system. Construction inspection services for those projects shall be performed by the Department of Transportation pursuant to Part 5 (commencing with Section 14000) of Division 3 of Title 2 of the Government Code, consistent with Section 91.2 of the Streets and Highways Code.
22180.10.Nothing in this chapter affects, expands, alters, or limits any rights or remedies otherwise available at law.
22180.11.This chapter shall remain in effect only until January 1, 2029, and as of that date is repealed.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this chapter, the following definitions apply:
(a)(1) Best value means a value determined by evaluation of objective criteria that may include, but are not limited to, price, features, function, life-cycle costs, experience, and past performance.
(2)A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and the objectives of the project.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services, as needed, pursuant to a design-build contract.
(d)Design-build project means a project using the progressive design-build construction procurement process described in this chapter.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Guaranteed maximum price means the maximum payment amount agreed upon by the local agency and the design-build entity for the design-build entity to finish all remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(g)Local agency means any of the following:
(1)A transit district, included transit district, municipal operator, included municipal operator, or a consolidated agency, as described in Section 132353.1 of the Public Utilities Code.
(2)A joint powers authority formed to provide transit service, or a county transportation commission created pursuant to Section 130050, 130050.1, or 130050.2 of the Public Utilities Code.
(3)A regional transportation agency, as defined in subdivision (i) of Section 6820.
(4)A local or regional agency responsible for the construction of transit projects.
(h)Progressive design-build means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
(i)Qualifications-based selection means the process by which the local agency solicits for services from the design-build entities and that price is not the sole factor as the basis of award.
22180.1.A local agency may procure progressive design-build contracts and use the progressive design-build contracting process described in this chapter for up to 10 public works projects in excess of five million dollars ($5,000,000) for each project.
22180.2.A local agency entering into design-build contracts authorized under this chapter shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the local agency relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team.
22180.3.The procurement process for progressive design-build projects shall progress as follows:
(a)The local agency shall prepare and issue a request for qualifications in order to select a design-build entity to execute the project. The request for qualifications shall include, but is not limited to, the following elements:
(1)Documentation of the size, type, and desired design character of the project and any other information deemed necessary to describe adequately the local agencys needs, including the expected cost range, the methodology that will be used by the local agency to evaluate the design-build entitys qualifications, the procedure for final selection of the design-build entity, and any other information deemed necessary by the local agency to inform interested parties of the contracting opportunity.
(2)Significant factors that the local agency reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, and all other nonprice-related factors. The local agency may require that a preliminary cost estimate be included in the design-build entities responses and consider those costs in evaluating the statements of qualifications.
(3)The relative importance or the weight assigned to each of the factors identified in the request for qualifications.
(4)A standard template request for statements of qualifications prepared by the local agency. In preparing the standard template, the local agency may consult with the construction industry, the building trades and surety industry, and other local agencies interested in using the authorization provided by this chapter. The template shall require the following information:
(A)If the design-build entity is a privately held corporation, limited liability company, partnership, or joint venture, a listing of all of the entitys shareholders, partners, or members known at the time of the statement of qualification submission who will perform work on the project.
(B)Evidence that the members of the design-build team have completed, or have demonstrated the experience, competency, capability, and capacity to complete, projects of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the design-build entity has the capacity to complete the project.
(C)The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.
(D)Evidence that establishes that the design-build entity has the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.
(E)Information concerning workers compensation experience history and a worker safety program.
(F)If the proposed design-build entity is a corporation, limited liability company, partnership, joint venture, or other legal entity, a copy of the organizational documents or agreement committing to form the organization.
(G)An acceptable safety record. A proposers safety record shall be deemed acceptable if its experience modification rate for the most recent three-year period is an average of 1.00 or less, and its average total recordable injury or illness rate and average lost work rate for the most recent three-year period does not exceed the applicable statistical standards for its business category or if the proposer is a party to an alternative dispute resolution system as provided for in Section 3201.5 of the Labor Code.
(5)The information required under this subdivision shall be certified under penalty of perjury by the design-build entity and its general partners or joint venture members.
(b)(1) A design-build entity shall not be evaluated for selection unless the entity provides an enforceable commitment to the local agency that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.
(2)This subdivision shall not apply if one or more of the following requirements are met:
(A)The local agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project or contract to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(B)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the local agency before January 1, 2023.
(C)The entity has entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project or contract to use a skilled and trained workforce.
(3)For purposes of this subdivision, project labor agreement has the same meaning as provided in paragraph (1) of subdivision (b) of Section 2500.
(c)At the close of the solicitation period, the local agency shall review the submissions. The local agency may evaluate submissions based solely upon the information provided in each design-build entitys statement of qualifications. The local agency may also interview some or all of the design-build entities to further evaluate their qualifications for the project.
(d)Notwithstanding any other provision of this code, upon issuance of a contract award, the local agency shall publicly announce its award, identifying the design-build entity to which the award is made, along with a statement regarding the basis of the award. The statement regarding the local agencys contract award and the contract file shall provide sufficient information to satisfy an external audit.
22180.4.(a)The design-build entity shall provide payment and performance bonds for the project in the form and in the amount required by the local agency, and issued by a California admitted surety. The amount of the payment bond shall not be less than the amount of the performance bond.
(b)The design-build contract shall require errors and omissions insurance coverage for the design elements of the project.
(c)The local agency shall develop a standard form of payment and performance bond for its design-build projects.
22180.5.(a)After selecting a design-build entity based upon qualifications, the local agency may enter into a contract and direct the design-build entity to begin design and preconstruction activities sufficient to establish a guaranteed maximum price for the project.
(b)(1) Upon agreement of the guaranteed maximum price for the project, the local agency, at its sole and absolute discretion, may amend its contract with the design-build entity to contract for the remaining design, preconstruction, and construction activities sufficient to complete and close out the project, consistent with the guaranteed maximum price. In the event that there are unforeseen site conditions, the local agency may amend its contract with the design-build entity accordingly and consistent with the guaranteed maximum price, to enable the entity to complete the remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(2)If the cost for completing all remaining design, preconstruction, and construction activities sufficient to complete and close out the project exceed the guaranteed maximum price, the costs exceeding the guaranteed maximum price shall be the responsibility of the design-build entity. If the cost for these activities are less than the guaranteed maximum price, the design-build entity shall not be entitled to the difference between the cost and the guaranteed maximum price unless there is a prior written agreement concerning the sharing of these funds. For purposes of this section, cost shall include the design-build entitys direct costs, general conditions, overhead, and fee.
(c)(1) If the local agency and the design-build entity do not reach agreement on a guaranteed maximum price, or the local agency otherwise elects not to amend the design-build entitys contract to complete the remaining work, the local agency may solicit proposals to complete the project from firms that submitted statements of qualifications pursuant to Section 22180.3. The local agency may also, upon written determination that it is in the best interest of the city, county, city and county, or special district, as applicable, to do so, formally solicit proposals from other design-build entities, and contract award shall be made on a best value basis.
(2)The design professionals responsible for performing design services on behalf of a design-build entity that has been replaced pursuant to paragraph (1) shall have sole liability for their design errors and omissions, provided the local agency elects to use their complete and stamped designs with subsequent design-build entities or licensed contractors.
22180.6.(a)The local agency, in each design-build request for qualifications, may identify specific types of subcontractors that shall be included in the design-build entitys statement of qualifications. All construction subcontractors that are identified in the statement of qualifications shall be afforded the protections of Chapter 4 (commencing with Section 4100) of Part 1.
(b)Following award of the design-build contract, except for those construction subcontractors listed in the statement of qualifications, the design-build entity shall proceed as listed in this subdivision in awarding construction subcontracts with a value exceeding one-half of 1 percent of the contract price allocable to construction work for projects with a contract value greater than or equal to ten million dollars ($10,000,000).
(1)Provide public notice of availability of work to be subcontracted in accordance with the publication requirements applicable to the competitive bidding process of the local agency, including a fixed date and time on which qualifications statements, bids, or proposals will be due.
(2)Establish reasonable qualification criteria and standards.
(3)Award the subcontract on a best value basis. The process may include prequalification or short-listing.
(c)Subcontractors awarded construction subcontracts under this subdivision shall be afforded all the protections of Chapter 4 (commencing with Section 4100) of Part 1.
(d)A construction subcontractor licensed pursuant to Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code that provides design services used on a project authorized by this chapter shall not be subject to any liability arising from their design if the construction subcontract for that design is not performed by that subcontractor.
22180.7.(a)If the local agency elects to award a project pursuant to this chapter, retention proceeds withheld by the local agency from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation. Work performed to establish the guaranteed maximum price shall not be subject to retention.
(b)In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld shall not exceed the percentage specified in the contract between the local agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, before or at the time the bid is requested, that a bond may be required, and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the local agency and the design-build entity from any payment made by the design-build entity to the subcontractor.
22180.8.(a)Notwithstanding Section 10231.5 of the Government Code, no later than January 1, 2028, a local agency that uses the progressive design-build process pursuant to this chapter shall submit to the appropriate policy and fiscal committees of the Legislature a report on the use of the progressive design-build process.
(b)The report shall include, but is not limited to, the following information:
(1)A description of the project or projects awarded using the progressive design-build process.
(2)The contract award amounts.
(3)The design-build entities awarded the project or projects.
(4)A description of any written protests concerning any aspect of the solicitation, bid, or award of the contracts, including the resolution of the protests.
(5)A description of the prequalification process.
(6)The number of specialty subcontractors listed by construction trade type, on each project, that provided design services, but did not meet the target price for their scope of work, and therefore did not perform construction services on that project.
(7)Whether or not any portion of a design prepared by the specialty subcontractor that did not perform the construction work for that design was used by the local agency.
(8)The number of specialty subcontractors listed by construction trade type, on each project, that meet the definition of a small business, as specified in paragraph (1) of subdivision (d) of Section 14837 of the Government Code.
(9)The number of specialty subcontractors listed by construction trade type, on each project, that meet the definition of a microbusiness, as specified in paragraph (2) of subdivision (d) of Section 14837 of the Government Code.
(10)If a project awarded under this chapter has been completed, an assessment of the project performance, including, but not limited to, a summary of any delays or cost increases.
(c)The report submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
22180.9.The authorization to use the progressive design-build contracting process pursuant to this chapter does not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system. Construction inspection services for those projects shall be performed by the Department of Transportation pursuant to Part 5 (commencing with Section 14000) of Division 3 of Title 2 of the Government Code, consistent with Section 91.2 of the Streets and Highways Code.
22180.10.Nothing in this chapter affects, expands, alters, or limits any rights or remedies otherwise available at law.
