What does this bill do?
This bill limits how much extra financial security California's oil and gas regulator can require from an operator to cover plugging, abandonment, and decommissioning by capping the amount based on the operator's total number of active and idle wells and by applying those rules to people who buy the right to operate or control wells. It allows alternative financial assurances like self‑insurance or corporate guarantees only with a binding agreement that includes a plugging schedule, financial tests and required notices if finances worsen, creates a pilot for buyers who acquire wells solely to plug or redevelop them under a work plan, and requires public posting of well transfer and plugging status.
The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.
Existing law authorizes the Geologic Energy Management Division in the Department of Conservation to require an operator of an oil and gas well to provide, in addition to specified types of required indemnity bonds, an additional amount of security acceptable to the division based on the divisions evaluation of the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources, as provided. Existing law requires the division to consider specified factors in evaluating the risks that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources. Existing law prohibits this additional security from exceeding the lesser of the divisions estimation of the reasonable costs of properly plugging and abandoning all of the operators wells and decommissioning any attendant production facilities, or $30,000,000. A person who violates or fails to comply with this provision, or any related law concerning oil and gas, is guilty of a crime.
This bill would instead prohibit this additional security from exceeding the lesser of the divisions estimation of the reasonable costs of properly plugging and abandoning all of the operators wells and decommissioning any attendant production facilities, or a maximum amount of additional security based on the total number of active and idle wells under the control of the operator pursuant to a specified schedule, as provided. The bill would prohibit the division from increasing the amount of additional security required of an operator that had an additional security agreement approved by the division as of January 1, 2027, until 5 3 years after the effective date of the agreement, as provided. The bill would explicitly extend these additional security requirements to a person who acquires the right to operate or control a well or production facility, as provided. The bill would establish that compliance with these additional security requirements by either the operator of record or the person who acquires the right to operate or control a well or production facility constitutes compliance for both parties, and would prohibit the division from requiring duplicative security, as provided.
Existing law authorizes the above-described additional amount of security to be an indemnity bond, specified forms of deposit, or any other means of equally effective financial assurance approved by the division, including a demonstration of self-insurance pursuant to a specified process.
This bill would, as a condition of obtaining division approval of self-insurance or a corporate guarantee, require an additional security agreement between the operator and the division that includes, among other things, an enforceable schedule for the plugging and abandonment of wells and decommissioning of production facilities consistent with an operators idle well management plan, as provided. The bill would also require the operator, as part of that additional security agreement, to immediately notify the division if the operator is unable to satisfy the financial criteria, and would make a failure to make this notification a violation subject to civil and criminal penalties, as provided. By expanding the scope of a crime, the bill would impose a state-mandated local program. The bill would also require the division to reevaluate whether self-insurance or a corporate guarantee continues to constitute an equally effective means of financial assurance at least once every 3 years, or upon a material change in the financial condition of the operator or guarantor entity, whichever occurs first. The bill would require an operator approved for self-insurance or a corporate guarantee who the supervisor subsequently determines to be out of compliance with an approved idle well management plan, or specified operators out of compliance with idle well fee requirements, to provide other financial assurance within 90 days of that determination, as provided.
Existing law also requires a person who acquires the right to operate a well or production facility to file with the State Oil and Gas Supervisor an individual indemnity bond or a blanket indemnity bond in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning the facility, and site restoration, as provided. Under existing law, an operator may, in lieu of this bonding requirement and with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, including specified types of deposits, an irrevocable letter of credit, or a fully funded trust fund, and excluding self-insurance or corporate guarantees, as provided.
This bill would repeal the exclusion of self-insurance or corporate guarantee, as described above. The bill would additionally authorize an operator to, in lieu of the bonding requirement and with the written approval of the supervisor, provide the required security through specified means of financial assurance, including pursuant to the above-described process for obtaining division approval for self-insurance or a corporate guarantee applicable to existing operators, as provided.
Existing law authorizes the supervisor or a district deputy to order the plugging and abandonment of a well or the decommissioning of a production facility that has been deserted. If the supervisor determines that the current operator, as determined by the records of the supervisor, does not have the financial resources to fully cover that cost of plugging and abandonment of the well or the decommissioning of a production facility that has been deserted, existing law makes immediately preceding operators responsible for that cost. Existing law authorizes the supervisor to continue to look seriatim to previous operators until an operator is found with sufficient financial resources to cover the cost, except as provided.
This bill would exempt from the above-described requirement to file with the supervisor, upon acquiring the right to operate a well or production facility, an individual indemnity bond or a blanket indemnity bond sufficient to cover all costs of plugging and abandonment, decommissioning the facility, and site restoration, (1) an operator who operator, or a person who acquires the right to operate or control a well or production facility, who has complied with an idle well management plan or fee schedule, and specified reporting requirements, as provided, if the operator of record has provided obtained and maintained additional security approved by the division, as provided, and (2) a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility. facility for purposes of redevelopment, as defined, or to satisfy the above-described obligations of previous operators, as provided. The bill would explicitly state that a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility for the purposes of redevelopment or to satisfy the obligations of previous operators is subject to the state oil and gas laws as an operator, until a determination by the supervisor that the well has been properly plugged and abandoned or the production facilities have been decommissioned, or that additional work related to abandoning the well is not practical or would pose greater environmental or safety risk, as provided. Upon this determination by the supervisor, the bill would require the supervisor to release the bond, and would release the acquiring person from any further obligation or liability for the well or facility. The bill would require a person who, before an acquisition for the sole purpose of plugging and abandoning the well or decommissioning the production facility, was responsible as an owner or operator of the well or production facility and subject to orders related to remediation issued by the supervisor to remain responsible for the well or production facility and any unfunded costs associated with plugging and abandonment of the well or decommissioning of the facility, as provided. The bill would prohibit the use of a well or production facility acquired for the sole purpose of plugging and abandoning the well or decommissioning the production facility from being used for oil or gas production or injection. production, injection, gas storage, or any associated operation. By creating a new crime, the bill would impose a state-mandated local program.
This bill would require a person acquiring the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility, facility for the purpose of redevelopment, before completing the acquisition, to submit to the supervisor a declaration, under penalty of perjury, that the acquisition is for the sole purpose of plugging and abandoning the well or decommissioning the production facility, facility for the purpose of redevelopment, a description of the redevelopment plan, and a plugging and abandoning work plan, as provided. By expanding the scope of the crime of perjury, the bill would impose a state-mandated local program. The bill would require an acquiring person who submits the declaration to commence plugging and abandonment or decommissioning operations within 24 months of the date of acquisition, unless the supervisor determines that a longer period is warranted, as provided. and would authorize the supervisor to grant a 12-month extension, as provided. The bill would authorize require the supervisor to require an acquiring person who fails to commence operations within 24 months within this time period to file financial assurance, as provided. The bill would require a person acquiring the rights to a well or production facility pursuant to these provisions to provide annual updates on the plugging and abandonment work plan. If the supervisor determines that the acquiring person is not capable of plugging the wells within these timeframes, the bill would require the acquiring person to post specified financial assurance and would require the supervisor to notify the previous operator who is responsible for the plugging and abandonment. The bill would establish that no more than 100 wells or associated production facilities may be included, on an annual basis, in this alternative financial security program, as provided.
This bill would, on and after January 1, 2028, and quarterly thereafter, require the division to include, as part of its annual report to the Legislature related to well transfer activity and financial assurance, post on its internet website specified information related to well transfers, wells and production facilities acquired for the sole purpose of plugging and abandoning or decommissioning, and a description of wells located in or within one mile of a disadvantaged community. The bill would require the supervisor and Director of Conservation to annually attend specified legislative hearings to report on well transfer activity, implementation and status of financial assurance for indemnification, and the above-described provisions related to redevelopment of oil and gas wells, and would require the division, on or before January 1, 2032, to prepare and submit a related report to the relevant legislative policy and budget committees in both houses of the Legislature, as provided.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
This bill would make the operation of its provisions contingent upon the enactment of AB 2461 of the 202526 Regular Session.
Existing law authorizes the Geologic Energy Management Division in the Department of Conservation to require an operator of an oil and gas well to provide, in addition to specified types of required indemnity bonds, an additional amount of security acceptable to the division based on the divisions evaluation of the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources, as provided. Existing law authorizes this additional amount of security to be an indemnity bond, specified forms of deposit, or any other means of equally effective financial assurance approved by the division, including a demonstration of self-insurance pursuant to a specified process. requires the division to consider specified factors in evaluating the risks that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources. Existing law prohibits this additional security from exceeding the lesser of the divisions estimation of the reasonable costs of properly plugging and abandoning all of the operators wells and decommissioning any attendant production facilities, or $30,000,000. A person who violates or fails to comply with this provision, or any related law concerning oil and gas, is guilty of a crime.
This bill would instead prohibit this additional security from exceeding the lesser of the divisions estimation of the reasonable costs of properly plugging and abandoning all of the operators wells and decommissioning any attendant production facilities, or a maximum amount of additional security based on the total number of active and idle wells under the control of the operator pursuant to a specified schedule, as provided. The bill would prohibit the division from increasing the amount of additional security required of an operator that had an additional security agreement approved by the division as of January 1, 2027, until 5 years after the effective date of the agreement, as provided.
Existing law authorizes the above-described additional amount of security to be an indemnity bond, specified forms of deposit, or any other means of equally effective financial assurance approved by the division, including a demonstration of self-insurance pursuant to a specified process.
This bill would, as a condition of obtaining division approval of self-insurance or a corporate guarantee, require an additional security agreement between the operator and the division that includes, among other things, an enforceable schedule for the plugging and abandonment of wells and decommissioning of production facilities consistent with an operators idle well management plan, as provided. The bill would also require the operator, as part of that additional security agreement, to immediately notify the division if the operator is unable to satisfy the financial criteria, and would make a failure to make this notification a violation subject to civil and criminal penalties, as provided. By expanding the scope of a crime, the bill would impose a state-mandated local program. The bill would also require the division to reevaluate whether self-insurance or a corporate guarantee continues to constitute an equally effective means of financial assurance at least once every 3 years, or upon a material change in the financial condition of the operator or guarantor entity, whichever occurs first.
Existing law also requires a person who acquires the right to operate a well or production facility to file with the State Oil and Gas Supervisor an individual indemnity bond or a blanket indemnity bond in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning the facility, and site restoration, as provided. Under existing law, an operator may, in lieu of this bonding requirement and with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, including specified types of deposits, an irrevocable letter of credit, or a fully funded trust fund, and excluding self-insurance or corporate guarantees, as provided. A person who violates or fails to comply with this provision, or any related law concerning oil and gas, is guilty of a crime.
This bill would repeal the exclusion of self-insurance or corporate guarantee, as described above. The bill would additionally authorize an operator to, in lieu of the bonding requirement and with the written approval of the supervisor, provide the required security through a specified means of financial assurance, including pursuant to the above-described process for obtaining division approval for self-insurance or a corporate guarantee applicable to existing operators, as provided.
This bill would exempt from the above-described requirement to file with the supervisor, upon acquiring the right to operate a well or production facility, an individual indemnity bond or a blanket indemnity bond sufficient to cover all costs of plugging and abandonment, decommissioning the facility, and site restoration, (1) operators an operator who have has provided additional security approved by the division, as provided, and (2) a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility. The bill would explicitly state that a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility is subject to the state oil and gas laws as an operator, until a determination by the supervisor that the well has been properly plugged and abandoned or the production facilities have been decommissioned, or that additional work related to abandoning the well is not practical or would pose greater environmental or safety risk, as provided. Upon this determination by the supervisor, the bill would require the supervisor to release the bond, and would release the acquiring person from any further obligation or liability for the well or facility. The bill would require a person who, before an acquisition for the sole purpose of plugging and abandoning the well or decommissioning the production facility, was responsible as an owner or operator of the well or production facility and subject to orders related to remediation issued by the supervisor to remain responsible for the well or production facility. facility and any unfunded costs associated with plugging and abandonment of the well or decommissioning of the facility, as provided. The bill would prohibit the use of a well or production facility acquired for the sole purpose of plugging and abandoning the well or decommissioning the production facility from being used for oil or gas production or injection. By creating a new crime, the bill would impose a state-mandated local program.
This bill would require a person acquiring the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility, before completing the acquisition, to submit to the supervisor a declaration, under penalty of perjury, that the acquisition is for the sole purpose of plugging and abandoning the well or decommissioning the production facility, and a plugging and abandoning work plan, as provided. By expanding the scope of the crime of perjury, the bill would impose a state-mandated local program. The bill would require an acquiring person who submits the declaration to commence plugging and abandonment or decommissioning operations within 24 months of the date of acquisition, unless the supervisor determines that a longer period is warranted, as provided. The bill would authorize the supervisor to require an acquiring person who fails to commence operations within 24 months to file financial assurance, as provided.
This bill would, on and after January 1, 2028, require the division to include, as part of its annual report to the Legislature related to well transfer activity and financial assurance, specified information related to well transfers, wells and production facilities acquired for the sole purpose of plugging and abandoning or decommissioning, and a description of wells located in or within one mile of a disadvantaged community.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
This bill would make the operation of its provisions contingent upon the enactment of AB 2461 of the 202526 Regular Session.
Existing law authorizes the Geologic Energy Management Division in the Department of Conservation to require an operator of an oil and gas well to provide, in addition to specified types of required indemnity bonds, an additional amount of security acceptable to the division based on the divisions evaluation of the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources, as provided. Existing law authorizes this additional amount of security to be an indemnity bond, specified forms of deposit, or any other means of equally effective financial assurance approved by the division, including a demonstration of self-insurance pursuant to a specified process.