22180.11.This chapter shall remain in effect only until January 1, 2029, and as of that date is repealed.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this chapter, the following definitions apply:
(a)(1) Best value means a value determined by evaluation of objective criteria that may include, but are not limited to, price, features, function, life-cycle costs, experience, and past performance.
(2)A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and the objectives of the project.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services, as needed, pursuant to a design-build contract.
(d)Design-build project means a project using the progressive design-build construction procurement process described in this chapter.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Guaranteed maximum price means the maximum payment amount agreed upon by the local agency and the design-build entity for the design-build entity to finish all remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(g)Local agency means any of the following:
(1)A transit district, included transit district, municipal operator, included municipal operator, or a consolidated agency, as described in Section 132353.1 of the Public Utilities Code.
(2)A joint powers authority formed to provide transit service, or a county transportation commission created pursuant to Section 130050, 130050.1, or 130050.2 of the Public Utilities Code.
(3)A regional transportation agency, as defined in subdivision (i) of Section 6820.
(4)A local or regional agency responsible for the construction of transit projects.
(h)Progressive design-build means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
(i)Qualifications-based selection means the process by which the local agency solicits for services from the design-build entities and that price is not the sole factor as the basis of award.
22180.1.A local agency may procure progressive design-build contracts and use the progressive design-build contracting process described in this chapter for up to 10 public works projects in excess of five million dollars ($5,000,000) for each project.
22180.2.A local agency entering into design-build contracts authorized under this chapter shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the local agency relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team.
22180.3.The procurement process for progressive design-build projects shall progress as follows:
(a)The local agency shall prepare and issue a request for qualifications in order to select a design-build entity to execute the project. The request for qualifications shall include, but is not limited to, the following elements:
(1)Documentation of the size, type, and desired design character of the project and any other information deemed necessary to describe adequately the local agencys needs, including the expected cost range, the methodology that will be used by the local agency to evaluate the design-build entitys qualifications, the procedure for final selection of the design-build entity, and any other information deemed necessary by the local agency to inform interested parties of the contracting opportunity.
(2)Significant factors that the local agency reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, and all other nonprice-related factors. The local agency may require that a preliminary cost estimate be included in the design-build entities responses and consider those costs in evaluating the statements of qualifications.
(3)The relative importance or the weight assigned to each of the factors identified in the request for qualifications.
(4)A standard template request for statements of qualifications prepared by the local agency. In preparing the standard template, the local agency may consult with the construction industry, the building trades and surety industry, and other local agencies interested in using the authorization provided by this chapter. The template shall require the following information:
(A)If the design-build entity is a privately held corporation, limited liability company, partnership, or joint venture, a listing of all of the entitys shareholders, partners, or members known at the time of the statement of qualification submission who will perform work on the project.
(B)Evidence that the members of the design-build team have completed, or have demonstrated the experience, competency, capability, and capacity to complete, projects of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the design-build entity has the capacity to complete the project.
(C)The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.
(D)Evidence that establishes that the design-build entity has the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.
(E)Information concerning workers compensation experience history and a worker safety program.
(F)If the proposed design-build entity is a corporation, limited liability company, partnership, joint venture, or other legal entity, a copy of the organizational documents or agreement committing to form the organization.
(G)An acceptable safety record. A proposers safety record shall be deemed acceptable if its experience modification rate for the most recent three-year period is an average of 1.00 or less, and its average total recordable injury or illness rate and average lost work rate for the most recent three-year period does not exceed the applicable statistical standards for its business category or if the proposer is a party to an alternative dispute resolution system as provided for in Section 3201.5 of the Labor Code.
(5)The information required under this subdivision shall be certified under penalty of perjury by the design-build entity and its general partners or joint venture members.
(b)(1) A design-build entity shall not be evaluated for selection unless the entity provides an enforceable commitment to the local agency that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.
(2)This subdivision shall not apply if one or more of the following requirements are met:
(A)The local agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project or contract to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(B)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the local agency before January 1, 2023.
(C)The entity has entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project or contract to use a skilled and trained workforce.
(3)For purposes of this subdivision, project labor agreement has the same meaning as provided in paragraph (1) of subdivision (b) of Section 2500.
(c)At the close of the solicitation period, the local agency shall review the submissions. The local agency may evaluate submissions based solely upon the information provided in each design-build entitys statement of qualifications. The local agency may also interview some or all of the design-build entities to further evaluate their qualifications for the project.
(d)Notwithstanding any other provision of this code, upon issuance of a contract award, the local agency shall publicly announce its award, identifying the design-build entity to which the award is made, along with a statement regarding the basis of the award. The statement regarding the local agencys contract award and the contract file shall provide sufficient information to satisfy an external audit.
22180.4.(a)The design-build entity shall provide payment and performance bonds for the project in the form and in the amount required by the local agency, and issued by a California admitted surety. The amount of the payment bond shall not be less than the amount of the performance bond.
(b)The design-build contract shall require errors and omissions insurance coverage for the design elements of the project.
(c)The local agency shall develop a standard form of payment and performance bond for its design-build projects.
22180.5.(a)After selecting a design-build entity based upon qualifications, the local agency may enter into a contract and direct the design-build entity to begin design and preconstruction activities sufficient to establish a guaranteed maximum price for the project.
(b)(1) Upon agreement of the guaranteed maximum price for the project, the local agency, at its sole and absolute discretion, may amend its contract with the design-build entity to contract for the remaining design, preconstruction, and construction activities sufficient to complete and close out the project, consistent with the guaranteed maximum price. In the event that there are unforeseen site conditions, the local agency may amend its contract with the design-build entity accordingly and consistent with the guaranteed maximum price, to enable the entity to complete the remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(2)If the cost for completing all remaining design, preconstruction, and construction activities sufficient to complete and close out the project exceed the guaranteed maximum price, the costs exceeding the guaranteed maximum price shall be the responsibility of the design-build entity. If the cost for these activities are less than the guaranteed maximum price, the design-build entity shall not be entitled to the difference between the cost and the guaranteed maximum price unless there is a prior written agreement concerning the sharing of these funds. For purposes of this section, cost shall include the design-build entitys direct costs, general conditions, overhead, and fee.
(c)(1) If the local agency and the design-build entity do not reach agreement on a guaranteed maximum price, or the local agency otherwise elects not to amend the design-build entitys contract to complete the remaining work, the local agency may solicit proposals to complete the project from firms that submitted statements of qualifications pursuant to Section 22180.3. The local agency may also, upon written determination that it is in the best interest of the city, county, city and county, or special district, as applicable, to do so, formally solicit proposals from other design-build entities, and contract award shall be made on a best value basis.
(2)The design professionals responsible for performing design services on behalf of a design-build entity that has been replaced pursuant to paragraph (1) shall have sole liability for their design errors and omissions, provided the local agency elects to use their complete and stamped designs with subsequent design-build entities or licensed contractors.
22180.6.(a)The local agency, in each design-build request for qualifications, may identify specific types of subcontractors that shall be included in the design-build entitys statement of qualifications. All construction subcontractors that are identified in the statement of qualifications shall be afforded the protections of Chapter 4 (commencing with Section 4100) of Part 1.
(b)Following award of the design-build contract, except for those construction subcontractors listed in the statement of qualifications, the design-build entity shall proceed as listed in this subdivision in awarding construction subcontracts with a value exceeding one-half of 1 percent of the contract price allocable to construction work for projects with a contract value greater than or equal to ten million dollars ($10,000,000).
(1)Provide public notice of availability of work to be subcontracted in accordance with the publication requirements applicable to the competitive bidding process of the local agency, including a fixed date and time on which qualifications statements, bids, or proposals will be due.
(2)Establish reasonable qualification criteria and standards.
(3)Award the subcontract on a best value basis. The process may include prequalification or short-listing.
(c)Subcontractors awarded construction subcontracts under this subdivision shall be afforded all the protections of Chapter 4 (commencing with Section 4100) of Part 1.
(d)A construction subcontractor licensed pursuant to Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code that provides design services used on a project authorized by this chapter shall not be subject to any liability arising from their design if the construction subcontract for that design is not performed by that subcontractor.
22180.7.(a)If the local agency elects to award a project pursuant to this chapter, retention proceeds withheld by the local agency from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation. Work performed to establish the guaranteed maximum price shall not be subject to retention.
(b)In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld shall not exceed the percentage specified in the contract between the local agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, before or at the time the bid is requested, that a bond may be required, and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the local agency and the design-build entity from any payment made by the design-build entity to the subcontractor.
22180.8.(a)Notwithstanding Section 10231.5 of the Government Code, no later than January 1, 2028, a local agency that uses the progressive design-build process pursuant to this chapter shall submit to the appropriate policy and fiscal committees of the Legislature a report on the use of the progressive design-build process.
(b)The report shall include, but is not limited to, the following information:
(1)A description of the project or projects awarded using the progressive design-build process.
(2)The contract award amounts.
(3)The design-build entities awarded the project or projects.
(4)A description of any written protests concerning any aspect of the solicitation, bid, or award of the contracts, including the resolution of the protests.
(5)A description of the prequalification process.
(6)The number of specialty subcontractors listed by construction trade type, on each project, that provided design services, but did not meet the target price for their scope of work, and therefore did not perform construction services on that project.
(7)Whether or not any portion of a design prepared by the specialty subcontractor that did not perform the construction work for that design was used by the local agency.
(8)The number of specialty subcontractors listed by construction trade type, on each project, that meet the definition of a small business, as specified in paragraph (1) of subdivision (d) of Section 14837 of the Government Code.
(9)The number of specialty subcontractors listed by construction trade type, on each project, that meet the definition of a microbusiness, as specified in paragraph (2) of subdivision (d) of Section 14837 of the Government Code.
(10)If a project awarded under this chapter has been completed, an assessment of the project performance, including, but not limited to, a summary of any delays or cost increases.
(c)The report submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
22180.9.The authorization to use the progressive design-build contracting process pursuant to this chapter does not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system. Construction inspection services for those projects shall be performed by the Department of Transportation pursuant to Part 5 (commencing with Section 14000) of Division 3 of Title 2 of the Government Code, consistent with Section 91.2 of the Streets and Highways Code.
22180.10.Nothing in this chapter affects, expands, alters, or limits any rights or remedies otherwise available at law.
22180.11.This chapter shall remain in effect only until January 1, 2029, and as of that date is repealed.
SECTION 1.The heading of Chapter 4.1 (commencing with Section 22170) of Part 3 of Division 2 of the Public Contract Code is amended to read:4.1.Progressive Design-Build ContractingSEC. 2.Section 22170 of the Public Contract Code is amended to read:22170.For purposes of this chapter, the following definitions apply:(a)(1)Best value means a value determined by evaluation of objective criteria that may include, but are not limited to, price, features, function, life-cycle costs, experience, and past performance.(2)A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and the objectives of the project.(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.(c)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.(d)Design-build project means a project using the progressive design-build construction procurement process described in this chapter.(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.(f)Guaranteed maximum price means the maximum payment amount agreed upon by the local agency and the design-build entity for the design-build entity to finish all remaining design, preconstruction, and construction activities sufficient to complete and close out the project.(g)Local agency means any of the following:(1)A city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source.(2)A transit district, included transit district, municipal operator, included municipal operator, or a consolidated agency, as described in Section 132353.1 of the Public Utilities Code.(3)A joint powers authority formed to provide transit service, or a county transportation commission created pursuant to Section 130050, 130050.1, or 130050.2 of the Public Utilities Code.(4)A regional transportation agency, as defined in subdivision (i) of Section 6820.(5)A local or regional agency responsible for the construction of transit projects.(h)Progressive design-build means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.(i)Qualifications-based selection means the process by which the local agency solicits for services from the design-build entities and that price is not the sole factor as the basis of award.SEC. 3.Section 22172.6 is added to the Public Contract Code, to read:22172.6.The progressive design-build authorization under this chapter shall not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system, which shall be performed by the Department of Transportation as established under Part 5 (commencing with Section 14000) of Division 3 of Title 2 of the Government Code, consistent with Section 91.2 of the Streets and Highway Code.SEC. 4.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this chapter, the following definitions apply:
(a)(1)Best value means a value determined by evaluation of objective criteria that may include, but are not limited to, price, features, function, life-cycle costs, experience, and past performance.
(2)A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and the objectives of the project.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
(d)Design-build project means any a project that treats, pumps, stores, or conveys water, wastewater, recycled water, advanced treated water, or supporting facilities using the progressive design-build construction procurement process described in this chapter.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Guaranteed maximum price means the maximum payment amount agreed upon by the local agency and the design-build entity for the design-build entity to finish all remaining design, preconstruction, and construction activities sufficient to complete and close out the project.
(g)Local agency means a city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source. any of the following:
(1)A city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source.
(2)A transit district, included transit district, municipal operator, included municipal operator, or a consolidated agency, as described in Section 132353.1 of the Public Utilities Code.
(3)A joint powers authority formed to provide transit service, or a county transportation commission created pursuant to Section 130050, 130050.1, or 130050.2 of the Public Utilities Code.
(4)A regional transportation agency, as defined in subdivision (i) of Section 6820.
(5)A local or regional agency responsible for the construction of transit projects.
(h)Progressive design-build means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
(i)Qualifications-based selection means the process by which the local agency solicits for services from the design-build entities and that price is not the sole factor as the basis of award.
SEC. 3.Section 22172.6 is added to the Public Contract Code, to read:22172.6.The progressive design-build authorization under this chapter shall not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system, which shall be performed by the Department of Transportation as established under Part 5 (commencing with Section 14000) of Division 3 of Title 2 of the Government Code, consistent with Section 91.2 of the Streets and Highway Code.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 6821 of the Public Contract Code is amended to read:6821.(a)The department may utilize the design-build method of procurement for up to 10 projects, and an additional 6 projects per fiscal year in the 202223 and 202324 fiscal years, on the state highway system, based on either best value or lowest responsible bid.(b)A regional transportation agency may utilize the design-build method of procurement, including progressive design-build procurement, to design and construct projects on or adjacent to the state highway system, including related nonhighway portions of the project, based on either best value or lowest responsible bid. A regional transportation agency and the department shall enter into a cooperative agreement reflecting the roles and responsibilities assigned by law for a project on or interfacing with the state highway system authorized under this subdivision. The cooperative agreement shall also include the requirement to develop a mutually agreed upon issue resolution process with a primary objective to ensure the project stays on schedule and issues between the parties are resolved in a timely manner.(c)(1)A regional transportation agency may utilize the design-build method of procurement, including progressive design-build procurement, based on either best value or lowest responsible bid, to design and construct projects on expressways that are not on the state highway system if the projects are developed in accordance with an expenditure plan approved by voters as of January 1, 2014.(2)The entity responsible for the maintenance of the local streets and roads within the jurisdiction of the expressway shall be responsible for the maintenance of the expressway.(d)A city, county, or city and county shall not utilize the design-build method of procurement under this chapter. A regional transportation agency shall not utilize the design-build method of procurement on behalf of a city, county, or city and county.(e)The design-build authorization in subdivisions (a) and (b) shall not include the authority to perform construction inspection services for projects on or interfacing with the state highway system, which shall be performed by the department consistent with Section 91.2 of the Streets and Highway Code.(f)(1)Not later than the first day of July that occurs two years after a design-build contract is awarded, and each July 1 thereafter until a project is completed, the department or the regional transportation agency shall submit a report on the progress of the project and compliance with this section to the legislative policy committees having jurisdiction over transportation matters.(2)The requirement of submitting a report imposed under paragraph (1) is inoperative on the first day of July four years after the first report was submitted, pursuant to Section 10231.5 of the Government Code.(3)A report to be submitted pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.(g)For purposes of this section, progressive design-build procurement means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.(a)The department may utilize the design-build method of procurement for up to 10 projects, and an additional 6 projects per fiscal year in the 202223 and 202324 fiscal years, on the state highway system, based on either best value or lowest responsible bid.
(b)A regional transportation agency may utilize the design-build method of procurement procurement, including progressive design-build procurement, to design and construct projects on or adjacent to the state highway system, including related nonhighway portions of the project, based on either best value or lowest responsible bid. A regional transportation agency and the department shall enter into a cooperative agreement reflecting the roles and responsibilities assigned by law for a project on or interfacing with the state highway system authorized under this subdivision. The cooperative agreement shall also include the requirement to develop a mutually agreed upon issue resolution process with a primary objective to ensure the project stays on schedule and issues between the parties are resolved in a timely manner.
(c)(1)A regional transportation agency may utilize the design-build method of procurement, procurement, including progressive design-build procurement, based on either best value or lowest responsible bid, to design and construct projects on expressways that are not on the state highway system if the projects are developed in accordance with an expenditure plan approved by voters as of January 1, 2014.
(2)The entity responsible for the maintenance of the local streets and roads within the jurisdiction of the expressway shall be responsible for the maintenance of the expressway.
(d)A city, county, or city and county shall not utilize the design-build method of procurement under this chapter. A regional transportation agency shall not utilize the design-build method of procurement on behalf of a city, county, or city and county.
(e)The design-build authorization in subdivisions (a) and (b) shall not include the authority to perform construction inspection services for projects on or interfacing with the state highway system, which shall be performed by the department consistent with Section 91.2 of the Streets and Highway Code.
(f)(1)Not later than the first day of July that occurs two years after a design-build contract is awarded, and each July 1 thereafter until a project is completed, the department or the regional transportation agency shall submit a report on the progress of the project and compliance with this section to the legislative policy committees having jurisdiction over transportation matters.
(2)The requirement of submitting a report imposed under paragraph (1) is inoperative on the first day of July four years after the first report was submitted, pursuant to Section 10231.5 of the Government Code.
(3)A report to be submitted pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(g)For purposes of this section, progressive design-build procurement means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
|
Date
|
Status
|
|---|---|
| Oct 4, 2023 | Chaptered by Secretary of State. Chapter 310, Statutes of 2023. |
| Oct 4, 2023 | Approved by the Governor. |
| Sep 7, 2023 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 1, 2023 | Assembly amendments concurred in. (Ayes 37. Noes 0. Page 2240.) Ordered to engrossing and enrolling. |
| Aug 29, 2023 | Ordered to special consent calendar. |
| Aug 24, 2023 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 24, 2023 | Read third time. Passed. (Ayes 73. Noes 0. Page 2802.) Ordered to the Senate. |
| Aug 17, 2023 | Read second time. Ordered to consent calendar. |
| Aug 16, 2023 | From committee: Do pass. Ordered to consent calendar. (Ayes 15. Noes 0.) (August 16). |
| Jun 28, 2023 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 27, 2023 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 0.) (June 21). |
| May 11, 2023 | Referred to Com. on L. GOV. |
| May 1, 2023 | In Assembly. Read first time. Held at Desk. |
| May 1, 2023 | Read third time. Passed. (Ayes 37. Noes 0. Page 962.) Ordered to the Assembly. |
| Apr 25, 2023 | Read second time. Ordered to consent calendar. |
| Apr 24, 2023 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Apr 14, 2023 | Set for hearing April 24. |
| Apr 12, 2023 | From committee: Do pass and re-refer to Com. on APPR with recommendation: To consent calendar. (Ayes 16. Noes 0. Page 689.) (April 11). Re-referred to Com. on APPR. |
| Mar 30, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on TRANS. |
| Mar 28, 2023 | Set for hearing April 11. |
| Feb 22, 2023 | Referred to Com. on TRANS. |
| Feb 16, 2023 | From printer. May be acted upon on or after March 18. |
| Feb 15, 2023 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 1, 2023 | Special Consent SB617 Newman | Senate Floor |
Passed |
|
| Aug 24, 2023 | SB 617 Newman Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Aug 16, 2023 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 21, 2023 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Local Government |
Passed |
|
| May 1, 2023 | Consent Calendar SB617 Newman | Senate Floor |
Passed |
|
| Apr 11, 2023 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Transportation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Aaron Read & Associates | * Neutral | Jun 21, 2023 |
| American Society Of Civil EngineersRegion 9 | ** Support | |
| Associated General Contractors Of California | ** Support | |
| California Association Of Councils Of Governments | ** Support | |
| California Special Districts Association | ** Support | |
| California Transit Association | ** Support | |
| City of Belmont | * Support | Jun 21, 2023 |
| Foothill Transit | ** Support | |
| Orange County Transportation Authority | ** Support | |
| Riverside County Transportation Commission | ** Support | |
| San Diego Metropolitan Transit System | ** Support | |
| San Gabriel Valley Council Of Governments | ** Support | |
| Self-Help Counties Coalition | ** Support | |
| Southern California Regional Rail Authority | ** Support | |
| Southern California Regional Rail Authority dba Metrolink | ** Support | |
| Transportation Agency For Monterey County | ** Support | |
| Transportation California | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 617 |
UNFINISHED BUSINESS
Bill No: SB 617
Author: Newman (D)
Amended: 6/28/23
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 16-0, 4/11/23
AYES: Gonzalez, Niello, Allen, Archuleta, Becker, Blakespear, Cortese, Dahle, Dodd, Limón, McGuire, Newman, Nguyen, Seyarto, Umberg, Wahab
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 37-0, 5/1/23 (Consent)
AYES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener
NO VOTE RECORDED: Blakespear, Glazer, Wilk
ASSEMBLY FLOOR: 73-0, 8/24/23 (Consent) - See last page for vote
SUBJECT: Public contracts: progressive design-build: local and regional agencies: transit
SOURCE: Self-Help Counties Coalition
DIGEST:
This bill authorizes transit agencies, as specified, and regional transportation planning agencies (RTPA), as specified, to utilize progressive design-build procurement method, through January 1, 2029.