Existing law requires a person who acquires the right to operate a well or production facility to file with the State Oil and Gas Supervisor an individual indemnity bond or a blanket indemnity bond in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning the facility, and site restoration, as provided. Under existing law, an operator may, in lieu of this bonding requirement and with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, including specified types of deposits, an irrevocable letter of credit, or a fully funded trust fund, and excluding self-insurance or corporate guarantees, as provided. A person who violates or fails to comply with this provision, or any related law concerning oil and gas, is guilty of a crime.
This bill would repeal the exclusion of self-insurance or corporate guarantee, as described above. The bill would additionally authorize an operator to, in lieu of the bonding requirement and with the written approval of the supervisor, provide the required security through a specified means of financial assurance, as provided.
This bill would exempt from the above-described requirement to file with the supervisor, upon acquiring the right to operate a well or production facility, an individual indemnity bond or a blanket indemnity bond sufficient to cover all costs of plugging and abandonment, decommissioning the facility, and site restoration, (1) operators who have provided additional security approved by the division, as provided, and (2) a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility from the above-described bonding and financial assurance requirements. facility. The bill would explicitly state that a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility is subject to the state oil and gas laws as an operator, until a determination by the supervisor that the well has been properly plugged and abandoned or the production facilities have been decommissioned, or that additional work related to abandoning the well is not practical or would pose greater environmental or safety risk, as provided. Upon this determination by the supervisor, the bill would require the supervisor to release the bond, and would release the acquiring person from any further obligation or liability for the well or facility. The bill would require a person who, before an acquisition for the sole purpose of plugging and abandoning the well or decommissioning the production facility, was responsible as an owner or operator of the well or production facility and subject to orders related to remediation issued by the supervisor to remain responsible for the well or production facility. The bill would prohibit the use of that a well or production facility acquired for the sole purpose of plugging and abandoning the well or decommissioning the production facility from being used for oil or gas production or injection. By creating a new crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Geologic Energy Management Division in the Department of Conservation to require an operator of an oil and gas well to provide, in addition to specified types of required indemnity bonds, an additional amount of security acceptable to the division based on the divisions evaluation of the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources, as provided. Existing law authorizes this additional amount of security to be an indemnity bond, specified forms of deposit, or any other means of equally effective financial assurance approved by the division, including a demonstration of self-insurance pursuant to a specified process.
Existing law requires a person who acquires the right to operate a well or production facility to file with the State Oil and Gas Supervisor an individual indemnity bond or a blanket indemnity bond in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning the facility, and site restoration, as provided. Under existing law, an operator may, in lieu of this bonding requirement and with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, including specified types of deposits, an irrevocable letter of credit, or a fully funded trust fund, and excluding self-insurance or corporate guarantees, as provided. A person who violates or fails to comply with this provision, or any related law concerning oil and gas, is guilty of a crime.
This bill would repeal the exclusion of self-insurance or corporate guarantee, as described above. The bill would additionally authorize an operator to, in lieu of the bonding requirement and with the written approval of the supervisor, provide the required security through a specified means of financial assurance, as provided.
This bill would exempt a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility from the above-described bonding and financial assurance requirements. The bill would prohibit the use of that well or production facility for oil or gas production or injection. By creating a new crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Legislature finds and declares all of the following:
(a)When signing Assembly Bill 1167 (AB 1167) of the 202324 Regular Session (Chapter 359 of the Statutes of 2023), the Governor cautioned that new financial assurances requirements for oil and gas well transfers may create a risk of current operators deserting hazardous wells and stated his intent to work with the Legislature to enact revisions necessary to address that risk and to align the statute with existing and developing programs administered by the Department of Conservations Geologic Energy Management Division (CalGEM).
(b)Since the enactment of AB 1167, oil and gas operators have, in nearly all cases, been unable to transfer producing or idle wells, resulting in a substantial reduction in the market value and liquidity of those assets, and adding to the risk cited by the Governor and the Department of Finance that the legislation could result in additional oil and gas well desertions.
(c)The impairment of well transferability has constrained many operators ability to access capital needed to maintain facilities, comply with regulatory requirements, and responsibly plan for decommissioning and asset retirement obligations.
(d)The resulting reduction in asset value and access to capital has increased the risk that wells may remain with operators lacking the financial capacity to maintain or properly abandon them, thereby elevating the risk of well desertion identified by the Department of Finance analysis and by the Governor at the time AB 1167 was signed.
(e)At the time AB 1167 was enacted, Section 3237 of the Public Resources Code already provided that an operator transferring a well after January 1, 1996, remains liable for plugging and abandonment obligations if the acquiring operator becomes insolvent or otherwise fails to meet those obligations.
(f)Existing law authorizes CalGEM to order responsible operators to plug and abandon wells and, if an operator fails to do so, to perform that work using industry fee revenue and to recover costs through reimbursement requirements, civil penalties, liens, and other enforcement mechanisms, through which the state has recovered more than $25,000,000 from responsible operators in the last few years alone.
(g)Pursuant to Section 3237 of the Public Resources Code, operators transferring wells have regularly required acquiring operators to establish sinking funds or similar financial arrangements to ensure sufficient resources are available to meet future asset retirement obligations when wells are no longer economically productive.
(h)Using the authority established by Assembly Bill 1057 (AB 1057) of the 201920 Regular Session (Chapter 771 of the Statutes of 2019), CalGEM significantly strengthened Californias financial assurance framework and secured tens of millions of dollars in additional bonding and other financial assurance mechanisms to ensure that oil and gas operators decommissioning responsibilities are adequately funded at the end of the economic life of their facilities.
(i)The State of California is eligible for $165,000,000 in federal taxpayer funds from the orphan well program authorized by the bipartisan Infrastructure Investment and Jobs Act (Public Law 117-58), of which over $25,000,000 has already been encumbered and spent to plug wells in California, with more to come.
(j)Assembly Bill 2729 (AB 2729) of the 201516 Regular Session (Chapter 272 of the Statutes of 2016) established a comprehensive framework for the management and remediation of idle wells, and subsequent legislation has built upon that framework to accelerate idle well remediation and reduce long-term risks associated with prolonged well inactivity.
(k)Following the enactment of AB 1167, the Legislature passed and the Governor signed Assembly Bill 1866 (AB 1866) of the 202324 Regular Session (Chapter 548 of the Statutes of 2024), which built upon the idle well framework established by AB 2729 by strengthening idle well management requirements and contributing to continued significant reductions in idle well inventories, resulting in the lowest proportion of idle wells in operator portfolios in decades.
(l)The cumulative effect of AB 2729, AB 1057, AB 1866, and related statutes demonstrates that California has made substantial progress in reducing idle and orphaned wells while strengthening financial assurance requirements for oil and gas operators. Operators have plugged over 12,000 idle wells in the last three years alone. alone, and the number of idle wells remains over 30,000.
(m)Severely restricting the transferability of oil and gas assets has produced unintended consequences that undermine business valuations, reduce income, and impair the financial stability of remaining operators, without advancing the states existing idle well and decommissioning objectives.
(n)These unintended consequences demonstrated by more than two years of data are now evident and warrant legislative action.
(o)It is therefore necessary and appropriate to enact revisions consistent with the Governors October 7, 2023, signing message for AB 1167 in order to mitigate the risk of well desertion, preserve responsible asset stewardship, and better align statutory requirements with existing regulatory programs administered by CalGEM.
SEC. 2.Section 3017 of the Public Resources Code is amended to read:3017.(a)It is the intent of the Legislature that the oil and gas industry pay for all necessary costs of plugging and abandonment and site restoration of oil and gas wells.
(b)It is the intent of the Legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless adequate financial assurance to cover the full cost of plugging and abandonment and site restoration has been provided, except when the well is being transferred for the sole purpose of plugging and abandoning the well or decommissioning the attendant production facility.
SEC. 3.Section 3205.3 of the Public Resources Code is amended to read:3205.3.(a)(1)The division may require an operator or person who acquires the right to operate or control a well or production facility filing an individual indemnity bond pursuant to Section 3204 or a blanket indemnity bond pursuant to Section 3205, as applicable, to provide an additional amount of security acceptable to the division based on the divisions evaluation of the risk that the operator or person who acquires the right to operate or control a well or production facility will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources. The additional security required by the division shall not exceed the lesser of the divisions estimation of the reasonable costs of properly plugging and abandoning all of the operators wells and decommissioning any attendant production facilities in accordance with Section 3208, or the maximum amount established pursuant to paragraph (2). For purposes of this section, compliance with the requirements of this section by either the operator of record or the person who acquires the right to operate or control a well or production facility shall satisfy the requirements of this section for both parties and the division shall not require duplicative security from the other party with respect to the same wells or production facilities.
(2)The applicable maximum amount of additional security shall be determined based on the total number of active and idle wells under the control of the operator, as follows:
(A)Thirty million dollars ($30,000,000) for an operator having 4,000 or fewer active and idle wells in the state.
(B)For an operator having more than 4,000, but no more than 10,000, active and idle wells in the state, the following amounts shall apply:
(i)On and after January 1, 2028, to December 31, 2029, inclusive, thirty-five million dollars ($35,000,000).
(ii)On and after January 1, 2030, to December 31, inclusive, 2031, 2031, inclusive, forty million dollars ($40,000,000).
(iii)On and after January 1, 2032, fifty million dollars ($50,000,000).
(C)For an operator having more than 10,000 active and idle wells in the state, the following amounts shall apply:
(i)On and after January 1, 2028, to December 31, 2029, inclusive, forty-five million dollars ($45,000,000).
(ii)On and after January 1, 2030, to December 31, 2031, inclusive, sixty million dollars ($60,000,000).
(iii)On and after January 1, 2032, eighty million dollars ($80,000,000).
(D)Notwithstanding Subject to subdivision (e) and notwithstanding subparagraphs (A) to (C), inclusive, the division shall not increase the amount of additional security required of an operator that had an additional security agreement approved by the division pursuant to this section in effect as of January 1, 2027, until five three years after the effective date of the agreement. Upon expiration of the five-year three-year period, the division may increase the amount of additional security required of the operator to an amount not exceeding the applicable maximum amount determined pursuant to subparagraphs (A) to (C), inclusive, subject to the notice requirements of subdivision (d).
(b)When making an estimation under this section of the reasonable costs of properly plugging and abandoning an operators well or wells and decommissioning any attendant production facilities, the division shall provide the operator with an opportunity to submit the operators own estimation and shall consider all of the following:
(1)The depth of the well or wells.
(2)The accessibility and surroundings of the well or wells and any attendant production facilities.
(3)Available information about the condition of the well or wells and any attendant production facilities.
(4)Available information about the cost to plug and abandon a comparable well or wells.
(5)Available information about the cost to decommission production facilities comparable to the production facilities attendant to the well or wells.
(6)The operators cost estimates, if provided.
(7)Whether the operator is a public utility gas corporation, as defined in subdivision (a) of Section 216 of the Public Utilities Code.
(8)Any other information that the division determines to be relevant to the estimation of cost.
(c)The division, in evaluating the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources, shall consider all of the following:
(1)The difference between the estimation of reasonable costs of plugging and abandonment under subdivisions (a) and (b) and the total amount of indemnity bonds or other financial assurances in place to ensure funding of the plugging and abandonment of the operators well or wells.
(2)The level of current production from the well or wells.
(3)Available information regarding estimated reserves remaining in place associated with the well or wells.
(4)Whether the well or wells are critical, are environmentally sensitive, or are in an urban area, as those terms are defined by the division in regulation.
(5)To the extent that relevant information is available to the division, the financial status of the operator and the operators financial capacity to plug and abandon all of the operators wells.
(6)The past record of compliance by the operator with the division.
(7)The number of idle wells to be covered by the indemnity bond and the operators record of compliance with the requirements of Section 3206 and the divisions regulations related to the management of idle wells.
(8)Whether the operators well or wells are subject to any bonding or financial assurance requirements by a local government.
(9)Whether the operators well or wells are already subject to additional bond coverage by the division pursuant to Section 3270.4.
(10)Any other information that the division determines to be relevant to the evaluation of the risk, including industrywide financial trends, which shall include, but is not necessarily limited to, those trends affecting the solvency and creditworthiness of oil and gas operators in California.
(d)The division shall provide the operator with notice of the requirement to provide additional security, and the notice shall be served by personal service or certified mail. The operator shall provide the additional security within 180 days of service of notice. The notice shall include an explanation of the divisions estimation of the reasonable costs to plug and abandon the operators well or wells and of the basis for the decision to require the operator to provide additional security. The requirements of this subdivision shall also apply to any subsequent increase in the amount of additional security required under subdivision (e).
(e)The division shall increase or decrease the amount of additional security required under this section to account for changed circumstances or new information. The operator may, at any time, petition the division to reevaluate the divisions evaluation of the risk or cost estimates, and the division shall respond to the petition in writing within 60 days of receipt of the petition.
(f)(1)An operator shall provide additional security required under this section in the form of an indemnity bond, a form of deposit described in Section 995.710 of the Code of Civil Procedure, or any other equally effective means of financial assurance approved by the division. Examples of equally effective means of financial assurance that the division may consider for approval include a letter of credit, a corporate guarantee, a trust fund, or a demonstration of self-insurance.
(2)The division may only approve self-insurance as an equally effective means of financial assurance if the operator provides detailed financial information demonstrating to the divisions satisfaction that, based on the considerations under subdivision (c), the risks associated with the operators potential for desertion of its well or wells are low, and only if the approval is conditioned upon all of the requirements established pursuant to paragraph (3). If the division approves self-insurance as an equally effective means of financial assurance, at least once every five three years the operator shall update the supporting financial information and the division shall reevaluate whether self-insurance continues to be an equally effective means of financial assurance. If an operator provides financial information to the division under this section that is not otherwise publicly available, the division shall maintain the information as confidential.