Assembly Amendments
recast provisions to change the number of projects authorized for transportation agencies to utilize progressive design-build procurement from 15 projects to 10 projects.
ANALYSIS:
Existing law:
- Authorizes, until January 1, 2029, local agencies, defined as any city, county, city and county, or special district that provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process, as specified, for up to 15 public works projects each over $5 million. Outlines the process and additional parameters for the use of this procurement method.
- Defines “progressive design-build” as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
- Authorizes, until January 1, 2034, The California Department of Transportation (Caltrans) and the Department of Water Resources (DWR), to use progressive design-build for eight projects with an estimated contract price that exceeds $25 million. Prohibits DWR from using progressive design-build for the design or construction of Delta conveyance facilities or seawater desalination projects.
- Authorizes, until January 1, 2025, the Department of General Services, the Department of Corrections and Rehabilitation, transit agencies, and local agencies, as defined, to use the design-build procurement process for specified public works projects.
- Authorizes Caltrans to utilize design-build procurement for up to 10 projects on the state highway system, and an additional six projects per fiscal year in the 2022-23 and 2023-24 fiscal years, based on either best value or lowest responsible bid, and sunsets this authority on January 1, 2034.
- Authorizes RTPAs to utilize design-build procurement for an unlimited number of projects on or adjacent to the state highway system and expressways and sunsets this authority on January 1, 2034.
- Requires Caltrans or its consultants perform construction inspection services for any design-build project on or where a project interfaces with the state highway system and sunsets this authority on January 1, 2034.
This bill:
- Recasts provisions of existing progressive design-build authorization to create a new, nearly identical, Transit Progressive Design-Build Contracting authorization for transportation agencies.
- Authorizes, until January 1, 2029, a “local agency,” defined as a transit district, municipal operator, consolidated agency, joint powers authority, county transportation commission, regional transportation agency, or local or regional agency, to procure progressive design-build contracts and use the progressive design-build contracting process for up to 10 public works projects, each in excess of $5 million. Outlines the process and additional parameters for the use of this procurement method.
- Defines “progressive design-build” as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
- Defines “design-build project” to mean any project using the progressive design-build construction procurement process, as specified.
- Stipulates that the progressive design-build authorization included in this bill does not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system.
- Requires, no later than January 1, 2028, a local agency that uses the progressive design-build process to submit a report to the appropriate policy and fiscal committees of the Legislature on the use of the progressive design-build process and specifies the contents of that report.
Comments
- Purpose of the bill. According to the author, “As the federal government prepares to disburse the largest federal infrastructure investment in over a generation under the Infrastructure Investment and Jobs Act, it is incumbent that California grant transportation agencies the necessary flexibility to utilize an alternative contracting method which reduces risk, stretches taxpayer dollars, and renders projects more competitive in qualifying for federal funding. The passage of SB 617 will grant transportation agencies the choice of using the PDB contracting method on capital projects where agencies deem it most appropriate.”
- What is Design-Build? Design-build refers to a procurement and project delivery method in which both the design and construction of a project are procured from a single entity. Design-build differs from the traditional design-bid-build contracting method whereby work on a project is divided into two separate phases: design and construction. Under design-bid-build, the sponsoring government agency is responsible for the design of the project, either by designing the project itself or by contracting with a private entity to do so. When designs are completed, the agency solicits bids from the construction industry and hires the responsible low bidder to build the project. Design-build combines these two phases into a single, comprehensive contract. Design–build is used to minimize risks for the project sponsor and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.
- Design-Build for transportation projects in California. For over 10 years, California’s transportation agencies have had the ability to utilize the design-build procurement method, with some restrictions. Specifically, SB 4 (Cogdill, Chapter 2, Statutes of 2009 Second Extraordinary Session), authorized Caltrans to utilize design-build procurement for 10 state highway, bridge, or tunnel projects. Additionally, it authorized local transportation agencies to utilize design-build on five local street or road projects within the jurisdiction of the agency, if approved by the California Transportation Commission (CTC).
To continue the use of design-build, the Legislature approved AB 401 (Daly, Chapter 586, Statutes of 2013), which authorized Caltrans to use design-build procurement for an additional 10 projects on the state highway system, and provided RTPAs with unlimited authority to use design-build procurement for projects on or adjacent to the state highway system and expressways. AB 401 also assigned Caltrans the responsibility to oversee the construction inspection of projects on or interfacing with the state highway system. AB 1499 (Daly, Chapter 212, Statutes of 2021), further extended this authority for both Caltrans and RTPAs until January 1, 2034.
Transit agencies, along with other state and local agencies, and special districts, have authorization, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services. In 2014, the Legislature consolidated various provisions authorizing design-build for various state and local agencies into consistent, generally-applicable statutes by approving SB 785 (Wolk, Chapter 931, Statutes of 2014).
- What is Progressive Design-Build? Progressive design-build is a more recent variant on traditional design-build contracting. The progressive design-build model generally includes two phases. In the first phase, the sponsoring government agency uses a best value process to select a design-build entity who completes preliminary plans and preconstruction services necessary to provide a cost estimate and final design proposal. The project then “progresses” to the second phase of the project, where the sponsoring agency and the design-build entity agree to a final design, project cost, and schedule. If they cannot agree, there is an “off ramp” between the two phases where the sponsoring agency can pursue other options, but still benefit from having the first phase work complete. This is different from traditional design-build where the awarding entity contracts with a single entity to design and construct a project at a set price before design work begins, and without a similar off ramp.
AB 137 (Committee on Budget, Chapter 77, Statutes of 2021), gave some state agencies, not Caltrans, the authority to use progressive design-build with Department of Finance and the State Public Works Board approval. More recently, in July 2023, as part of the Governor’s infrastructure package, the Legislature approved SB 146 (Gonzalez, Chapter 58, Statutes of 2023), which authorized Caltrans and DWR, through January 1, 2034, to use progressive design-build for eight projects with an estimated contract price that exceeds $25 million.
Additionally, last year, the Legislature authorized the use of progressive design-build for certain local agencies for the delivery of water projects. Specifically, SB 991 (Newman, Chapter 243, Statutes of 2022), authorized, until January 1, 2029, local agencies that provide for the production, storage, supply, treatment, or distribution of water to use progressive design-build for up to 15 specified water projects each over $5 million. The bill outlined the progressive design-build procurement process that eligible local agencies must use:
- The local agency must prepare a request for qualifications to select a design-build entity to complete the project with specified information;
- At the close of the solicitation period, the local agency must review the submissions based solely upon the information provided in the statement of qualifications. The local agency may also interview any of the design-build entities;
- Upon issuing a contract award, the local agency must publicly announce the award, the design-build entity, and the basis for the award;
- The local agency must develop guidelines to prevent conflicts of interest; and,
- The local agency must develop a standard form of payment and performance bond for its design-build projects.
After selecting a design-build entity, the local agency can enter into a contract to begin design and preconstruction activities to establish a guaranteed maximum price for the project. Once the local agency has agreed to a guaranteed maximum price with the design-build entity, it has the sole discretion to amend the contract as necessary to complete the project. In the event of unforeseen site conditions, the local agency can amend its contract with the design-build entity. If the costs for completing the project exceed the guaranteed maximum price, these excess costs become the design-build entity’s responsibility. If the cost for these activities are less than the guaranteed maximum price, the design-build entity is not entitled to the difference unless there is prior written agreement concerning the sharing of these funds. If the local agency and the design-build entity do not reach agreement on a guaranteed maximum price, or the local agency otherwise elects not to amend the design-build entity’s contract to complete the remaining work, the local agency can solicit proposals to complete the project from other entities.
SB 991 also required that local agencies who use this progressive design-build authority to, no later than January 1, 2028, submit a report to the Legislature on the use of the methodology. This report must include specified information on these projects, the bidding process, subcontractors used, and assess the project’s performance.
- Expanding Progressive Design-Build authority to local transportation agencies. This bill expands the existing authority for progressive design-build for the delivery of water projects to transportation agencies for any type of project. Specifically, this bill creates a new, nearly identical, progressive design-build statute for transportation agencies and authorizes all RTPAs and transit agencies, as defined, to use progressive design-build for up to 10 projects over $5 million each. As SB 991 only went into effect on January 1, 2023, it does not appear that any local agency has had the opportunity to use the authority. A report is not due to the Legislature until 2028 for review prior to possibly extending the authorization past 2029. Is it too soon to extend the authority to transportation agencies? Is it needed?
As noted by the author, the recent passage of the Infrastructure Investment and Jobs Act (IIJA, P.L. 117-58), authorizes $567 billion in spending through FY 2026 for federal transportation programs to support highway, transit, and rail investments. California is expected to receive roughly $42 billion in formula funds alone. An additional $100 billion is available for transportation capital projects in the form of competitive grants. This historic funding provides significant opportunities for California’s RTPAs and transit agencies. Supporters of this bill contends that under design-build, significant project savings have been realized, and that the use of progressive design-build will provide “another tool in the tool box” that public agencies can use to deliver needed projects.
Related/Prior Legislation
SB 706 (Caballero, 2023) authorizes cities, counties, and special districts to use progressive design-build for any project. The bill would require a report to the Legislature by December 31, 2028. The bill is pending in the Senate Floor.
AB 400 (Rubio, 2023) eliminates the sunset of January 1, 2025, for the authorization for the Department of General Services, the Department of Corrections and Rehabilitation, and local agencies, as defined, to use the design-build procurement process for specified public works. The bill is pending in the Assembly Local Government Committee.
SB 198 (Committee on Budget and Fiscal Review, Chapter 71, Statutes of 2022) authorized Caltrans to utilize design-build method of procurement for an additional six projects per fiscal year for the 2022-23 and 2023-24 fiscal years.
SB 991 (Newman, Chapter 243, Statutes of 2022) authorized local agencies that provide water service to use progressive design-build for 15 projects over $5 million each.
AB 137 (Committee on Budget, Chapter 77, Statutes of 2021) authorized some state agencies the authority to use progressive design-build, up to three public works projects, with Department of Finance and the State Public Works Board approval.
AB 1499 (Daly, Chapter 212, Statutes of 2021) extended the sunset date from January 1, 2024 to January 1, 2034 for Caltrans and RTPAs to use the design-build procurement method for transportation projects in California.
SB 785 (Wolk, Chapter 931, Statutes of 2014) authorized, until January 1, 2025, the Department of General Services, the Department of Corrections and Rehabilitation, and local agencies, as defined, to use the design-build procurement process for specified public works.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
- No state costs. This bill authorizes, but does not require, local transportation-related agencies to use the progressive design-build process. Costs incurred in its use are not reimbursable by the state.
- Potential local savings to the extent the use of the progressive design-build process results in project cost reductions relative to other available procurement methods.
SUPPORT: (Verified 8/24/23)
Self-Help Counties Coalition (source)
American Society of Civil Engineers-Region 9
Associated General Contractors of California
California Association of Councils of Governments
California Special Districts Association
California Transit Association
Foothill Transit
Orange County Transportation Authority
Riverside County Transportation Commission
San Diego Metropolitan Transit System
Southern California Regional Rail Authority dba Metrolink
Transportation Agency for Monterey County
Transportation California
OPPOSITION: (Verified 8/24/23)
None received
ARGUMENTS IN SUPPORT: Writing in support, Transportation California notes, “The flexibility that progressive design-build authority provides will ensure that our transportation agencies will have a contracting method that has been demonstrated to reduce risk, maintain or reduce delivery timelines and most importantly, give California projects a better qualifying opportunity to compete for federal funding.”
ASSEMBLY FLOOR: 73-0, 8/24/23
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Vince Fong, Friedman, Gabriel, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Kalra, Lackey, Lee, Low, Lowenthal, Mathis, McCarty, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Weber, Wicks, Wilson, Wood, Zbur, Robert Rivas
NO VOTE RECORDED: Bonta, Gallagher, Garcia, Jones-Sawyer, Maienschein, McKinnor, Ward
Prepared by: Melissa White / TRANS. / (916) 651-4121
8/25/23 13:44:33
**** END ****
Date of Hearing: August 16, 2023
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Chris Holden, Chair
SBPCA Bill Id:SB 617
Author:(Newman) – As Amended Ver:June 28, 2023
Policy Committee: | Local Government | Vote: | 8 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill authorizes, until January 1, 2029, a transit district or transportation agency to use the progressive design-build process of project delivery for up to 10 public works projects in excess of $5 million. The bill also requires an agency that uses the progressive design-build process to submit a report on its use of the process to the Legislature by January 1, 2028.
Among its provisions, this bill:
- Allows a local agency, defined as a transit district, municipal operator, consolidated agency, joint powers authority, county transportation commission, regional transportation agency, or local or regional agency, to procure progressive design-build contracts and use the progressive design-build contracting process for up to 10 public works projects, each in excess of $5 million. Specifies this authority does not include inspection services for projects on, or interfacing with, the state highway system.
- Requires a local agency entering into a progressive design-build contract to develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the local agency relating to the solicitation of a design-build, to submit a proposal as a design-build entity, or to join a design-build team.
- Specifies guidelines and procedures for a local agency’s use of progressive design-build project delivery method.
- Requires, no later than January 1, 2028, a local agency that uses the progressive design-build process to submit a report to the appropriate policy and fiscal committees of the Legislature on the use of the progressive design-build process and specifies the contents of that report.
- Sunsets the bill’s provisions on January 1, 2029.
FISCAL EFFECT:
- No state costs. This bill authorizes, but does not require, local transportation-related agencies to use the progressive design-build process. Costs incurred in its use are not reimbursable by the state.
- Potential local savings to the extent the use of the progressive design-build process results in project cost reductions relative to other available procurement methods.
COMMENTS:
- Purpose. The author seeks to provide a more efficient option for investing in transportation infrastructure by authorizing local transit and transportation agencies to use the progressive design-build project delivery method. The recent passage of the federal Infrastructure Investment and Jobs Act authorizes $567 billion in spending through fiscal year 2026 for federal transportation programs to support highway, transit, and rail investments. The Newsome administration expects California to receive approximately $42 billion in formula funds. An additional $100 billion is available for transportation capital projects in the form of competitive grants. According to the author:
As the federal government prepares to disburse the largest federal infrastructure investment in over a generation, it is incumbent that California grant transportation agencies the necessary flexibility to utilize an alternative contracting method which reduces risk, stretches taxpayer dollars, and renders projects more competitive in qualifying for federal funding. The passage of [this bill] will grant transportation agencies the choice of using the progressive design-build contracting method on capital projects where agencies deem it most appropriate.
- Background. Most public agencies are required to use the “design-bid-build” contracting method to complete public works projects. Under this process, a public agency fully completes the design of a project prior to awarding a construction contract and must award the contract to the “lowest responsible bidder.” This process is intended to ensure the project is built for the lowest possible cost.
Under the “design-build” method, a single contract covers the design and construction of a project with a single company or consortium that acts as both the project designer and builder. The design-build entity arranges all architectural, engineering and construction services and is responsible for delivering the project at a guaranteed price and schedule based upon performance criteria set by the public agency. Local agencies, primarily water-related and healthcare districts, have statutory authority to use the design-build method in limited circumstances.
“Progressive design-build” is a stepped project delivery method where a qualified design-builder is retained early in the project for design and preconstruction activities. Generally, once the design is 40% to 60% complete, the public agency and design-builder negotiate a total maximum price and, if there is agreement, both parties proceed to the second phase of the project to complete project design and construction. If the public agency cannot come to terms with the design-builder, the public agency may use the design developed by the first design-builder, but enter into a new contract with another design-builder to complete the project.
AB 137 (Committee on Budget), Chapter 77, Statutes of 2021, authorized the Department of General Services (DGS) to use the progressive design-build process for the construction of up to three projects, and provided extensive parameters for its use. Last year’s SB 991 (Newman), Chapter 243, Statutes of 2022, authorized, until January 1, 2029, cities, counties, and special districts that provide production, storage, supply, treatment or distribution of water to use the progressive design-build process for up to 15 public works projects in excess of $5 million, similar to the progressive design-build process authorized for use by DGS. SB 991 also requires a local agency that uses the process to submit a report to the Legislature by January 1, 2028, containing specified information on the use of the process.
Similar to SB 991, this bill authorizes, until January 1, 2029, transit districts and transportation agencies to use the progressive design-build process for up to 10 public works projects in excess of $5 million and, if used, requires a report to the Legislature.
- Related Legislation. SB 706 (Caballero), until January 1, 2030, expands the authorization granted to cities, counties and special districts in SB 991 to use the progressive design-build process by allowing them to use the progressive design-build process for up to 10 public works projects of any type, not limited to water projects, in excess of $5 million. SB 706 is pending in this committee.
Analysis Prepared by: Jennifer Swenson / APPR. / (916) 319-2081
Date of Hearing: June 21, 2023
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
SBPCA Bill Id:SB 617
Author:(Newman) – As Amended Ver:March 30, 2023
SENATE VOTE: 37-0
SUBJECT: Public contracts: progressive design-build: local and regional agencies.
SUMMARY: Expands an existing authorization for local water agencies to use the progressive design-build method of project delivery for specified water projects to include transit and transportation agencies and any type of project. Specifically, this bill:
- Adds to the list of local agencies authorized to use progressive design-build (which existing law limits to a city, county, city and county, or special district authorized by law to provide for the production, storage, supply, treatment, or distribution of any water from any source) to also include the following agencies:
- A transit district, included transit district, municipal operator, included municipal operator, or a consolidated agency, as specified.
- A joint powers authority (JPA) formed to provide transit service, or a county transportation commission, as specified.
- A regional transportation agency, as specified.
- A local or regional agency responsible for the construction of transit projects.
- Alters the definition of “design-build project” to include any project using the progressive design-build construction procurement process (removing the limitation in existing law to a project that treats, pumps, stores, or conveys water, wastewater, recycled water, advanced treated water, or supporting facilities).
- Provides that the progressive design-build authorization under existing law and this bill shall not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system, which shall be performed by the Department of Transportation, as specified.
- Provides that no reimbursement is required by this bill pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this bill creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.
EXISTING LAW:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system. [Public Contract Code (PCC) §§ 20100 – 20929]
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process, as specified. (PCC §§ 22160 – 22169)
- Authorizes the Department of General Services (DGS) to use the progressive design-build procurement process for up to three public works projects, as specified. (PCC §§ 10198 – 10198.8)
- Authorizes, until January 1, 2029, a city, county, city and county, or special district authorized to provide for the production, storage, supply, treatment, or distribution of water to use progressive design-build for up to 15 specified water projects each over $5 million, and outlines the process and additional parameters for the use of this procurement method. (PCC §§ 22170 – 22174)
- Requires local agencies that use the progressive design-build authority described in 4), above, to submit a report on its use to the Legislature by January 1, 2028, as specified. (PCC § 22172.5)
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS:
- Design-Build in California Law. California’s Legislature began granting design-build authority in the early 1990's, and has typically done so with specified parameters, such as the duration of the authority, the types of agencies allowed to use it, the types of projects for which it can be used, cost thresholds, and specified procedures that must be followed in preparing and awarding contracts. Over the years, this resulted in a number of statutes in a variety of code sections, which created confusion for public agencies and contractors alike.
In an effort to consolidate these statutes, SB 785 (Wolk), Chapter 931, Statutes of 2014, repealed existing law authorizing the DGS, the Department of Corrections and Rehabilitation (CDCR), and local agencies to use the design-build procurement process, and enacted uniform provisions authorizing DGS, CDCR, and specified local agencies to utilize the design-build procurement process for specified public works projects (with some exceptions, notably design-build authority for CalTrans). SB 785 created one set of codes for DGS and CDCR, and a separate set for specified local agencies, but with similar parameters.
Since SB 785 was enacted, the Legislature has authorized numerous additional local agencies or types of local agencies to use SB 785 design-build authority for additional projects or types of projects.
- Design-Build for Local Agencies. The LAPC Act generally requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional approach to public works construction. However, California law also allows local agencies to use the design-build method, in which a single contract covers the design and construction of a project with a single company or consortium that acts as both the project designer and builder.
Existing law generally limits the use of design-build by counties and cities to the following types of projects:
- The construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities.
- Local and regional wastewater facilities, solid waste management facilities, or water recycling facilities (for cities and counties that operate such facilities).
Existing law expressly prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure (with some limited exceptions).
- Limits on Design-Build for Special Districts and Other Specified Agencies. Existing law also generally limits the use of design-build for special districts and a handful of other specified agencies by both type of district or agency and type of project. The agencies include: special districts that operate wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities; specified transit and transportation agencies; the San Diego Association of Governments (SANDAG); a few water agencies; and, healthcare districts.