(3)An approval of self-insurance or a corporate guarantee under paragraph (2) shall be set forth in an additional security agreement between the operator and the division and shall be conditioned upon all of the following requirements:
(A)(i)The additional security agreement shall include an enforceable schedule for the plugging and abandonment of wells and decommissioning of production facilities consistent with the operators decommissioning obligations under paragraph (2) of subdivision (a) of Section 3206. An operator who owns or operates 11 or more idle wells without an approved idle well management plan or who is out of compliance with its idle well management plan shall be ineligible for self-insurance.
(ii)An operator who owns or operates 11 or more idle wells who enters into an additional security agreement that includes self-insurance or a corporate guarantee who is subsequently determined by the supervisor after the annual performance review to be out of compliance with an approved idle well management plan pursuant to paragraph (2) of subdivision (a) of Section 3206, or an operator who owns or operates 10 or fewer idle wells who enters into an additional security agreement that includes self-insurance or a corporate guarantee who is subsequently determined by the supervisor after the annual performance review to be out of compliance with either an idle well management plan or idle well fee requirements pursuant to paragraph (1) of subdivision (a) of Section 3206, shall be required to provide other financial assurance within 90 days of that determination, which may be in the form of a bond, or, upon written approval of the supervisor, an equally effective means of financial insurance, including a deposit pursuant to Section 3205.5, an irrevocable letter of credit, or a fully funded trust fund.
(B)The operator shall provide to the division the three previous years years of certified reserve reports and audited financial statements, including balance sheets and income statements. If audited financial statements are not available, the operator shall provide financial statements certified by the operators chief financial officer. The additional security agreement shall include financial criteria that the operator shall satisfy for the duration of the agreement. The financial criteria set forth in the agreement may address the operators bond ratings, debt-to-equity ratios, liquidity, cash return on liabilities, net profitability, minimum net worth, remaining economic life of production fields or leases, and any other financial indicators the division determines are relevant to the evaluation of the operators risk of desertion under subdivision (c). The operator shall immediately notify the division if the operator is unable to satisfy one or more of the financial test criteria set forth in the agreement. A failure to notify the division as required by this subparagraph is a violation of this chapter, subject to the civil penalties provided in Sections 3236.2 and 3236.5, the criminal penalties provided in Section 3236, and the cost recovery provided in Section 3236.6, and is grounds for termination of the additional security agreement pursuant to subparagraph (C).
(C)If the division determines, based on the information provided pursuant to subparagraphs (A) and (B), that self-insurance or a corporate guarantee is no longer an equally effective means of financial assurance, the division may terminate the additional security agreement at its sole discretion and require the operator to provide additional security in the form of an indemnity bond, a form of deposit described in Section 995.710 of the Code of Civil Procedure, or any other equally effective means of financial assurance approved by the division pursuant to paragraph (1). The division shall provide the operator with notice of termination and a requirement for additional security pursuant to subdivision (d), allowing the operator 180 days from service of the notice to satisfy the additional security requirement.
(D)The additional security agreement shall include a provision acknowledging that, in the event of operator insolvency, the person who was responsible as an owner or operator of the well or production facility before any transfer shall remain responsible for plugging and abandonment, decommissioning, and site restoration obligations pursuant to subdivision (c) of Section 3237 and identify all previous owners with residual liability dating back to January 1, 1996.
(E)Where applicable, the additional security agreement shall include a corporate guaranty agreement executed by the operators parent company, affiliate, or other controlling entity, guaranteeing the operators decommissioning obligations under the agreement. The division shall establish the criteria for a corporate guaranty agreement.
(F)The additional security agreement shall remain in full force and effect until the date on which the decommissioning obligations have been satisfied, and the division has provided a written release of the operators obligations under the agreement, or until the agreement is terminated by the division pursuant to subparagraph (C).
(4)The division shall reevaluate whether self-insurance or a corporate guarantee approved under this subdivision continues to constitute an equally effective means of financial assurance at least once every three years, or upon a material change in the financial condition of the operator or guarantor entity, whichever occurs first.
(g)(1)Any two or more operators may elect to enter into a liability sharing agreement.
(2)Operators that elect to participate in a liability sharing agreement shall be jointly and severally liable for all amounts owed under this chapter by all other operators that participate in the liability sharing agreement.
(3)The division shall treat all operators that participate in a liability sharing agreement as a single operator when requiring additional security under this section, except that the additional security required by the division shall not exceed the lesser of the divisions estimation of the reasonable costs of plugging and abandoning all of the participating operators wells and decommissioning any attendant production facilities in accordance with Section 3208, or the applicable amount identified in subdivision (a).
(4)A liability sharing agreement is formed when all of the participants have provided the division written notice of intent to participate in the liability sharing agreement with express acknowledgment of all other participants in the agreement.
(5)An operator may elect to withdraw from a liability sharing agreement at any time, but all participants in the liability sharing agreement, including the withdrawing participant, shall continue to be jointly and severally liable for all amounts owed under this chapter for a period of five years after the withdrawal.
SEC. 4.Section 3205.8 of the Public Resources Code is amended to read:3205.8.(a)(1)Notwithstanding any other provision of this chapter, a person who acquires the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, except a well that has an average daily production level that exceeds 15 barrels of oil or 60,000 cubic feet of natural gas during the 12 months preceding the date of acquisition or a natural gas storage well, shall, as soon as possible, but not later than the date when the acquisition of the well or production facility becomes final, file with the supervisor an individual indemnity bond for the well or production facility, or a blanket indemnity bond for multiple wells or production facilities, in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration pursuant to Section 3208 and regulations implementing this chapter.
(2)A person who acquires the right to operate more than one well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, or who operates more than one well or production facility may file with the supervisor one blanket indemnity bond to cover all the operations in any of its wells in the state in lieu of an individual indemnity bond for each operation. The blanket indemnity bond shall be executed by the operator, as principal, and by an authorized surety company, as surety, and shall be in substantially the same language and upon the same conditions as provided in Section 3204, except for the difference in the amount.
(b)A person who intends to acquire the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, shall submit a request to the supervisor for a determination of the amount of the bond required pursuant to subdivision (a) before completing the acquisition and shall not complete the acquisition until the determination is received and the bond has been filed with the supervisor.
(c)The supervisor shall determine the amount of an individual indemnity bond required pursuant to subdivision (a) based on the supervisors determination of the full costs of plugging and abandonment, decommissioning the facility, and site restoration using any reasonable method, including, but not limited to, consideration of the factors listed in subdivision (b) of Section 3205.3, or the cost estimation criteria described in subdivision (b) of Section 3205.7, or consultation with a contractor to obtain an estimate of the cost to plug and abandon the wells, decommission the facility, and complete site restoration. The supervisor shall determine the amount of a blanket indemnity bond required pursuant to subdivision (a) based on the sum total of combining the costs from the same determinations as individual indemnity bonds for each well or production facility covered by the blanket indemnity bond.
(d)(1)In lieu of the bond required to be provided pursuant to subdivision (a), the operator may, with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, which includes a deposit pursuant to Section 3205.5, an irrevocable letter of credit, a fully funded trust fund, a means of financial assurance listed in subdivision (f) of Section 3205.3, or any other equally effective means of financial assurance that has been approved by the division as described in paragraph (2). The required financial assurance may be obtained or funded by the transferor of the covered well.
(2)If an operator requests to use financial assurance listed in subdivision (f) of Section 3205.3, or any other equally effective means of financial assurance, the division shall approve the equally effective means of financial assurance in the same manner as described in paragraphs (1) to (3), inclusive, of subdivision (f) of Section 3205.3.
(e)(1)This section does not apply to a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility. facility pursuant to Section 3205.9.
(2)This subdivision does not affect any other requirement of this chapter, nor does it relieve a person of any other responsibility pursuant to this chapter.
(3)A person shall not use a well or production facility acquired for the sole purpose of plugging and abandoning that well or decommissioning that production facility pursuant to Section 3205.9 for oil or gas production or injection. production, injection, gas storage, or any associated operation.
(f)(1)This section shall not apply to an operator with operator, or to a person who acquires the right to operate or control a well or production facility, if the operator of record has obtained and maintained additional security approved by the division pursuant to Section 3205.3. 3205.3 and if the conditions in paragraph (2) are met. As applied to any additional wells acquired by the operator or to a person who acquires the right to operate or control a well or production facility with preexisting additional security pursuant to Section 3205.3, the operator or the person who acquires the right to operate or control a well or production facility shall update the additional security pursuant to subdivision (e) or (f) of Section 3205.3. For purposes of this section, if the person acquiring the right to operate or control a well or production facility is not the operator of record, compliance by the operator of record with Section 3205.3 shall be deemed compliance by the acquiring person.
(2)The operator or a person who acquires the right to operate or control a well or production facility qualifies for an exemption pursuant to this section for any transferred well or facility if the following conditions are met:
(A)The operator has in place and has been in consistent compliance with an idle well management plan pursuant to paragraph (2) of subdivision (a) of Section 3206. In the event an operator at any time subsequent to the transfer is determined by the supervisor after an annual performance review to be out of compliance with the idle well management plan, the operator shall be required to provide the financial assurance required under subdivision (a) within 90 days.
(B)Notwithstanding subparagraph (A), an operator who operates or owns 10 or fewer idle wells may either have in place and be in consistent compliance with an idle well management plan pursuant to paragraph (2) of subdivision (a) of Section 3206 or be in consistent compliance with idle well fee requirements pursuant to paragraph (1) of subdivision (a) Section 3206. In the event an operator subject to this subparagraph at any time subsequent to the transfer to be determined by the supervisor after an annual performance review to be out of compliance with the idle well management plan or fails to pay idle well fees due, the operator shall be required to provide the financial assurance required under subdivision (a) within 90 days.
(C)The operator is in full compliance with any schedule or requirement established by the supervisor for submission or initial or revised reports pursuant to Section 3205.7.
(g)An operator who acquires a well under the exemption described in subdivision (f) shall update their additional security to reflect the added asset retirement obligations associated with the well within 36 months of the date of the acquisition to ensure that the financial assurance maintained by the operator continues to reflect the operators decommissioning obligations as determined by the division.
(h)This section does not relieve an operator or prior operator of their statutory liability to fully fund and execute the plugging and abandonment of a well, nor does this section limit the supervisors authority to pursue cost recovery, civil penalties, or other enforcement actions to protect state taxpayers.
(i)The department shall post on its internet website the information on all indemnity bond determinations made by the supervisor, and shall include for each determination the bond amount and calculations used.
SEC. 5.Section 3205.9 is added to the Public Resources Code, to read:3205.9.(a)(1)A person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility for the purposes of redevelopment or satisfaction of obligations as a prior operator of record under subdivision (c) of Section 3237 shall not be subject to any of the requirements of Section 3205.8, but shall file a bond as required under Section 3204, 3205, 3205.1, or 3205.2, as applicable. applicable, as part of a redevelopment pilot program established by this section or in connection with satisfaction of obligations as a prior operator of record under subdivision (c) of Section 3237.
(2)A person described in paragraph (1) shall be subject to the requirements of this chapter as an operator of the well or production facility, until either of the following occur:
(A)The supervisor determines that the well has been properly plugged and abandoned and the production facilities have been decommissioned in accordance with Section 3208.
(B)As applied to work conducted in accordance with the approvals given by the supervisor under Section 3229, the supervisor subsequently determines that additional work is not practical or would pose greater environmental or safety risk.
(3)Upon a determination by the supervisor pursuant to subparagraph (A) or (B) of paragraph (2), the supervisor shall release the bond, and the acquiring person shall have no further obligation or liability for the well or facility.
(b)Notwithstanding subdivision (a), a person who was responsible, under Section 3226 or 3237, as an owner or operator of the well or production facility before an acquisition described under subdivision (a), shall remain responsible for the well or production facility and any unfunded costs associated with plugging and abandonment of the well or decommissioning of the facility pursuant to Section 3208.
(c)Use of a well or production facility acquired under this section for purposes of oil or gas production or injection production, injection, gas storage, or any associated operation is prohibited.
(d)(1)A person acquiring the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility for the purposes of redevelopment shall, before completing the acquisition, submit to the supervisor both of the following:
(A)A declaration, under penalty of perjury, stating that the acquisition is for the sole purpose of plugging and abandoning the well or decommissioning the production facility, facility for the purposes of redevelopment, a description of the redevelopment plan, including the zoning status of the property, and that the acquiring person does not intend to use the well or production facility for oil or gas production or injection. production, injection, gas storage, or any associated operation.
(B)A plugging and abandonment work plan that includes the anticipated timeline for commencing and completing plugging and abandonment or decommissioning operations.
(2)An acquiring person who submits a declaration pursuant to subparagraph (A) of paragraph (1) shall commence plugging and abandonment or decommissioning operations within 24 months of the date of acquisition, unless the acquisition. The supervisor may grant a 12-month extension if the supervisor determines that a longer period is warranted based on permitting timelines, site conditions, contractor availability, or other factors beyond the acquiring persons control. factors.
(3)If an acquiring person fails to commence operations within the period described in paragraph (2), the supervisor may shall require the acquiring person to file financial assurance pursuant to Section 3205.8.
(4)This subdivision does not limit the supervisors existing authority to order an operator to plug and abandon a well and decommission facilities pursuant to this chapter.
(5)(A)An acquiring person shall provide to the supervisor at least once annually an update on progress toward completing the plugging and abandonment work plan pursuant to subparagraph (B) of paragraph (1). The supervisor may require more frequent updates at the supervisors discretion.