For special districts that operate wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities, their use of design-build is limited to regional and local wastewater treatment facilities; regional and local solid waste facilities; regional and local water recycling facilities; and, fire protection facilities.
- Progressive Design-Build. Progressive design-build is a more recent variant on traditional design-build contracting. While there is some variation, the progressive design-build model generally includes two phases. In the first phase, the awarding authority uses a best value process to select a design-build entity that completes preliminary plans and preconstruction services necessary to provide a cost estimate and final design proposal. The project then “progresses” to the second phase, where the awarding authority and the design-build entity agree to a final design, project cost, and schedule. If they cannot agree, there is an “off ramp” between the two phases when the awarding authority can pursue other options, but still benefit from having the first phase of work complete. This is different from traditional design-build, where the awarding entity contracts with a single entity to design and construct a project at a set price before design work begins, and without a similar off ramp.
AB 137 (Committee on Budget), Chapter 77, Statutes of 2021, authorized the DGS to use the progressive design-build procurement process for up to three public works projects, and outlined extensive parameters for the department’s use of this procurement method. AB 2551 (Gallagher), Chapter 760, Statutes of 2016, authorized local agencies to use a number of alternative procurement methods, including progressive design-build, for any surface storage project that receives specified funding for water storage projects. Some charter cities have implemented their own progressive design-build process, relying on their Constitutional authority to control their own “municipal affairs.”
Last year, SB 991 (Newman), Chapter 243, Statutes of 2022, authorized a county, city, or special district that produces, stores, supplies, treats, or distributes water to use progressive design-build for up to 15 public works projects in excess of $5 million each that treat, pump, store, or convey water, wastewater, recycled water, advanced treated water, or supporting facilities. SB 991 outlined extensive requirements for the procurement process that must be followed, including provisions for the use of a skilled and trained workforce, protections for subcontractors, and other requirements. SB 991 required, no later than January 1, 2028, a local agency that uses the progressive design-build process authorized by the bill to submit a report to the Legislature on the use of the progressive design-build process, and specified the contents of that report. SB 991 sunsets on January 1, 2029.
- Bill Summary and Author’s Statement. This bill allows transit agencies and regional transportation planning agencies to use the progressive design-build authorization outlined in SB 991 by changing the definition of “local agency” in those statutes. This bill also changes the definition of “design-build project” in those statutes. It removes the existing limitation – projects that treat, pump, store, or convey water, wastewater, recycled water, advanced treated water, or supporting facilities – thereby allowing progressive design-build to be used for any type of project. This bill is sponsored by the Self-Help Counties Coalition.
According to the Author, “As the federal government prepares to disburse the largest federal infrastructure investment in over a generation under the Infrastructure Investment and Jobs Act, it is incumbent that California grant transportation agencies the necessary flexibility to utilize an alternative contracting method which reduces risk, stretches taxpayer dollars, and renders projects more competitive in qualifying for federal funding. The passage of SB 617 will grant transportation agencies the choice of using the (progressive design-build) contracting method on capital projects where agencies deem it most appropriate.”
- Policy Considerations and Committee Amendment. The Committee may wish to consider the following: as summarized above, the Legislature approved SB 991 just last year. This Committee noted the following in its analysis of SB 991:
“Progressive design-build is a relatively new contracting method…the Legislature last year authorized DGS to use this method for up to three projects. This Committee also approved AB 1845 earlier this year, which allows the Metropolitan Water District of Southern California (MWD) to use the design-build, progressive design-build, and construction manager/general contractor (CM/GC) methods of project delivery for up to 15 regional water recycling projects or drought response projects.
“This bill does have some clearly-defined parameters. It limits the type of agency that may use progressive design-build (counties, cities and special districts that provide water service). It also specifies the kinds of projects that may be procured using progressive design-build (any public works project in excess of $5 million that treats, pumps, stores, or conveys water, wastewater, recycled water, advanced treated water, or supporting facilities). The bill also contains a sunset date and reporting requirements to the Legislature.
“However, this bill is the most expansive authorization of progressive design-build to date – according to the author’s statement, roughly 600 local water agencies could use the provisions of this bill. In addition, unlike other authorizations to use progressive design-build, this bill does not limit the number of projects that these local agencies may procure using progressive design-build. The Committee may wish to consider if any additional safeguards should be added to this bill.” (emphasis added)
This Committee subsequently amended SB 991 to limit its use to a maximum of 15 projects per agency.
This bill and SB 706 (Caballero), which is also being heard by this Committee, expand the provisions of SB 991. As such, both bills represent even broader authorizations for the use of progressive design-build than the Legislature has previously approved. The Committee may wish to amend this bill (and SB 706) to apply a limit of 10 projects per agency to the expanded universe of agencies and projects that this bill and SB 706 propose to authorize, while retaining the 15-project limit in SB 991 for water projects undertaken by local water agencies. This would provide a greater restriction (10 projects per agency, instead of 15) on the expanded authorizations contained in this bill and SB 706, without clawing back the authorization the Legislature provided for water projects less than a year ago via SB 991. Amendments should also be drafted to address the chaptering issues between this bill and SB 706, which presently amend the same code section.
- Related Legislation. AB 400 (Blanca Rubio) extends the sunset date, from January 1, 2025, to January 1, 2031, on provisions of law authorizing local agencies to use the design-build contracting method, and expands the type of JPAs that may use design-build. AB 400 is pending in the Senate Governance and Finance Committee.
SB 706 (Caballero) allows cities, counties, and special districts to use progressive design-build for any project, not just water projects, and extends the progressive design-build reporting requirement and sunset date by one year. SB 706 is pending in this Committee.
- Previous Legislation. AB 1845 (Calderon), Chapter 275, Statutes of 2022, authorized MWD to use design-build, progressive design-build and CM/GC project delivery methods for up to 15 regional water recycling projects or drought response projects.
AB 2789 (Mullin), Chapter 214, Statutes of 2022, repealed the January 1, 2023, sunset date authorizing the Midpeninsula Regional Open Space District and the Santa Clara Valley Open-Space Authority to use the design-build process for the construction of facilities or other buildings, and authorized the East Bay Regional Park District to use the design-build process for the construction of facilities or other buildings.
SB 1354 (Jones), Chapter 900, Statutes of 2022, allowed counties and cities to use design-build contracting for projects that are necessary to comply with construction-related accessibility standards, as specified.
AB 137 (Committee on Budget), Chapter 77, Statutes of 2021, authorized DGS to use the progressive design-build procurement process for up to three public works projects, and outlined parameters for the department’s use of this procurement method.
SB 626 (Dodd), Chapter 247, Statutes of 2021, authorized the Department of Water Resources to use the design-build and CM/GC project delivery methods for facilities of the State Water Project, excluding through Delta conveyance, as specified.
AB 851 (Caballero and Gloria), Chapter 821, Statutes of 2017, allowed the Santa Clara Valley Water District to use the design-build procurement method for specified types of projects.
AB 994 (Muratsuchi), Chapter 321, Statutes of 2017, allowed the Beach Cities Health District to use the design-build procurement method to assign contracts for the construction of facilities or other buildings in the district.
AB 1523 (Obernolte and Reyes), Chapter 154, Statutes of 2017, authorized the San Bernardino County Transportation Authority to use design-build for the construction of the Mt. Vernon Avenue Viaduct project.
SB 373 (Cannella), Chapter 391, Statutes of 2017, allowed the Stanislaus Regional Water Authority to use design-build for its Regional Surface Water Supply Project.
SB 793 (Hill), Chapter 627, Statutes of 2017, allowed the Peninsula Health Care District, the Midpeninsula Regional Open Space District, and the Santa Clara Valley Open-Space Authority to use the design-build procurement method to assign contracts for the construction of facilities or other buildings in those districts.
SB 957 (Hueso), Chapter 212, Statutes of 2016, allowed health care districts that own or operate a hospital or clinic to use the design-build procedure to construct a building or improvements directly related to the construction of a hospital or health facility building.
AB 1290 (Dahle), Chapter 34, Statutes of 2015, allowed the Mayers Memorial Hospital District to use the design-build procedure to construct a building or improvements directly related to the construction of a hospital or health facility building in the district.
SB 374 (Hueso), Chapter 715, Statutes of 2015, allowed SANDAG to use the design-build procurement process for specified development projects related to transit facilities developed or jointly developed by SANDAG.
AB 155 (Alejo), Chapter 865, Statutes of 2014, allowed the Monterey County Water Resources Agency to use design-build contracting to construct a pipeline or tunnel that will connect two reservoirs that the agency owns and operates.
SB 268 (Gaines), Chapter 18, Statutes of 2014, allowed the Last Frontier Health Care District to use the design-build process when contracting for the construction of a building and improvements directly related to a hospital or health facility building at the Modoc Medical Center.
SB 785 (Wolk), Chapter 931, Statutes of 2014, repealed existing law authorizing DGS, CDCR, and local agencies to use the design-build procurement process, and enacted uniform provisions authorizing DGS, CDCR, and specified local agencies to utilize the design-build procurement process for specified public works projects.
- Arguments in Support. The Self-Help Counties Coalition, sponsor of this measure, write, “SHCC member agencies are proud to sponsor SB 617 legislation that will clarify that local transportation and transit agencies may utilize progressive design build (PDB) as method of delivery. PDB is a project delivery method that would allow our agencies to assemble a team to perform design, construction engineering, project management, and construction according to design parameters, performance criteria, and other requirements established by the public agency owner.
“In large complex projects, PDB delivery benefits the public agency owner by providing the opportunity to add the design build team to the overall project team early in the design phase affording the public agency owner and the design build team more opportunities to collaborate during the project’s design phase. Early collaboration is key to reducing project risk, cost, and schedule.
“California's economy and citizens depend on our agencies to deliver and maintain critical infrastructure. SB 617 will provide ‘another tool in the toolbox’ that public agency owners can use to deliver these projects while saving time and money delivering them.”
- Arguments in Opposition. None on file.
REGISTERED SUPPORT / OPPOSITION:
Support
Self-Help Counties Coalition [SPONSOR]
Associated General Contractors of California
California Association of Councils of Governments
California Special Districts Association
California Transit Association
Foothill Transit
Orange County Transportation Authority
Riverside County Transportation Commission (RCTC)
San Diego Metropolitan Transit System
San Gabriel Valley Council of Governments (if amended)
Southern California Regional Rail Authority (METROLINK)
Transportation Agency for Monterey County (TAMC)
Transportation California
Opposition
None on file
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 617 |
CONSENT
Bill No: SB 617
Author: Newman (D)
Amended: 3/30/23
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 16-0, 4/11/23
AYES: Gonzalez, Niello, Allen, Archuleta, Becker, Blakespear, Cortese, Dahle, Dodd, Limón, McGuire, Newman, Nguyen, Seyarto, Umberg, Wahab
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: Public contracts: progressive design-build: local and regional agencies
SOURCE: Self-Help Counties Coalition
DIGEST:
This bill authorizes transit agencies, as specified, and regional transportation planning agencies (RTPA)s, as specified, to utilize progressive design-build procurement method, through January 1, 2029.
ANALYSIS:
Existing law:
- Authorizes, until January 1, 2029, local agencies, defined as any city, county, city and county, or special district that provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process, as specified, for up to 15 public works projects each over $5 million.
- Defines “progressive design-build” as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
- Authorizes, until January 1, 2025, the Department of General Services, the Department of Corrections and Rehabilitation, transit agencies, and local agencies, as defined, to use the design-build procurement process for specified public works projects.
- Provides that the California Department of Transportation (Caltrans) has full possession and control of all state highways.
- Authorizes Caltrans to utilize design-build procurement for up to 10 projects on the state highway system, and an additional 6 projects per fiscal year in the 2022-23 and 2023-24 fiscal years, based on either best value or lowest responsible bid, and sunsets this authority on January 1, 2034.
- Authorizes RTPAs to utilize design-build procurement for an unlimited number of projects on or adjacent to the state highway system and expressways and sunsets this authority on January 1, 2034.
- Requires Caltrans or its consultants perform construction inspection services for any design-build project on or where a project interfaces with the state highway system and sunsets this authority on January 1, 2034.
This bill:
- Expands the definition of a “design-build project” for the purposes of utilizing progressive design-build procurement method, as specified, for projects beyond those related to water facilities.
- Expands the definition of “local agencies” to authorize transit agencies, as specified, and RTPAs, as specified, to utilize progressive-design-build procurement method.
- Stipulates that the progressive design-build authorization included in the bill does not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system.
Comments
- Purpose of the bill. According to the author, “As the federal government prepares to disburse the largest federal infrastructure investment in over a generation under the Infrastructure Investment and Jobs Act, it is incumbent that California grant transportation agencies the necessary flexibility to utilize an alternative contracting method which reduces risk, stretches taxpayer dollars, and renders projects more competitive in qualifying for federal funding. The passage of SB 617 will grant transportation agencies the choice of using the PDB contracting method on capital projects where agencies deem it most appropriate.”
- What is Design-Build? Design-build refers to a procurement and project delivery method in which both the design and construction of a project are procured from a single entity. Design-build differs from the traditional design-bid-build contracting method whereby work on a project is divided into two separate phases: design and construction. Under design-bid-build, the sponsoring government agency is responsible for the design of the project, either by designing the project itself or by contracting with a private entity to do so. When designs are completed, the agency solicits bids from the construction industry and hires the responsible low bidder to build the project. Design-build combines these two phases into a single, comprehensive contract. Design–build is used to minimize risks for the project sponsor and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.
- Design-Build for transportation projects in California. For over 10 years, California’s transportation agencies have had the ability to utilize the design-build procurement method, with some restrictions. Specifically, SB 4 (Cogdill, Second Extraordinary Session, Chapter 2, Statutes of 2009), authorized Caltrans to utilize design-build procurement for 10 state highway, bridge, or tunnel projects. Additionally, it authorized local transportation agencies to utilize design-build on five local street or road projects within the jurisdiction of the agency, if approved by the California Transportation Commission (CTC).
To continue the use of design-build, the Legislature approved AB 401 (Daly, Chapter 586, Statutes of 2013), which authorized Caltrans to use design-build procurement for an additional 10 projects on the state highway system, and provided RTPAs with unlimited authority to use design-build procurement for projects on or adjacent to the state highway system and expressways. AB 401 also assigned Caltrans the responsibility to oversee the construction inspection of projects on or interfacing with the state highway system. AB 1499 (Daly, Chapter 212, Statutes of 2021), further extended this authority for both Caltrans and RTPAs until January 1, 2034.
Transit agencies, along with other state and local agencies, and special districts, have authorization, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services. In 2014, the Legislature consolidated various provisions authorizing design-build for various state and local agencies into consistent, generally-applicable statutes by approving SB 785 (Wolk, Chapter 931, Statues of 2014).
- What is Progressive Design-Build? Progressive design-build is a more recent variant on traditional design-build contracting. The progressive design-build model generally includes two phases. In the first phase, the sponsoring government agency uses a best value process to select a design-build entity who completes preliminary plans and preconstruction services necessary to provide a cost estimate and final design proposal. The project then “progresses” to the second phase of the project, where the sponsoring agency and the design-build entity agree to a final design, project cost, and schedule. If they cannot agree, there is an “off ramp” between the two phases where the sponsoring agency can pursue other options, but still benefit from having the first phase work complete. This is different from traditional design-build where the awarding entity contracts with a single entity to design and construct a project at a set price before design work begins, and without a similar off ramp.
AB 137 (Committee on Budget, Chapter 77, Statutes of 2021) gave some state agencies, not Caltrans, the authority to use progressive design-build with Department of Finance and the State Public Works Board approval. Additionally, last year, the Legislature authorized the use of progressive design-build for certain local agencies for the delivery of water projects. Specifically, SB 991 (Newman, Chapter 243, Statutes of 2022), authorizes, until January 1, 2029, local agencies that provide for the production, storage, supply, treatment, or distribution of water to use progressive design-build for up to 15 specified water projects each over $5 million. The bill outlined the progressive design-build procurement process that eligible local agencies must use:
- The local agency must prepare a request for qualifications to select a design-build entity to complete the project with specified information;
- At the close of the solicitation period, the local agency must review the submissions based solely upon the information provided in the statement of qualifications. The local agency may also interview any of the design-build entities;
- Upon issuing a contract award, the local agency must publicly announce the award, the design-build entity, and the basis for the award;
- The local agency must develop guidelines to prevent conflicts of interest; and
- The local agency must develop a standard form of payment and performance bond for its design-build projects.
After selecting a design-build entity, the local agency can enter into a contract to begin design and preconstruction activities to establish a guaranteed maximum price for the project. Once the local agency has agreed to a guaranteed maximum price with the design-build entity, it has the sole discretion to amend the contract as necessary to complete the project. In the event of unforeseen site conditions, the local agency can amend its contract with the design-build entity. If the costs for completing the project exceed the guaranteed maximum price, these excess costs become the design-build entity’s responsibility. If the cost for these activities are less than the guaranteed maximum price, the design-build entity is not entitled to the difference unless there is prior written agreement concerning the sharing of these funds. If the local agency and the design-build entity do not reach agreement on a guaranteed maximum price, or the local agency otherwise elects not to amend the design-build entity’s contract to complete the remaining work, the local agency can solicit proposals to complete the project from other entities.
SB 991 also requires that local agencies who use this progressive design-build authority to, no later than January 1, 2028, submit a report to the Legislature on the use of the methodology. This report must include specified information on these projects, the bidding process, subcontractors used, and assess the project’s performance.
- Expanding Progressive Design-Build to transportation agencies. SB 617 would expand the existing authority for progressive design-build for the delivery of water projects to transportation agencies for any type of project. Specifically, all RTPAs and transit agencies, as defined, would be able to use progressive design-build for up to 15 projects over $5 million each. As SB 991 only went into effect on January 1, 2023, it does not appear that any local agency has had the opportunity to use the authority. A report is not due to the Legislature until 2028 for review prior to possibly extending the authorization past 2029. Is it too soon to extend the authority to transportation agencies? Is it needed?
As noted by the author, the recent passage of the Infrastructure Investment and Jobs Act (IIJA, P.L. 117-58), authorizes $567 billion in spending through FY 2026 for federal transportation programs to support highway, transit, and rail investments. California is expected to receive roughly $42 billion in formula funds alone. An additional $100 billion is available for transportation capital projects in the form of competitive grants. This historic funding provides significant opportunities for California’s RTPAs and transit agencies. Supporters of the bill contend that under design-build, significant project savings have been realized, and that the use of progressive design-build will provide “another tool in the tool box” that public agencies can use to deliver needed projects.
- Keeping it consistent. In addition to transportation agencies, other local entities are also interested in utilizing progressive design-build. SB 706 (Caballero) would expand the current authorization to all local agencies, meaning cities, counties, and special districts for any type of project. Should both bills move forward, the author may want to coordinate efforts to ensure the key safeguards from SB 991 are preserved and the authorization is consistent.
Related/Prior Legislation
SB 706 (Caballero) authorizes cities, counties, and special districts to use progressive design-build for any project. The bill requires a report to the Legislature by December 31, 2028. This bill is pending on the Senate Floor.
AB 400 (Rubio) eliminates the sunset of January 1, 2025, for the authorization for the Department of General Services, the Department of Corrections and Rehabilitation, and local agencies, as defined, to use the design-build procurement process for specified public works. This bill is pending in the Assembly Local Government Committee.
SB 991 (Newman, Chapter 243, Statutes of 2022) authorized local agencies that provide water service to use progressive design-build for 15 projects over $5 million each.
SB 198 (Committee on Budget and Fiscal Review, Chapter 71, Statutes of 2022) authorized Caltrans to utilize design-build method of procurement for an additional 6 projects per fiscal year for the 2022-23 and 2023-24 fiscal years.
AB 137 (Committee on Budget, Chapter 77, Statutes of 2021) authorized some state agencies the authority to use progressive design-build, up to 3 public works projects, with Department of Finance and the State Public Works Board approval.
AB 1499 (Daly, Chapter 212, Statutes of 2021) extended the sunset date from January 1, 2024 to January 1, 2034 for Caltrans and RTPAs to use the design-build procurement method for transportation projects in California.
SB 785 (Wolk, Chapter 931, Statues of 2014) authorized, until January 1, 2025, the Department of General Services, the Department of Corrections and Rehabilitation, and local agencies, as defined, to use the design-build procurement process for specified public works.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 4/24/23)
Self-Help Counties Coalition (source)
Associated General Contractors of California
California Special Districts Association
Orange County Transportation Authority
Riverside County Transportation Commission
Transportation Agency for Monterey County
Transportation California
OPPOSITION: (Verified 4/24/23)
None received
ARGUMENTS IN SUPPORT: Writing in support, Transportation California notes, “The flexibility that progressive design-build authority provides will ensure that our transportation agencies will have a contracting method that has been demonstrated to reduce risk, maintain or reduce delivery timelines and most importantly, give California projects a better qualifying opportunity to compete for federal funding.”