(B)If the supervisor determines that the person who has acquired the well or wells is not capable of plugging the wells within the timeframe established in paragraph (2), the supervisor shall notify the prior operator who is responsible for the plugging and abandonment under Section 3237 of the risk, and shall require the person who acquired the wells to post bonds consistent with Section 3205.8.
(e)No more than 100 wells or associated production facilities are eligible to be added to and participate in the redevelopment pilot program established in this section annually.
(f)For the purposes of this section, the following definitions apply:
(1)Redevelopment means redeveloping the property on which the well or production facility is located to a use unrelated to oil and gas development, production, waste disposal, or associated activity.
(2)Redevelopment pilot program means the authorization to exempt a person from the requirements of Section 3205.8 pursuant to the conditions of this section for purposes of redevelopment.
SEC. 6.Section 3205.10 is added to the Public Resources Code, to read:3205.10.(a)On and after January 1, 2028, and quarterly thereafter, the division shall include in its annual report to the Legislature, post on its internet website, as part of the divisions existing reporting on well transfer activity and financial assurance, assurance, pursuant to subdivision (i) of Section 3205.8, information regarding all of the following:
(1)The number and location of wells and production facilities transferred pursuant to Section 3205.8, including transfers for which alternative financial assurance was provided in lieu of an indemnity bond. bond for the previous quarter.
(2)The number and location of wells and production facilities acquired for the sole purpose of plugging and abandoning that well or decommissioning the production facility pursuant to Section 3205.9, 3205.9 for the previous quarter, and the status of plugging and abandonment or decommissioning operations for those wells and facilities. facilities at the end of the previous quarter.
(3)A description of any wells or production facilities described in paragraph (1) or (2) that are located in, or within one mile of, a disadvantaged community as identified pursuant to Section 39711 of the Health and Safety Code.
(b)The information reported pursuant to this section shall be based on data available to the division and shall not require the division to conduct new studies or analysis beyond those already required under this chapter.
(c)The director and the supervisor shall annually attend a legislative hearing held by either the Senate Committee on Natural Resources and Water or the Assembly Committee on Natural Resources to report on well transfer activity, implementation and status of financial assurance for indemnification, the redevelopment pilot program established pursuant to Section 3205.9, and other related topics.
(d)(1)On or before January 1, 2032, the division shall prepare and submit a report to the relevant legislative policy and budget committees in both houses of the Legislature that includes, but is not limited to, the following information:
(A)The quarterly data required to be posted online pursuant to subdivision (a) compiled and reported by calendar year.
(B)The information required to be posted online pursuant to subdivision (i) of Section 3205.8 reported by calendar year.
(C)The current total liabilities reported pursuant to subdivision (a) of Section 3205.7, and the total amount of indemnity bonds or other financial surety provided to the division pursuant to Sections 3204, 3205, 3205.1, 3205.2, 3205.3, 3205.6, and 3205.8.
(2)A report submitted pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative January 1, 2036.
SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 8.This act shall become operative only if Assembly Bill 2461 of the 202526 Regular Session is enacted and becomes effective on or before January 1, 2027.
The Legislature finds and declares all of the following:
(a)When signing Assembly Bill 1167 (AB 1167) of the 202324 Regular Session (Chapter 359 of the Statutes of 2023), the Governor cautioned that new financial assurances requirements for oil and gas well transfers may create a risk of current operators deserting hazardous wells, wells and stated his intent to work with the Legislature to enact revisions necessary to address that risk and to align the statute with existing and developing programs administered by the Department of Conservations Geologic Energy Management Division (CalGEM).
(b)Since the enactment of AB 1167, oil and gas operators have, in nearly all cases, been unable to transfer producing or idle wells, resulting in a substantial reduction in the market value and liquidity of those assets, and adding to the risk cited by the Governor and the Department of Finance that the legislation could result in additional oil and gas well desertions.
(c)The impairment of well transferability has constrained many operators ability to access capital needed to maintain facilities, comply with regulatory requirements, and responsibly plan for decommissioning and asset retirement obligations.
(d)The resulting reduction in asset value and access to capital has increased the risk that wells may remain with operators lacking the financial capacity to maintain or properly abandon them, thereby elevating the risk of well desertion identified by the Department of Finance analysis and by the Governor at the time AB 1167 was signed.
(e)At the time AB 1167 was enacted, Section 3237 of the Public Resources Code already provided that an operator transferring a well after January 1, 1996, remains liable for plugging and abandonment obligations if the acquiring operator becomes insolvent or otherwise fails to meet those obligations.
(f)Existing law authorizes CalGEM to order responsible operators to plug and abandon wells and, if an operator fails to do so, to perform that work using industry fee revenue and to recover costs through reimbursement requirements, civil penalties, liens, and other enforcement mechanisms, through which the state has recovered more than $25,000,000 from responsible operators in the last few years alone.
(g)Pursuant to Section 3237 of the Public Resources Code, operators transferring wells have regularly required acquiring operators to establish sinking funds or similar financial arrangements to ensure sufficient resources are available to meet future asset retirement obligations when wells are no longer economically productive.
(h)Using the authority established by Assembly Bill 1057 (AB 1057) of the 201920 Regular Session (Chapter 771 of the Statutes of 2019), CalGEM significantly strengthened Californias financial assurance framework and secured tens of millions of dollars in additional bonding and other financial assurance mechanisms to ensure that oil and gas operators decommissioning responsibilities are adequately funded at the end of the economic life of their facilities.
(i)The State of California is eligible for $165,000,000 in federal funds from the orphan well program authorized by the bipartisan Infrastructure Investment and Jobs Act (Public Law 117-58), of which over $25,000,000 has already been encumbered and spent to plug wells in California, with more to come.
(j)Assembly Bill 2729 (AB 2729) of the 201516 Regular Session (Chapter 272 of the Statutes of 2016) established a comprehensive framework for the management and remediation of idle wells, and subsequent legislation has built upon that framework to accelerate idle well remediation and reduce long-term risks associated with prolonged well inactivity.
(k)Following the enactment of AB 1167, the Legislature passed and the Governor signed Assembly Bill 1866 (AB 1866) of the 202324 Regular Session (Chapter 548 of the Statutes of 2024), which built upon the idle well framework established by AB 2729 by strengthening idle well management requirements and contributing to continued significant reductions in idle well inventories, resulting in the lowest proportion of idle wells in operator portfolios in decades.
(l)The cumulative effect of AB 2729, AB 1057, AB 1866, and related statutes demonstrates that California has made substantial progress in reducing idle and orphaned wells while strengthening financial assurance requirements for oil and gas operators. Operators have plugged over 12,000 idle wells in the last three years alone.
(m)Severely restricting the transferability of oil and gas assets has produced unintended consequences that undermine business valuations, reduce income, and impair the financial stability of remaining operators, without advancing the states existing idle well and decommissioning objectives.
(n)These unintended consequences demonstrated by more than two years of data are now evident and warrant legislative action.
(o)It is therefore necessary and appropriate to enact revisions consistent with the Governors October 7, 2023, signing message for AB 1167 in order to mitigate the risk of well desertion, preserve responsible asset stewardship, and better align statutory requirements with existing regulatory programs administered by CalGEM.
SEC. 2.Section 3017 of the Public Resources Code is amended to read:3017.(a)It is the intent of the Legislature that the oil and gas industry pay for all necessary costs of plugging and abandonment and site restoration of oil and gas wells.
(b)It is the intent of the legislature Legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless adequate financial assurance to cover the full cost of plugging and abandonment and site restoration has been provided, except when the well is being transferred for the sole purpose of plugging and abandoning the well or decommissioning the attendant production facility.
SEC. 3.Section 3205.3 of the Public Resources Code is amended to read:3205.3.(a)(1)The division may require an operator filing an individual indemnity bond pursuant to Section 3204 or a blanket indemnity bond pursuant to Section 3205, as applicable, to provide an additional amount of security acceptable to the division based on the divisions evaluation of the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources. The additional security required by the division shall not exceed the lesser of the divisions estimation of the reasonable costs of properly plugging and abandoning all of the operators wells and decommissioning any attendant production facilities in accordance with Section 3208, or thirty million dollars ($30,000,000). the maximum amount established pursuant to paragraph (2).
(2)The applicable maximum amount of additional security shall be determined based on the total number of active and idle wells under the control of the operator, as follows:
(A)Thirty million dollars ($30,000,000) for an operator having 4,000 or fewer active and idle wells in the state.
(B)For an operator having more than 4,000, but no more than 10,000, active and idle wells in the state, the following amounts shall apply:
(i)On and after January 1, 2028, to December 31, 2029, inclusive, thirty-five million dollars ($35,000,000).
(ii)On and after January 1, 2030, to December 31, inclusive, 2031, forty million dollars ($40,000,000).
(iii)On and after January 1, 2032, fifty million dollars ($50,000,000).
(C)For an operator having more than 10,000 active and idle wells in the state, the following amounts shall apply:
(i)On and after January 1, 2028, to December 31, 2029, inclusive, forty-five million dollars ($45,000,000).
(ii)On and after January 1, 2030, to December 31, 2031, inclusive, sixty million dollars ($60,000,000).
(iii)On and after January 1, 2032, eighty million dollars ($80,000,000).
(D)Notwithstanding subparagraphs (A) to (C), inclusive, the division shall not increase the amount of additional security required of an operator that had an additional security agreement approved by the division pursuant to this section in effect as of January 1, 2027, until five years after the effective date of the agreement. Upon expiration of the five-year period, the division may increase the amount of additional security required of the operator to an amount not exceeding the applicable maximum amount determined pursuant to subparagraphs (A) to (C), inclusive, subject to the notice requirements of subdivision (d).
(b)When making an estimation under this section of the reasonable costs of properly plugging and abandoning an operators well or wells and decommissioning any attendant production facilities, the division shall provide the operator with an opportunity to submit the operators own estimation and shall consider all of the following:
(1)The depth of the well or wells.
(2)The accessibility and surroundings of the well or wells and any attendant production facilities.
(3)Available information about the condition of the well or wells and any attendant production facilities.
(4)Available information about the cost to plug and abandon a comparable well or wells.
(5)Available information about the cost to decommission production facilities comparable to the production facilities attendant to the well or wells.
(6)The operators cost estimates, if provided.
(7)Whether the operator is a public utility gas corporation, as defined in subdivision (a) of Section 216 of the Public Utilities Code.
(8)Any other information that the division determines to be relevant to the estimation of cost.
(c)The division, in evaluating the risk that the operator will desert its well or wells and the potential threats the operators well or wells pose to life, health, property, and natural resources, shall consider all of the following:
(1)The difference between the estimation of reasonable costs of plugging and abandonment under subdivisions (a) and (b) and the total amount of indemnity bonds or other financial assurances in place to ensure funding of the plugging and abandonment of the operators well or wells.
(2)The level of current production from the well or wells.
(3)Available information regarding estimated reserves remaining in place associated with the well or wells.
(4)Whether the well or wells are critical, are environmentally sensitive, or are in an urban area, as those terms are defined by the division in regulation.
(5)To the extent that relevant information is available to the division, the financial status of the operator and the operators financial capacity to plug and abandon all of the operators wells.
(6)The past record of compliance by the operator with the division.
(7)The number of idle wells to be covered by the indemnity bond and the operators record of compliance with the requirements of Section 3206 and the divisions regulations related to the management of idle wells.
(8)Whether the operators well or wells are subject to any bonding or financial assurance requirements by a local government.
(9)Whether the operators well or wells are already subject to additional bond coverage by the division pursuant to Section 3270.4.
(10)Any other information that the division determines to be relevant to the evaluation of the risk. risk, including industrywide financial trends, which shall include, but is not necessarily limited to, those trends affecting the solvency and creditworthiness of oil and gas operators in California.
(d)The division shall provide the operator with notice of the requirement to provide additional security, and the notice shall be served by personal service or certified mail. The operator shall provide the additional security within 180 days of service of notice. The notice shall include an explanation of the divisions estimation of the reasonable costs to plug and abandon the operators well or wells and of the basis for the decision to require the operator to provide additional security. The requirements of this subdivision shall also apply to any subsequent increase in the amount of additional security required under subdivision (e).
(e)The division shall increase or decrease the amount of additional security required under this section to account for changed circumstances or new information. The operator may, at any time, petition the division to reevaluate the divisions evaluation of the risk or cost estimates, and the division shall respond to the petition in writing within 60 days of receipt of the petition.
(f)(1)An operator shall provide additional security required under this section in the form of an indemnity bond, a form of deposit described in Section 995.710 of the Code of Civil Procedure, or any other equally effective means of financial assurance approved by the division. Examples of equally effective means of financial assurance that the division may consider for approval include a letter of credit, a corporate guarantee, a trust fund, or a demonstration of self-insurance.
(2)The division may only approve self-insurance as an equally effective means of financial assurance if the operator provides detailed financial information demonstrating to the divisions satisfaction that, based on the considerations under subdivision (c), the risks associated with the operators potential for desertion of its well or wells are low. low, and only if the approval is conditioned upon all of the requirements established pursuant to paragraph (3). If the division approves self-insurance as an equally effective means of financial assurance, at least once every five years the operator shall update the supporting financial information and the division shall reevaluate whether self-insurance continues to be an equally effective means of financial assurance. If an operator provides financial information to the division under this section that is not otherwise publicly available, the division shall maintain the information as confidential.
(3)An approval of self-insurance or a corporate guarantee under paragraph (2) shall be set forth in an additional security agreement between the operator and the division and shall be conditioned upon all of the following requirements:
(A)The additional security agreement shall include an enforceable schedule for the plugging and abandonment of wells and decommissioning of production facilities consistent with the operators decommissioning obligations under paragraph (2) of subdivision (a) of Section 3206. An operator without an approved idle well management plan or who is out of compliance with its idle well management plan shall be ineligible for self-insurance.
(B)The operator shall provide to the division the previous years certified reserve reports and audited financial statements, including balance sheets and income statements. If audited financial statements are not available, the operator shall provide financial statements certified by the operators chief financial officer. The additional security agreement shall include financial criteria that the operator shall satisfy for the duration of the agreement. The financial criteria set forth in the agreement may address the operators bond ratings, debt-to-equity ratios, liquidity, cash return on liabilities, net profitability, minimum net worth, remaining economic life of production fields or leases, and any other financial indicators the division determines are relevant to the evaluation of the operators risk of desertion under subdivision (c). The operator shall immediately notify the division if the operator is unable to satisfy one or more of the financial test criteria set forth in the agreement. A failure to notify the division as required by this subparagraph is a violation of this chapter, subject to the civil penalties provided in Sections 3236.2 and 3236.5, the criminal penalties provided in Section 3236, and the cost recovery provided in Section 3236.6, and is grounds for termination of the additional security agreement pursuant to subparagraph (C).
(C)If the division determines, based on the information provided pursuant to subparagraphs (A) and (B), that self-insurance or a corporate guarantee is no longer an equally effective means of financial assurance, the division may terminate the additional security agreement at its sole discretion and require the operator to provide additional security in the form of an indemnity bond, a form of deposit described in Section 995.710 of the Code of Civil Procedure, or any other equally effective means of financial assurance approved by the division pursuant to paragraph (1). The division shall provide the operator with notice of termination and a requirement for additional security pursuant to subdivision (d), allowing the operator 180 days from service of the notice to satisfy the additional security requirement.
(D)The additional security agreement shall include a provision acknowledging that, in the event of operator insolvency, the person who was responsible as an owner or operator of the well or production facility before any transfer shall remain responsible for plugging and abandonment, decommissioning, and site restoration obligations pursuant to subdivision (c) of Section 3237 and identify all previous owners with residual liability dating back to January 1, 1996.
(E)Where applicable, the additional security agreement shall include a corporate guaranty agreement executed by the operators parent company, affiliate, or other controlling entity, guaranteeing the operators decommissioning obligations under the agreement.
(F)The additional security agreement shall remain in full force and effect until the date on which the decommissioning obligations have been satisfied, and the division has provided a written release of the operators obligations under the agreement, or until the agreement is terminated by the division pursuant to subparagraph (C).
(4)The division shall reevaluate whether self-insurance or a corporate guarantee approved under this subdivision continues to constitute an equally effective means of financial assurance at least once every three years, or upon a material change in the financial condition of the operator or guarantor entity, whichever occurs first.
(g)(1)Any two or more operators may elect to enter into a liability sharing agreement.
(2)Operators that elect to participate in a liability sharing agreement shall be jointly and severally liable for all amounts owed under this chapter by all other operators that participate in the liability sharing agreement.
(3)The division shall treat all operators that participate in a liability sharing agreement as a single operator when requiring additional security under this section, except that the additional security required by the division shall not exceed the lesser of the divisions estimation of the reasonable costs of plugging and abandoning all of the participating operators wells and decommissioning any attendant production facilities in accordance with Section 3208, or thirty million dollars ($30,000,000). the applicable amount identified in subdivision (a).
(4)A liability sharing agreement is formed when all of the participants have provided the division written notice of intent to participate in the liability sharing agreement with express acknowledgment of all other participants in the agreement.
(5)An operator may elect to withdraw from a liability sharing agreement at any time, but all participants in the liability sharing agreement, including the withdrawing participant, shall continue to be jointly and severally liable for all amounts owed under this chapter for a period of five years after the withdrawal.
SEC. 3.SEC. 4.Section 3205.8 of the Public Resources Code is amended to read:3205.8.(a)(1)Notwithstanding any other provision of this chapter, a person who acquires the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, except a well that has an average daily production level that exceeds 15 barrels of oil or 60,000 cubic feet of natural gas during the 12 months preceding the date of acquisition or a natural gas storage well, shall, as soon as possible, but not later than the date when the acquisition of the well or production facility becomes final, file with the supervisor an individual indemnity bond for the well or production facility, or a blanket indemnity bond for multiple wells or production facilities, in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration pursuant to Section 3208 and regulations implementing this chapter.
(2)A person who acquires the right to operate more than one well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, or who operates more than one well or production facility may file with the supervisor one blanket indemnity bond to cover all the operations in any of its wells in the state in lieu of an individual indemnity bond for each operation. The blanket indemnity bond shall be executed by the operator, as principal, and by an authorized surety company, as surety, and shall be in substantially the same language and upon the same conditions as provided in Section 3204, except for the difference in the amount.
(b)A person who intends to acquire the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, shall submit a request to the supervisor for a determination of the amount of the bond required pursuant to subdivision (a) before completing the acquisition and shall not complete the acquisition until the determination is received and the bond has been filed with the supervisor.
(c)The supervisor shall determine the amount of an individual indemnity bond required pursuant to subdivision (a) based on the supervisors determination of the full costs of plugging and abandonment, decommissioning the facility, and site restoration using any reasonable method, including, but not limited to, consideration of the factors listed in subdivision (b) of Section 3205.3, or the cost estimation criteria described in subdivision (b) of Section 3205.7, or consultation with a contractor to obtain an estimate of the cost to plug and abandon the wells, decommission the facility, and complete site restoration. The supervisor shall determine the amount of a blanket indemnity bond required pursuant to subdivision (a) based on the sum total of combining the costs from the same determinations as individual indemnity bonds for each well or production facility covered by the blanket indemnity bond.
(d)(1)In lieu of the bond required to be provided pursuant to subdivision (a), the operator may, with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, which includes a deposit pursuant to Section 3205.5, an irrevocable letter of credit, a fully funded trust fund, a means of financial assurance listed in subdivision (f) of Section 3205.3, or any other equally effective means of financial assurance that has been approved by the division as described in paragraph (2). The required financial assurance may be obtained or funded by the transferor of the covered well.
(2)The If an operator requests to use financial assurance listed in subdivision (f) of Section 3205.3, or any other equally effective means of financial assurance, the division may shall approve the equally effective means of financial assurance in the same manner as described in paragraphs (1) and (2) to (3), inclusive, of subdivision (f) of Section 3205.3.
(e)(1)This section does not apply to a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility.
(2)This subdivision does not affect any other requirement of this chapter, nor does it relieve a person of any other responsibility pursuant to this chapter.
(3)A person shall not use a well or production facility acquired for the sole purpose of plugging and abandoning that well or decommissioning that production facility for oil or gas production or injection.
(f)This section shall not apply to operators an operator with additional security approved by the division pursuant to Section 3205.3. As applied to any additional wells acquired by the operator with preexisting additional security pursuant to Section 3205.3, the operator shall update the additional security pursuant to subdivision (e) or (f) of Section 3205.3.(g)An operator who acquires a well under the exemption described in subdivision (f) shall update their additional security to reflect the added asset retirement obligations associated with the well within 36 months of the date of the acquisition to ensure that the financial assurance maintained by the operator continues to reflect the operators decommissioning obligations as determined by the division.
(h)This section does not relieve an operator or prior operator of their statutory liability to fully fund and execute the plugging and abandonment of a well, nor does this section limit the supervisors authority to pursue cost recovery, civil penalties, or other enforcement actions to protect state taxpayers.
(g)(i)The department shall post on its internet website the information on all indemnity bond determinations made by the supervisor, and shall include for each determination the bond amount and calculations used.
SEC. 4.SEC. 5.Section 3205.9 is added to the Public Resources Code, to read:3205.9.(a)(1)A person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility shall not be subject to any of the requirements of Section 3205.8, but shall file a bond as required under Section 3204, 3205, 3205.1, or 3205.2, as applicable.
(2)A person described in paragraph (1) shall be subject to the requirements of this chapter as an operator of the well or production facility, until either of the following occur:
(A)The supervisor determines that the well has been properly plugged and abandoned and the production facilities have been decommissioned in accordance with Section 3208.
(B)As applied to work conducted in accordance with the approvals given by the supervisor under Section 3229, the supervisor subsequently determines that additional work is not practical or would pose greater environmental or safety risk.
(3)Upon a determination by the supervisor pursuant to subparagraph (A) or (B) of paragraph (2), the supervisor shall release the bond, and the acquiring person shall have no further obligation or liability for the well or facility.
(b)Notwithstanding subdivision (a), a person who was responsible, under Section 3226 or 3237, as an owner or operator of the well or production facility before an acquisition described under subdivision (a), shall remain responsible for the well or production facility. facility and any unfunded costs associated with plugging and abandonment of the well or decommissioning of the facility pursuant to Section 3208.
(c)Use of a well or production facility acquired under this section for purposes of oil or gas production or injection is prohibited.
(d)(1)A person acquiring the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility shall, before completing the acquisition, submit to the supervisor both of the following:
(A)A declaration, under penalty of perjury, stating that the acquisition is for the sole purpose of plugging and abandoning the well or decommissioning the production facility, and that the acquiring person does not intend to use the well or production facility for oil or gas production or injection.
(B)A plugging and abandonment work plan that includes the anticipated timeline for commencing and completing plugging and abandonment or decommissioning operations.
(2)An acquiring person who submits a declaration pursuant to subparagraph (A) of paragraph (1) shall commence plugging and abandonment or decommissioning operations within 24 months of the date of acquisition, unless the supervisor determines that a longer period is warranted based on permitting timelines, site conditions, contractor availability, or other factors beyond the acquiring persons control.
(3)If an acquiring person fails to commence operations within the period described in paragraph (2), the supervisor may require the acquiring person to file financial assurance pursuant to Section 3205.8.
(4)This subdivision does not limit the supervisors existing authority to order an operator to plug and abandon a well pursuant to this chapter.
SEC. 6.Section 3205.10 is added to the Public Resources Code, to read:3205.10.(a)On and after January 1, 2028, the division shall include in its annual report to the Legislature, as part of the divisions existing reporting on well transfer activity and financial assurance, information regarding all of the following:
(1)The number and location of wells and production facilities transferred pursuant to Section 3205.8, including transfers for which alternative financial assurance was provided in lieu of an indemnity bond.
(2)The number and location of wells and production facilities acquired for the sole purpose of plugging and abandoning that well or decommissioning the production facility pursuant to Section 3205.9, and the status of plugging and abandonment or decommissioning operations for those wells and facilities.
(3)A description of any wells or production facilities described in paragraph (1) or (2) that are located in, or within one mile of, a disadvantaged community as identified pursuant to Section 39711 of the Health and Safety Code.
(b)The information reported pursuant to this section shall be based on data available to the division and shall not require the division to conduct new studies or analysis beyond those already required under this chapter.
SEC. 5.SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 8.This act shall become operative only if Assembly Bill 2461 of the 202526 Regular Session is enacted and becomes effective on or before January 1, 2027.
The Legislature finds and declares all of the following:
(a)When signing Assembly Bill 1167 (AB 1167) of the 202324 Regular Session (Chapter 359 of the Statutes of 2023), the Governor cautioned that new financial assurances requirements for oil and gas well transfers may create a risk of current operators deserting hazardous wells, and stated his intent to work with the Legislature to enact revisions necessary to address that risk and to align the statute with existing and developing programs administered by the Department of Conservations Geologic Energy Management Division (CalGEM).
(b)Since the enactment of AB 1167, oil and gas operators have, in nearly all cases, been unable to transfer producing or idle wells, resulting in a substantial reduction in the market value and liquidity of those assets, and adding to the risk cited by the Governor and the Department of Finance that the legislation could result in additional oil and gas well desertions.
(c)The impairment of well transferability has constrained many operators ability to access capital needed to maintain facilities, comply with regulatory requirements, and responsibly plan for decommissioning and asset retirement obligations.
(d)The resulting reduction in asset value and access to capital has increased the risk that wells may remain with operators lacking the financial capacity to maintain or properly abandon them, thereby elevating the risk of well desertion identified by the Department of Finance analysis and by the Governor at the time AB 1167 was signed.
(e)At the time AB 1167 was enacted, Section 3237 of the Public Resources Code already provided that an operator transferring a well after January 1, 1996, remains liable for plugging and abandonment obligations if the acquiring operator becomes insolvent or otherwise fails to meet those obligations.
(f)Existing law authorizes CalGEM to order responsible operators to plug and abandon wells and, if an operator fails to do so, to perform that work using industry fee revenue and to recover costs through reimbursement requirements, civil penalties, liens, and other enforcement mechanisms, through which the state has recovered more than $25,000,000 from responsible operators in the last few years alone.
(g)Pursuant to Section 3237 of the Public Resources Code, operators transferring wells have regularly required acquiring operators to establish sinking funds or similar financial arrangements to ensure sufficient resources are available to meet future asset retirement obligations when wells are no longer economically productive.
(h)Using the authority established by Assembly Bill 1057 (AB 1057) of the 201920 Regular Session (Chapter 771 of the Statutes of 2019), CalGEM significantly strengthened Californias financial assurance framework and secured tens of millions of dollars in additional bonding and other financial assurance mechanisms to ensure that oil and gas operators decommissioning responsibilities are adequately funded at the end of the economic life of their facilities.
(i)The State of California is eligible for $165,000,000 in federal funds from the orphan well program authorized by the bipartisan Infrastructure Investment and Jobs Act (Public Law 117-58), of which over $25,000,000 has already been encumbered and spent to plug wells in California, with more to come.