Prepared by: Melissa White / TRANS. / (916) 651-4121
4/26/23 15:11:54
SENATE COMMITTEE ON TRANSPORTATION
Senator Lena Gonzalez, Chair
2023 - 2024 Regular
Bill No: Hearing Date: 4/11/2023
Author: | Newman | ||
Version: | 3/30/2023 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Melissa White | ||
SUBJECT:
DIGEST: This bill authorizes transit agencies, as specified, and regional transportation planning agencies (RTPA)s, as specified, to utilize progressive design-build procurement method, through January 1, 2029.
ANALYSIS:
Existing law:
- Authorizes, until January 1, 2029, local agencies, defined as any city, county, city and county, or special district that provide for the production, storage, supply, treatment, or distribution of any water from any source, to use the progressive design-build process, as specified, for up to 15 public works projects each over $5 million.
- Defines “progressive design-build” as a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
- Authorizes, until January 1, 2025, the Department of General Services, the Department of Corrections and Rehabilitation, transit agencies, and local agencies, as defined, to use the design-build procurement process for specified public works projects.
- Provides that the California Department of Transportation (Caltrans) has full possession and control of all state highways.
- Authorizes Caltrans to utilize design-build procurement for up to 10 projects on the state highway system, and an additional 6 projects per fiscal year in the 2022-23 and 2023-24 fiscal years, based on either best value or lowest responsible bid, and sunsets this authority on January 1, 2034.
- Authorizes RTPAs to utilize design-build procurement for an unlimited number of projects on or adjacent to the state highway system and expressways and sunsets this authority on January 1, 2034.
- Requires Caltrans or its consultants perform construction inspection services for any design-build project on or where a project interfaces with the state highway system and sunsets this authority on January 1, 2034.
This bill:
- Expands the definition of a “design-build project” for the purposes of utilizing progressive design-build procurement method, as specified, for projects beyond those related to water facilities.
- Expands the definition of “local agencies” to authorize transit agencies, as specified, and RTPA’s, as specified, to utilize progressive-design-build procurement method.
- Stipulates that the progressive design-build authorization included in the bill does not include the authority to perform construction inspection services for projects on, or interfacing with, the state highway system.
COMMENTS:
- Purpose of the bill. According to the author, “As the federal government prepares to disburse the largest federal infrastructure investment in over a generation under the Infrastructure Investment and Jobs Act, it is incumbent that California grant transportation agencies the necessary flexibility to utilize an alternative contracting method which reduces risk, stretches taxpayer dollars, and renders projects more competitive in qualifying for federal funding. The passage of SB 617 will grant transportation agencies the choice of using the PDB contracting method on capital projects where agencies deem it most appropriate.”
- What is Design-Build? Design-build refers to a procurement and project delivery method in which both the design and construction of a project are procured from a single entity. Design-build differs from the traditional design-bid-build contracting method whereby work on a project is divided into two separate phases: design and construction. Under design-bid-build, the sponsoring government agency is responsible for the design of the project, either by designing the project itself or by contracting with a private entity to do so. When designs are completed, the agency solicits bids from the construction industry and hires the responsible low bidder to build the project. Design-build combines these two phases into a single, comprehensive contract. Design–build is used to minimize risks for the project sponsor and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.
- Design-Build for transportation projects in California. For over 10 years, California’s transportation agencies have had the ability to utilize the design-build procurement method, with some restrictions. Specifically, SB 4 (Cogdill, Second Extraordinary Session, Chapter 2, Statutes of 2009), authorized Caltrans to utilize design-build procurement for 10 state highway, bridge, or tunnel projects. Additionally, it authorized local transportation agencies to utilize design-build on five local street or road projects within the jurisdiction of the agency, if approved by the California Transportation Commission (CTC).
To continue the use of design-build, the Legislature approved AB 401 (Daly, Chapter 586, Statutes of 2013), which authorized Caltrans to use design-build procurement for an additional 10 projects on the state highway system, and provided RTPAs with unlimited authority to use design-build procurement for projects on or adjacent to the state highway system and expressways. AB 401 also assigned Caltrans the responsibility to oversee the construction inspection of projects on or interfacing with the state highway system. AB 1499 (Daly, Chapter 212, Statutes of 2021), further extended this authority for both Caltrans and RTPAs until January 1, 2034.
Transit agencies, along with other state and local agencies, and special districts, have authorization, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services. In 2014, the Legislature consolidated various provisions authorizing design-build for various state and local agencies into consistent, generally-applicable statutes by approving SB 785 (Wolk, Chapter 931, Statues of 2014).
- What is Progressive Design-Build? Progressive design-build is a more recent variant on traditional design-build contracting. The progressive design-build model generally includes two phases. In the first phase, the sponsoring government agency uses a best value process to select a design-build entity who completes preliminary plans and preconstruction services necessary to provide a cost estimate and final design proposal. The project then “progresses” to the second phase of the project, where the sponsoring agency and the design-build entity agree to a final design, project cost, and schedule. If they cannot agree, there is an “off ramp” between the two phases where the sponsoring agency can pursue other options, but still benefit from having the first phase work complete. This is different from traditional design-build where the awarding entity contracts with a single entity to design and construct a project at a set price before design work begins, and without a similar off ramp.
AB 137 (Committee on Budget, Chapter 77, Statutes of 2021) gave some state agencies, not Caltrans, the authority to use progressive design-build with Department of Finance and the State Public Works Board approval. Additionally, last year, the Legislature authorized the use of progressive design-build for certain local agencies for the delivery of water projects. Specifically, SB 991 (Newman, Chapter 243, Statutes of 2022), authorizes, until January 1, 2029, local agencies that provide for the production, storage, supply, treatment, or distribution of water to use progressive design-build for up to 15 specified water projects each over $5 million. The bill outlined the progressive design-build procurement process that eligible local agencies must use:
- The local agency must prepare a request for qualifications to select a design-build entity to complete the project with specified information;
- At the close of the solicitation period, the local agency must review the submissions based solely upon the information provided in the statement of qualifications. The local agency may also interview any of the design-build entities;
- Upon issuing a contract award, the local agency must publicly announce the award, the design-build entity, and the basis for the award;
- The local agency must develop guidelines to prevent conflicts of interest; and
- The local agency must develop a standard form of payment and performance bond for its design-build projects.
After selecting a design-build entity, the local agency can enter into a contract to begin design and preconstruction activities to establish a guaranteed maximum price for the project. Once the local agency has agreed to a guaranteed maximum price with the design-build entity, it has the sole discretion to amend the contract as necessary to complete the project. In the event of unforeseen site conditions, the local agency can amend its contract with the design-build entity. If the costs for completing the project exceed the guaranteed maximum price, these excess costs become the design-build entity’s responsibility. If the cost for these activities are less than the guaranteed maximum price, the design-build entity is not entitled to the difference unless there is prior written agreement concerning the sharing of these funds. If the local agency and the design-build entity do not reach agreement on a guaranteed maximum price, or the local agency otherwise elects not to amend the design-build entity’s contract to complete the remaining work, the local agency can solicit proposals to complete the project from other entities.
SB 991 also requires that local agencies who use this progressive design-build authority to, no later than January 1, 2028, submit a report to the Legislature on the use of the methodology. This report must include specified information on these projects, the bidding process, subcontractors used, and assess the project’s performance.
- Expanding Progressive Design-Build to transportation agencies. SB 617 would expand the existing authority for progressive design-build for the delivery of water projects to transportation agencies for any type of project. Specifically, all RTPAs and transit agencies, as defined, would be able to use progressive design-build for up to 15 projects over $5 million each. As SB 991 only went into effect on January 1, 2023, it does not appear that any local agency has had the opportunity to use the authority. A report is not due to the Legislature until 2028 for review prior to possibly extending the authorization past 2029. Is it too soon to extend the authority to transportation agencies? Is it needed?
As noted by the author, the recent passage of the Infrastructure Investment and Jobs Act (IIJA, P.L. 117-58), authorizes $567 billion in spending through FY 2026 for federal transportation programs to support highway, transit, and rail investments. California is expected to receive roughly $42 billion in formula funds alone. An additional $100 billion is available for transportation capital projects in the form of competitive grants. This historic funding provides significant opportunities for California’s RTPA’s and transit agencies. Supporters of the bill contend that under design-build, significant project savings have been realized, and that the use of progressive design-build will provide “another tool in the tool box” that public agencies can use to deliver needed projects.
Writing in support, Transportation California notes, “The flexibility that progressive design build authority provides will ensure that our transportation agencies will have a contracting method that has been demonstrated to reduce risk, maintain or reduce delivery timelines and most importantly, give California projects a better qualifying opportunity to compete for federal funding.”
- Keeping it consistent. In addition to transportation agencies, other local entities are also interested in utilizing progressive design-build. SB 706 (Caballero) would expand the current authorization to all local agencies, meaning cities, counties, and special districts for any type of project. Should both bills move forward, the author may want to coordinate efforts to ensure the key safeguards from SB 991 are preserved and the authorization is consistent.
Related/PREVIOUS Legislation:
SB 706 (Caballero) – Would authorize cities, counties, and special districts to use progressive design-build for any project. The bill would require a report to the Legislature by December 31, 2028. This bill is pending in the Senate Appropriations Committee.
SB 991 (Newman, Chapter 243, Statutes of 2022) – Authorized local agencies that provide water service to use progressive design-build for 15 projects over $5 million each.
SB 198 (Committee on Budget and Fiscal Review, Chapter 71, Statutes of 2022) – Authorized Caltrans to utilize design-build method of procurement for an additional 6 projects per fiscal year for the 2022-23 and 2023-24 fiscal years.
AB 137 (Committee on Budget, Chapter 77, Statutes of 2021) – Authorized some state agencies the authority to use progressive design-build, up to 3 public works projects, with Department of Finance and the State Public Works Board approval.
AB 1499 (Daly, Chapter 212, Statutes of 2021) – Extended the sunset date from January 1, 2024 to January 1, 2034 for Caltrans and RTPAs to use the design-build procurement method for transportation projects in California.
SB 785 (Wolk, Chapter 931, Statues of 2014) – Authorized, until January 1, 2025, the Department of General Services, the Department of Corrections and Rehabilitation, and local agencies, as defined, to use the design-build procurement process for specified public works.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
Unknown
POSITIONS: (Communicated to the committee before noon on Wednesday,
April 5, 2023.)
SUPPORT:
Self-Help Counties Coalition (Sponsor)
Associated General Contractors of California
California Special Districts Association
Orange County Transportation Authority
Riverside County Transportation Commission (RCTC)
Transportation Agency for Monterey County (TAMC)
Transportation California
OPPOSITION:
None received
-- END --
Discussed in Hearing
Assembly Standing Committee on Local Government
Bill Author
Bill Co-Author(s):