(j)Assembly Bill 2729 (AB 2729) of the 201516 Regular Session (Chapter 272 of the Statutes of 2016) established a comprehensive framework for the management and remediation of idle wells, and subsequent legislation has built upon that framework to accelerate idle well remediation and reduce long-term risks associated with prolonged well inactivity.
(k)Following the enactment of AB 1167, the Legislature passed and the Governor signed Assembly Bill 1866 (AB 1866) of the 202324 Regular Session (Chapter 548 of the Statutes of 2024), which built upon the idle well framework established by AB 2729 by strengthening idle well management requirements and contributing to continued significant reductions in idle well inventories, resulting in the lowest proportion of idle wells in operator portfolios in decades.
(l)The cumulative effect of AB 2729, AB 1057, AB 1866, and related statutes demonstrates that California has made substantial progress in reducing idle and orphaned wells while strengthening financial assurance requirements for oil and gas operators. Operators have plugged over 12,000 idle wells in the last three years alone.
(m)Severely restricting the transferability of oil and gas assets has produced unintended consequences that undermine business valuations, reduce income, and impair the financial stability of remaining operators, without advancing the states existing idle well and decommissioning objectives.
(n)These unintended consequences demonstrated by more than two years of data are now evident and warrant legislative action.
(o)It is therefore necessary and appropriate to enact revisions consistent with the Governors October 7, 2023, signing message for AB 1167 in order to mitigate the risk of well desertion, preserve responsible asset stewardship, and better align statutory requirements with existing regulatory programs administered by CalGEM.
SEC. 2.Section 3017 of the Public Resources Code is amended to read:3017.(a)It is the intent of the Legislature that the oil and gas industry pay for all necessary costs of plugging and abandonment and site restoration of oil and gas wells.
(b)It is the intent of the legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless a bond has been filed that would adequate financial assurance to cover the full cost of plugging and abandonment and site restoration. restoration has been provided, except when the well is being transferred for the sole purpose of plugging and abandoning the well or decommissioning the attendant production facility.
SECTION 1.SEC. 3.Section 3205.8 of the Public Resources Code is amended to read:3205.8.(a)(1)Notwithstanding any other provision of this chapter, a person who acquires the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, except a well that has an average daily production level that exceeds 15 barrels of oil or 60,000 cubic feet of natural gas during the 12 months preceding the date of acquisition or a natural gas storage well, shall, as soon as possible, but not later than the date when the acquisition of the well or production facility becomes final, file with the supervisor an individual indemnity bond for the well or production facility, or a blanket indemnity bond for multiple wells or production facilities, in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration pursuant to Section 3208 and regulations implementing this chapter.
(2)A person who acquires the right to operate more than one well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, or who operates more than one well or production facility may file with the supervisor one blanket indemnity bond to cover all the operations in any of its wells in the state in lieu of an individual indemnity bond for each operation. The blanket indemnity bond shall be executed by the operator, as principal, and by an authorized surety company, as surety, and shall be in substantially the same language and upon the same conditions as provided in Section 3204, except for the difference in the amount.
(b)A person who intends to acquire the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, shall submit a request to the supervisor for a determination of the amount of the bond required pursuant to subdivision (a) before completing the acquisition and shall not complete the acquisition until the determination is received and the bond has been filed with the supervisor.
(c)The supervisor shall determine the amount of an individual indemnity bond required pursuant to subdivision (a) based on the supervisors determination of the full costs of plugging and abandonment, decommissioning the facility, and site restoration using any reasonable method, including, but not limited to, consideration of the factors listed in subdivision (b) of Section 3205.3, or the cost estimation criteria described in subdivision (b) of Section 3205.7, or consultation with a contractor to obtain an estimate of the cost to plug and abandon the wells, decommission the facility, and complete site restoration. The supervisor shall determine the amount of a blanket indemnity bond required pursuant to subdivision (a) based on the sum total of combining the costs from the same determinations as individual indemnity bonds for each well or production facility covered by the blanket indemnity bond.
(d)(1)In lieu of the bond required to be provided pursuant to subdivision (a), the operator may, with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, which includes a deposit pursuant to Section 3205.5, an irrevocable letter of credit, a fully funded trust fund, a means of financial assurance listed in subdivision (f) of Section 3205.3, or any other equally effective means of financial assurance that has been approved by the division as described in paragraph (2). The required financial assurance may be obtained or funded by the transferor of the covered well.
(2)The division may approve equally effective means of financial assurance in the same manner as described in paragraphs (1) and (2) of subdivision (f) of Section 3205.3.
(e)(1)This section does not a apply to a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility.
(2)This subdivision does not affect any other requirement of this chapter, nor does it relieve a person of any other responsibility pursuant to this chapter.
(3)A person shall not use a well or production facility acquired for the sole purpose of plugging and abandoning that well or decommissioning that production facility for oil or gas production or injection.
(f)This section shall not apply to operators with additional security approved by the division pursuant to Section 3205.3. As applied to any additional wells acquired by the operator with preexisting additional security pursuant to Section 3205.3, the operator shall update the additional security pursuant to subdivision (e) or (f) of Section 3205.3.
(f)(g)The department shall post on its internet website the information on all indemnity bond determinations made by the supervisor, and shall include for each determination the bond amount and calculations used.
SEC. 4.Section 3205.9 is added to the Public Resources Code, to read:3205.9.(a)(1)A person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility shall not be subject to any of the requirements of Section 3205.8, but shall file a bond as required under Section 3204, 3205, 3205.1, or 3205.2, as applicable.
(2)A person described in paragraph (1) shall be subject to the requirements of this chapter as an operator of the well or production facility, until either of the following occur:
(A)The supervisor determines that the well has been properly plugged and abandoned and the production facilities have been decommissioned in accordance with Section 3208.
(B)As applied to work conducted in accordance with the approvals given by the supervisor under Section 3229, the supervisor subsequently determines that additional work is not practical or would pose greater environmental or safety risk.
(3)Upon a determination by the supervisor pursuant to subparagraph (A) or (B) of paragraph (2), the supervisor shall release the bond, and the acquiring person shall have no further obligation or liability for the well or facility.
(b)Notwithstanding subdivision (a), a person who was responsible, under Section 3226 or 3237, as an owner or operator of the well or production facility before an acquisition described under subdivision (a), shall remain responsible for the well or production facility.
(c)Use of a well or production facility acquired under this section for purposes of oil or gas production or injection is prohibited.
SEC. 2.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Notwithstanding any other provision of this chapter, a person who acquires the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, except a well that has an average daily production level that exceeds 15 barrels of oil or 60,000 cubic feet of natural gas during the 12 months preceding the date of acquisition or a natural gas storage well, shall, as soon as possible, but not later than the date when the acquisition of the well or production facility becomes final, file with the supervisor an individual indemnity bond for the well or production facility, or a blanket indemnity bond for multiple wells or production facilities, in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration pursuant to Section 3208 and regulations implementing this chapter.
(2)A person who acquires the right to operate more than one well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, or who operates more than one well or production facility may file with the supervisor one blanket indemnity bond to cover all the operations in any of its wells in the state in lieu of an individual indemnity bond for each operation. The blanket indemnity bond shall be executed by the operator, as principal, and by an authorized surety company, as surety, and shall be in substantially the same language and upon the same conditions as provided in Section 3204, except for the difference in the amount.
(b)A person who intends to acquire the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, shall submit a request to the supervisor for a determination of the amount of the bond required pursuant to subdivision (a) before completing the acquisition and shall not complete the acquisition until the determination is received and the bond has been filed with the supervisor.
(c)The supervisor shall determine the amount of an individual indemnity bond required pursuant to subdivision (a) based on the supervisors determination of the full costs of plugging and abandonment, decommissioning the facility, and site restoration using any reasonable method, including, but not limited to, consideration of the factors listed in subdivision (b) of Section 3205.3, or the cost estimation criteria described in subdivision (b) of Section 3205.7, or consultation with a contractor to obtain an estimate of the cost to plug and abandon the wells, decommission the facility, and complete site restoration. The supervisor shall determine the amount of a blanket indemnity bond required pursuant to subdivision (a) based on the sum total of combining the costs from the same determinations as individual indemnity bonds for each well or production facility covered by the blanket indemnity bond.
(d)(1)In lieu of the bond required to be provided pursuant to subdivision (a), the operator may, with the written approval of the supervisor, provide the required security through an equally effective means of financial assurance, which includes a deposit pursuant to Section 3205.5, an irrevocable letter of credit, or a fully funded trust fund, but does not include self-insurance or corporate guarantees. a means of financial assurance listed in subdivision (f) of Section 3205.3, or any other equally effective means of financial assurance that has been approved by the division as described in paragraph (2). The required financial assurance may be obtained or funded by the transferor of the covered well.
(2)The division may approve equally effective means of financial assurance in the same manner as described in paragraphs (1) and (2) of subdivision (f) of Section 3205.3.
(e)(1)This section does not a apply to a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility.
(2)This subdivision does not affect any other requirement of this chapter, nor does it relieve a person of any other responsibility pursuant to this chapter.
(3)A person shall not use a well or production facility acquired for the sole purpose of plugging and abandoning that well or decommissioning that production facility for oil or gas production or injection.
(e)(f)The department shall post on its internet website the information on all indemnity bond determinations made by the supervisor, and shall include for each determination the bond amount and calculations used.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Aug 13, 2026 | In committee: Held under submission. |
| Aug 3, 2026 | In committee: Referred to APPR. suspense file. |
| Jul 9, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 9, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 6. Noes 0.) (July 1). |
| Jun 10, 2026 | Referred to Com. on N.R. & W. |
| May 28, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 27, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 49. Noes 3.) |
| May 27, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 49. Noes 3. Page 5491.) |
| May 27, 2026 | Read third time. Passed. Ordered to the Senate. |
| May 18, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | Joint Rule 62(a), file notice suspended. (Page 5030.) |
| May 14, 2026 | Joint Rule 62(a), file notice suspended. |
| May 14, 2026 | From committee: Do pass. (Ayes 13. Noes 0.) (May 14). |
| May 13, 2026 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 28, 2026 | Re-referred to Com. on APPR. |
| Apr 27, 2026 | Read second time and amended. |
| Apr 23, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 1.) (April 20). |
| Mar 26, 2026 | Re-referred to Com. on NAT. RES. |
| Mar 25, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 16, 2026 | Referred to Com. on NAT. RES. |
| Feb 21, 2026 | From printer. May be heard in committee March 23. |
| Feb 20, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 3, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| May 27, 2026 | AB 2716 Ávila Farías Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 20, 2026 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Bay Area Action | ** Against | |
| 350 Humboldt | ** Against | |
| 350 Santa Barbara | ** Against | |
| 350 South Bay Los Angeles | ** Against | |
| 350 Southland Legislative Alliance | ** Against | |
| Bay Area-System Change Not Climate Change | ** Against | |
| California Assessors’ Association | ** Support | |
| California Chamber Of Commerce | ** Support | |
| California Coastal Protection Network | ** Against | |
| California Environmental Justice Alliance | ** Against | |
| California Independent Petroleum Association | ** Support | |
| California Independent Petroleum Association (sponsor) | ** Support | |
| California Intendent Petroleum Association | ** Support | |
| Center For Biological Diversity | ** Against | |
| Center on Race, Poverty and the Environment | ** Against | |
| CERBAT | ** Against | |
| Clean & Healthy California | ** Against | |
| Clean and Healthy California | ** Against | |
| Clean Water Action | ** Against | |
| cleanearth4kids.org | ** Against | |
| Climate Action California | ** Against | |
| Climate First: Replacing Oil & Gas | ** Against | |
| Climate First: Replacing Oil & Gas (CFROG) | ** Against | |
| Climate Health Now Action Fund | ** Against | |
| Communities for a Better Environment | ** Against | |
| County of Kern (if amended) | ** Support | |
| Courage California | ** Against | |
| E & B Natural Resources | ** Support | |
| Earthjustice | ** Against | |
| Environment California | ** Against | |
| Environmental Defense Center | ** Against | |
| Environmental Protection Information Center (EPIC) | ** Against | |
| Epic - Environmental Protection Information Center | ** Against | |
| Food & Water Watch | ** Against | |
| Fossil Free California | ** Against | |
| FracTracker Alliance | ** Against | |
| Friends Committee On Legislation Of California | ** Against | |
| Greenpeace Usa | ** Against | |
| Indivisible Alta-Pasadena | ** Against | |
| Long Beach Alliance for Clean Energy | ** Against | |
| Natural Resources Defense Council | ** Against | |
| NRDC | ** Against | |
| Oil and Gas Action Network | ** Against | |
| Physicians for Social Responsibility - Los Angeles | ** Against | |
| Redeemer Community Partnership | ** Against | |
| Resource Renewal Institute | ** Against | |
| San Francisco Bay Physicians for Social Responsibility | ** Against | |
| San Francisco Baykeeper | ** Against | |
| SanDiego350 | ** Against | |
| Sierra Club California | ** Against | |
| Signal Hill Petroleum | ** Support | |
| SoCal 350 Climate Action | ** Against | |
| STAND-LA Coalition | ** Against | |
| Sunflower Alliance | ** Against | |
| The Climate Center | ** Against | |
| Tri-County Chamber Alliance | ** Support | |
| West Berkeley Alliance for Clean Air and Safe Jobs | ** Against | |
| Western States Petroleum Association | ** Support | |
| Wholly H2O | ** Against |
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
AB 2716 (Ávila Farías) - Oil and gas: bonding requirements
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would raise the existing maximum additional financial surety that certain risky oil and gas operators are required to provide to the Geologic Energy Management Division (CalGEM) to $80 million; codify requirements for self-insurance for low risk operators; remove the prohibition on self-insurance or a corporate guarantee for the full bond required upon the transfer, acquisition or other conveyance of a well or production facility; and exempt from the full bond requirement the transfer, acquisition or other conveyance of a well or facility purely for the purpose of plugging-and-abandonment or decommissioning as part of a redevelopment pilot program, among other provisions.
Fiscal Impact:
- The Department of Conservation (DOC), which houses CalGEM, estimates costs of $2.8 million in the first year and $2.6 million ongoing (Oil, Gas, and Geothermal Administrative Fund [OGGAF]) to compile documentation and evidence supporting total liability cost estimates; research and gather operator asset data and perform geologic and engineering work for reports, inspections, and cost estimates; prepare and update state cost estimates for well plugging and abandonment, decommissioning of attendant production facilities, and site remediation; coordinate field inspections on identified transfer wells and production facilities when required; maintain ongoing communications with operators to increase financial assurances; develop notices for additional bonding based on the state cost estimate; process transfers and bonds that meet legislative requirements; and provide broad legal support as maximum bonding limits increase, among other things. (See staff comments for costs related to the contingency on AB 2461.)
Background:
California's oil and gas wells carry an end-of-life liability — plugging and abandonment, decommissioning of attendant production facilities, and site restoration — that state law addresses through indemnity bonds and other financial assurance held by CalGEM. The bond amounts set in statute are generally far below the actual cost of that work, and the gap between the two is the state's potential exposure when an operator deserts its wells.
Plugging costs against bond amounts. Costs estimated under CalGEM's regulatory criteria for plugging and abandoning a well and remediating the site average $142,918 in the Northern District, $100,927 in the Central District, and $256,089 in the Southern District. The statutory individual indemnity bonds are $25,000 for a well less than 10,000 feet deep and $40,000 for a deeper well, and blanket bonds range from $200,000 for 20 to 50 wells to $3 million for more than 10,000 wells. It is implicit in the set bond amounts that sufficient oil and gas will be produced by the well to help pay for the eventual cost of the work. There are approximately 54,585 active and 30,258 idle oil and gas wells in the state, and by multiple estimates the orphan well problem the state faces is already on the order of billions of dollars.
Additional security for risky operators. AB 1057 (Limón, 2019) authorized CalGEM to assess up to an additional $30 million in financial surety based on its determination of the risk that an operator will desert its wells and the threats the wells pose to life, health, property, and natural resources. As of May 4, 2026, CalGEM had collected about $261.5 million from 16 operators representing 77 percent of the state's oil and gas wells, and efforts to implement AB 1057 for additional operators continue. Existing law authorizes an operator to provide the additional security through an indemnity bond, a deposit, or any other equally effective means of financial assurance CalGEM approves, including a letter of credit, a corporate guarantee, a trust fund, or a demonstration of self-insurance — the last only where the operator's detailed financial information demonstrates to CalGEM's satisfaction that its desertion risk is low.
Idle well management. An operator must either pay annual idle well fees for each idle well, on a schedule that rises with the length of idleness, or file an Idle Well Management Plan committing to plug and abandon a share of its idle wells each year; failure to do either is sufficient evidence for a well to be considered legally deserted. AB 1866 (Hart, 2024) accelerated the required plugging-and-abandonment rate in the plans and substantially increased the alternative fees. According to CalGEM's most recent idle well report, for 2023 — predating the AB 1866 reforms — 70 Idle Well Management Plans were approved and 59 operators were in compliance with them; nine operators voluntarily voided their plans that year and CalGEM cancelled the other two.
Full-cost bonding on transfers. AB 1167 (W. Carrillo, 2023) required a person who acquires the right to operate a well or production facility to file a bond sufficient to cover the full cost of plugging and abandonment, decommissioning, and site restoration, and prohibited self-insurance and corporate guarantees as the required surety. The prohibition responds to the risk that, if not closely monitored, an operator's bankruptcy could leave taxpayers liable for cleanup; in the last decade, numerous coal operators went bankrupt while self-insured, leaving mine cleanup costs to taxpayers. In the four years before AB 1167 took effect, CalGEM processed about 3,500 well transfers annually. Since then, fourteen transfers have been proposed, of which three to four were completed.
CalGEM's funding and well abatement sources. CalGEM's regulatory work is supported by OGGAF, and the state is fully reimbursed for program expenditures by annual assessments and fees on the regulated industries. The 2026-27 Budget Act provides $142 million from OGGAF for the division's state operations. Idle well fees are deposited into the Hazardous and Idle-Deserted Well Abatement Fund, continuously appropriated for plugging and abandonment and decommissioning at wells of fee-paying operators, with $1 million in annual expenditures, alongside $1 million from the Oil and Gas Environmental Remediation Account; the 2025-26 budget also recognized $52.8 million in federal Infrastructure Investment and Jobs Act funds for well plugging and abandonment.
Proposed Law:
This bill would:
- Increase the amount of additional surety from certain operators from $30 million on the following schedule:
- $45 million/$60 million/$80 million after January 1, 2028/January 1, 2030/January 1, 2032 for operators who have more than 10,000 wells.
- $35 million/$40 million/$50 million after January 1, 2028/January 1, 2030/January 1, 2032 for operators who have between 4,000 – 10,000 wells.
- Operators with fewer than 4,000 wells remain at $30 million.
- Authorize any two or more operators to enter into a liability sharing agreement, under which participating operators are jointly and severally liable for all amounts owed under the oil and gas laws by all other participants, CalGEM treats the participants as a single operator when requiring additional security, and a withdrawing operator remains jointly and severally liable for five years after withdrawal.
- Require CalGEM, when evaluating the risk that an operator will desert its wells, to additionally consider industrywide financial trends, including those affecting the solvency and creditworthiness of oil and gas operators in California.
- Provide that any agreement reached for the additional financial surety prior to January 1, 2027 is good for three years and may be raised thereafter, subject to reevaluation for changed circumstances or new information, as provided.
- Establish explicit requirements for self-insurance as an acceptable method to provide additional financial surety, including an enforceable schedule for plugging-and-abandoning wells and decommissioning production facilities consistent with the operator's Idle Well Management Plan.
- Prohibit an operator who owns or operates 11 or more idle wells without an Idle Well Management Plan or out of compliance with its Idle Well Management Plan from using self-insurance. Require an operator subsequently determined by the supervisor to be out of compliance with its Idle Well Management Plan — or, for an operator with 10 or fewer idle wells, with either its plan or idle well fee requirements — to provide other financial assurance within 90 days.
- Require an operator to provide the previous three years of certified reserve reports and financial statements including balance sheet and income statements, as provided.
- Require the security agreement to include financial criteria the operator is required to satisfy for the duration of the agreement.
- Require the operator to notify CalGEM if it fails to meet one of the criteria subject to certain penalties if it does not, as provided.
- Authorize CalGEM to terminate the self-insurance agreement with 180 days notice. Require the operator to provide the financial surety by another method.
- Authorize a parent company to provide a corporate guarantee. Require CalGEM to establish the criteria for a corporate guaranty agreement.
- Require the self-insurance guarantee to remain in force until terminated or decommissioning is complete.
- Require CalGEM to reevaluate the self-insurance or corporate guarantee at least once every three years or upon a material change, as provided.
- Strike the prohibition on self-insurance and corporate guarantees as an equally effective means of financial assurance for well or production facility sales or transfers.
- Exempt an operator that already has an additional financial surety from having to provide a full bond amount upon the transfer of a well, conditioned on the operator's consistent compliance with its Idle Well Management Plan — or, for an operator with 10 or fewer idle wells, with either its plan or idle well fee requirements — and with the supervisor's cost estimate reporting schedule, with financial assurance required within 90 days of a determination of noncompliance. Require an operator to update their additional financial surety to reflect the transferred well. Provide 36 months for the operator to fund any additional financial surety required.
- Exempt a well or production facility acquired solely for plugging-and-abandoning the well or decommissioning the facility, as part of the redevelopment pilot program or in satisfaction of a prior operator's obligations, from the full bonding on transfer requirement. Require individual or blanket bond amounts specified in statute to be provided instead.
- Prohibit the use of a well or production facility purchased for plugging-and-abandonment or decommissioning from being used for oil or gas production, injection, gas storage, or any associated operation.
- Require the person acquiring the well or production facility to declare, subject to perjury, that the well or production facility is not going to be used for oil or gas production, and to describe the redevelopment plan, including the zoning status of the property. Require a work plan to be provided that provides for decommissioning to commence within 24 months of the date of acquisition, subject to a 12-month extension the supervisor may grant. Require the supervisor to require financial assurance if the acquiring person fails to commence operations within that period. Require the acquiring person to provide at least annual progress updates, and require the supervisor, upon determining the person is not capable of plugging the wells within the established timeframe, to notify the responsible prior operator and require bonds.
- Establish a redevelopment pilot program, limited to 100 wells or associated production facilities added annually, and define redevelopment as redeveloping the property to a use unrelated to oil and gas development, production, waste disposal, or associated activity.
- Require CalGEM, on and after January 1, 2028, to post quarterly on its internet website relevant information related to transfers, as specified; require the Department of Conservation director and the supervisor to report annually at a legislative hearing on well transfer activity, financial assurance implementation, and the redevelopment pilot program; and require a report to the Legislature on or before January 1, 2032, as specified.
- Provide that no reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution.
- Require that both this bill and AB 2461 (Hart) become law or neither does (contingent enactment).
Related Legislation:
AB 2461 (Hart, 2026) would expand the requirement for an operator upon a transfer or sale of an existing oil or gas well and production facility to provide an individual indemnity bond for the full cost of well plugging-and-abandonment, facility decommissioning and site restoration to include a change in control of the operator, as provided. This bill and AB 2461 are contingently enacted: either both become law or neither does.
AB 1866 (Hart, 2024) accelerated the plugging-and-abandonment rate required in Idle Well Management Plans and substantially increased the alternative idle well fees an operator may pay in lieu of a plan.
AB 1167 (W. Carrillo, 2023) required a person who acquires the right to operate a well or production facility to file with the supervisor a bond in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration, and prohibited the use of self-insurance or a corporate guarantee to provide the required financial surety.
AB 1057 (Limón, 2019) authorized CalGEM to require an operator to provide additional financial security based on CalGEM's evaluation of the risk that the operator will desert its wells and the potential threats the wells pose to life, health, property, and natural resources, up to the lesser of CalGEM's estimate of the reasonable costs to the state of plugging and abandoning all the operator's wells and decommissioning attendant facilities, or $30 million.
SB 551 (Jackson, 2019) authorized CalGEM to develop criteria for operators to use in estimating costs to plug and abandon wells and decommission attendant production facilities, including site remediation, and required each operator to report its total plugging, abandonment, and decommissioning liability to the supervisor on a schedule the supervisor determines.
SB 724 (Lara, 2017) authorized the supervisor, where an operator eliminated more long-term idle wells than its plan required in the prior two years, to deduct the excess from the plan's new requirement; provided that moneys in the Hazardous and Idle-Deserted Well Abatement Fund are continuously appropriated for well plugging and abandonment and the decommissioning of production facilities at wells of fee-paying operators; and expanded existing programs to include the identification, decommissioning, plugging, and abandonment of hazardous and idle-deserted wells and associated facilities.
AB 2729 (Williams, 2016) established a comprehensive framework for the management and remediation of idle wells, including the annual idle well fee schedule and the Idle Well Management Plan alternative.
Staff Comments:
Contingent enactment and combined costs. This bill and AB 2461 (Hart) would be contingently enacted: either both would become law or neither would. DOC notes that because this bill is tied to AB 2461, any costs incurred by that bill would be additive to the costs of this bill. For AB 2461, DOC estimates costs of at least $4 million in the first year and $3.8 million ongoing (OGGAF). Together, DOC estimates the two bills would cost at least $6.8 million in the first year and $6.4 million ongoing, all from OGGAF.
State mandate. Under existing law, a person who violates, fails, neglects, or refuses to comply with requirements of the oil and gas laws, including the bonding requirements, is guilty of a misdemeanor. Because this bill would revise the financial assurance requirements subject to that provision, thereby expanding the scope of a crime, this bill would impose a state-mandated local program. No reimbursement would be required because the only costs a local agency or school district would incur would result from this bill expanding the scope of an existing crime, within the meaning of Section 17556 of the Government Code.
Redevelopment pilot program and potential cost pressures. Wells and production facilities transferred under the redevelopment pilot program would post only the standard statutory bond amounts — $25,000 or $40,000 per well individually, or blanket amounts up to $3 million — rather than financial assurance covering the full costs of plugging and abandonment, decommissioning, and site restoration. Costs estimated under CalGEM's regulatory criteria for plugging and abandoning a well and remediating the site average $100,927 to $256,089 across CalGEM's districts. Should an acquiring person fail to complete the required work, the person responsible as an owner or operator before the acquisition would remain responsible for the well or facility and any unfunded costs. To the extent that both the acquiring person fails to complete the work and the responsible prior operator is unable to fund it, CalGEM could face unknown costs, potentially in the millions of dollars, to plug and abandon those wells and decommission those facilities (OGGAF). The pilot program is limited to 100 wells or associated production facilities annually; should the program be expanded, this cost pressure would be amplified commensurately.
Budget context. The 2026-27 Budget Act includes a $7.5 million one-time reduction pursuant to Public Resources Code Section 3258, which authorized DOC to expend an additional one-time $7.5 million from OGGAF in 2026-27 for plugging and abandoning wells, decommissioning facilities, and site remediation only if there was a dedicated appropriation from a fund other than OGGAF for the same purposes. In the absence of the matching non-OGGAF monies, DOC's additional expenditure authority was removed.
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: AB Hearing Date: July 1, 2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Oil and gas: bonding requirements
SUMMARY
This bill would raise the existing maximum additional financial surety that certain risky oil and gas operators are required to provide to the Geologic Energy Management Division to $80 million; codify requirements for self-insurance for low risk operators; remove the prohibition on self-insurance or a corporate guarantee for the full bond required upon the transfer, acquisition or other conveyance of a well or production facility; and exempt from the full bond requirement the transfer, acquisition or other conveyance of a well or facility purely for the purpose of plugging-and-abandonment or decommissioning, among other provisions.
BACKGROUND AND EXISTING LAW
Oil production in California
California is a major oil and gas producing state. According to the U.S. Energy Information Administration, the state was 8th and 15th for oil and marketed natural gas production, respectively, among the 50 states.[1] Oil exploration and production in California started in the 19th century. Production of oil was about 105 million barrels in 2025,[2] and continues to decline from the 1985 peak. Many of the state’s oil and gas fields have been in operation for decades, if not longer, and require costly enhanced oil recovery methods, such as steam injection, to continue to produce oil.
The Geologic Energy Management Division in the Department of Conservation (CalGEM) is the state’s oil and gas production regulator. The State Oil and Gas Supervisor (supervisor) leads CalGEM.
There are currently approximately 54,585 active and 30,258 idle oil and gas wells in the state.[3] Idle wells do not generate oil production revenue for the operator, and are more likely to become orphan wells. Orphan wells are deserted wells that the state has to address because no responsible operator has been found to do so. Orphan wells are likely to not be maintained consistently, and emissions from wells that fail or are failing may be hazardous to the surrounding environment, and public health and safety.
By multiple estimates, the orphan well problem the state faces is already on the order of billions of dollars. Recent reforms at CalGEM have resulted in operators plugging and abandoning more wells and long-term idle wells, but concerns remain about the potential liability to the state’s taxpayers.
In order to help address this problem, an indemnity bond or a similar financial surety is now required to be provided by the operator to CalGEM prior to drilling a well, and then is held by CalGEM until the well is plugged-and-abandoned.[4] Operators who engage in the drilling, redrilling, deepening, or in any operation permanently altering the casing of a well are required to file an individual indemnity bond for each well drilled, redrilled, deepened, or permanently altered, or acquired at $25,000 for each well that is less than 10,000 feet deep, and $40,000 for each well that is 10,000 or more feet deep. Operators are also allowed to file a blanket indemnity bond to cover all the operations in any of their wells in the state in lieu of an individual indemnity bond for each well. These bond amounts are $200,000 for 20 - 50 wells, $400,000 for 51 – 500 wells, $2,000,000 for 501 – 10,000 wells, and $3,000,000 for more than 10,000 wells.
According to CalGEM’s regulations, the estimated cost of plugging-and-abandoning a well and site remediation in its Northern, Central, and Southern Districts are $142,918, $100,927, and $256,089, respectively, on average. The required indemnity bond amounts are generally significantly less than the cost to decommission and remediate the site. It is implicit in the bond amounts set that sufficient oil and gas will be produced to help pay for the eventual cost of plugging-and-abandoning the well, decommissioning facilities, and site remediation.
AB 1057 (Limón, Chapter 771, Statutes of 2019)
In order to help address the significant gap between the liability for decommissioning costs and the nominal indemnity bond amounts provided to CalGEM, AB 1057 provides CalGEM the authority to assess up to an additional $30 million in financial surety based upon CalGEM’s determination of the risk that the operator will desert its well or wells and the potential threats the operator’s well or wells pose to life, health, property, and natural resources.
As of May 4, 2026, CalGEM had collected about $261.5 million from 16 operators representing 77% of the state’s oil or gas wells. Efforts to implement AB 1057 for additional operators continue.
AB 1167 (W. Carillo, Chapter 359, Statutes of 2023)
In another effort to address the issue of insufficient bonding, the Legislature passed and the Governor signed AB 1167 into law. This bill required that upon the transfer, acquisition, or other conveyance of an existing well or facility to a new operator that an individual bond for the full cost of plugging-and-abandonment, the decommissioning of the facility and site restoration be provided to CalGEM. This effort was in part to combat the general industry practice of transferring wells, rather than plugging-and-abandoning them as costs associated with the transfer – particularly for those operators with blanket bonds – were far less. Another key feature of AB 1167 was to prohibit the use of self-insurance or a corporate guarantee to provide the required financial surety. If not closely monitored by CalGEM, the risk of self-insurance is that bankruptcy could result in the state’s taxpayers becoming liable for the clean-up. In the last decade, for example, numerous coal operators have gone bankrupt and were self-insured, leaving the cost for mine clean-up to taxpayers.
In the four years prior to AB 1167 going into effect, CalGEM processed about 3,500 well transfers annually, according to the Assembly Natural Resources Committee. Since then, fourteen transfers have been proposed of which only 3 – 4 were completed.
AB 1866 (Hart, Chapter 548, Statutes of 2024)
AB 1866 is the most recent of multiple bills in the last several years that require an operator to either pay certain idle well fees annually for any wells idle during the year or to develop and implement an Idle Well Management Plan with a schedule for the plugging-and-abandonment of their idle wells (Public Resources Code (PRC) §3206). AB 1866 accelerated the plugging-and-abandonment rate in the Idle Well Management Plans and increased substantially the alternative idle well fees.
According to the most recent Idle Well report for 2023 available from CalGEM[5] (which predated the AB 1866 reforms), 70 Idle Well Management Plans were approved and 59 operators were in compliance with them. Nine operators voluntarily voided their Idle Well Management Plans that year and CalGEM cancelled the other two.
Existing law:
- Establishes the Geologic Energy Management Division (CalGEM) in the Department of Conservation under the direction of the supervisor. (PRC §§3000 et seq.)
- States the intent of the Legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless a bond has been filed that would cover the full cost of plugging and abandonment and site restoration. (PRC §3017)
- Provides that the acquisition of a well or production facility shall not be recognized as complete by the supervisor or the district deputy until the new operator provides an indemnity bond for each well as applicable. (PRC §3202)
- Requires an operator who engages in the drilling, redrilling, deepening, or in any operation permanently altering the casing, of a well, to file with the supervisor an individual indemnity bond for each well so drilled, redrilled, deepened, or permanently altered in the following amount:
- $25,000 for each well that is less than 10,000 feet deep; or,
- $40,000 for each well that is 10,000 or more feet deep. (PRC §3204 (a))
- Authorizes an operator who engages in the drilling, redrilling, deepening, or in any operation permanently altering the casing, of 20 or more wells at any time, to file with the supervisor one blanket indemnity bond to cover all the operations in any of its wells in the state in lieu of an individual indemnity bond for each operation. Establishes the bond amounts to be provided based on the quantity of wells covered by the bond. (PRC §3205)
- Authorizes CalGEM to require an operator filing an individual indemnity bond or a blanket indemnity bond to provide an additional amount of security acceptable to CalGEM based on CalGEM’s evaluation of the risk that the operator will desert its well or wells and the potential threats the operator’s well or wells pose to life, health, property, and natural resources. The additional security required by CalGEM shall not exceed the lesser of CalGEM’s estimation of the reasonable costs of properly plugging and abandoning all of the operator’s wells and decommissioning any attendant production facilities in accordance with Section §3208 or $30 million. (PRC §3205.3(a))
- Requires an operator to provide additional security required in the form of an indemnity bond, a form of deposit, or any other equally effective means of financial assurance approved by CalGEM. Examples of equally effective means of financial assurance that CalGEM may consider for approval include a letter of credit, a corporate guarantee, a trust fund, or a demonstration of self-insurance. Authorizes CalGEM to only approve self-insurance as an equally effective means of financial assurance if the operator provides detailed financial information demonstrating to CalGEM’s satisfaction that the risks associated with the operator’s potential for desertion of its well or wells are low. (PRC §3205.3(f))
- Requires that all operators of oil and gas wells submit cost estimates to CalGEM for the total cost of plugging and abandonment for each of their wells and the decommissioning of all production attendant facilities. (PRC §3205.7)
- Requires a person who acquires the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, except a well that has an average daily production level that exceeds 15 barrels of oil or 60,000 cubic feet of natural gas during the 12 months preceding the date of acquisition or a natural gas storage well, to, as soon as possible, but not later than the date when the acquisition of the well or production facility becomes final, file with the supervisor an individual indemnity bond for the well or production facility, or a blanket indemnity bond for multiple wells or production facilities, in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration and relevant regulations. (PRC §3205.8)
- Requires an operator to either file with the supervisor certain annual idle well fees per well that increase the longer the well has been idle, or file an Idle Well Management Plan with the supervisor that eliminates between 5 – 15% of the idle wells each year (for 2025 – 2027). Failure to pay idle well fees or file a plan is sufficient evidence for the well to be considered legally deserted. (PRC §3206)
- Requires the current operator, as determined by the records of the supervisor, of a deserted well that produced oil, gas, or other hydrocarbons or was used for injection is responsible for the proper plugging and abandonment of the well or the decommissioning of deserted production facilities. (PRC §3237)
PROPOSED LAW
This bill would:
- Revise the intent of the Legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless adequate financial assurance to cover the full cost of plugging and abandonment and site restoration has been provided, except when the well is being transferred for the sole purpose of plugging and abandoning the well or decommissioning the attendant production facility.
- Increase the amount of additional surety from certain operators from $30 million on the following schedule:
- $45 million/$65 million/$80 million after January 1, 2028/January 1, 2030/January 1, 2032 for operators who have more than 10,000 wells.
- $35 million/$40 million/$60 million after January 1, 2028/January 1, 2030/January 1, 2032 for operators who have between 4,000 – 10,000 wells.
- Operators with fewer than 4,000 wells remain at $30 million.
- Provide that any agreement reached for the additional financial surety prior to January 1, 2027 is good for five years and may be raised thereafter, as provided.
- Establish explicit requirements for self-insurance as an acceptable method to provide additional financial surety, including an enforceable schedule for plugging-and-abandoning wells and decommissioning production facilities consistent with the operator’s Idle Well Management Plan.
- Prohibit an operator without an Idle Well Management Plan or out of compliance with its Idle Well Management Plan from using self-insurance.
- Require an operator to provide the previous year’s certified reserve reports and financial statements including balance sheet and income statements, as provided.
- Require the security agreement to include financial criteria the operator is required to satisfy for the duration of the agreement.
- Require the operator to notify CalGEM if it fails to meet one of the criteria subject to certain penalties if it does not, as provided.
- Authorize CalGEM to terminate the self-insurance agreement with 180 days notice. Require the operator to provide the financial surety by another method.
- Authorize a parent company to provide a corporate guarantee.
- Require the self-insurance guarantee to remain in force until terminated or decommissioning is complete.
- Require CalGEM to reevalute the self-insurance or corporate guarantee at least once every three years or upon a material change, as provided.
- Strike the prohibition on self-insurance and corporate guarantees as an equally effective means of financial assurance for well or production facility sales or transfers.
- Exempt an operator that already has an additional financial surety from having to provide a full bond amount upon the transfer of a well. Require an operator to update their additional financial surety to reflect the transferred well. Provide 36 months for the operator to fund any additional financial surety required.
- Exempt a well or production facility acquired solely for plugging-and-abandoning the well or decommissioning the facility from the full bonding on transfer requirement. Require individual or blanket bond amounts specified in statute to be provided instead.
- Prohibit the use of a well or production facility purchased for plugging-and-abandonment or decommissioning from being used to produce oil or for injection.
- Require the person acquiring the well or production facility to declare, subject to perjury, that the well or production facility is not going to be used for oil or gas production. Require a work plan to be provided that provides for decommissioning to commence within 24 months of the date of acquisition, subject to extension.
- Require a legislative report starting January 1, 2028 to contain relevant information related to transfers, as specified.
- Provide that no reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution.
- Require that both this bill and AB 2461 (Hart) become law or neither does (contingent enactment).
ARGUMENTS IN SUPPORT
According to the author, “To protect the state against the risk of an orphaned well after a transfer from one owner to another, AB 1167 (Chapter 359, Statutes of 2023) adjusted the required indemnity bond amount to be sufficient to cover, in full, all costs of plugging and abandonment and site restoration. Since the law was changed, nearly all well transfers have stopped.”
“If transfer approvals continue to stagnate, current well operators may abandon hazardous wells, leading to greater financial and environmental burdens for the state.”
“AB 2716 delivers the legislative revisions that Governor Newsom called for when he signed AB 1167 by giving oil and gas well operators greater financial flexibility to cover the cost of plugging idle wells after a transfer of ownership, reducing the occurrence of orphaned wells and protecting California’s environment and public health.”
ARGUMENTS IN OPPOSITION
In a joint sign-on letter in opposition, the Natural Resources Defense Council (NRDC) writes that this “bill that would unnecessarily increase the risk that astronomical oil and gas well cleanup costs fall on taxpayers rather than the industry responsible for those wells. Three years ago, AB 1167 (Carrillo) took a groundbreaking step forward to address that problem by prohibiting well transfers - a major financial risk factor - without sufficient financial assurance for cleanup costs. AB 2716 would severely weaken that protection, at exactly the time when we need to be working to strengthen it.”
In addition, they note that corporate guarantees may ultimately be worthless, and raise concerns that allowing wells to be purchased for the sole purpose of plugging-and-abandonment “would create a giant loophole […] Absent definitions and guardrails, there is simply no way for regulators to know, or assure, that the ‘sole’ purpose (whatever that may mean) of the transfer is to close the well; or that this purported purpose is carried out in a timely way.”
COMMENTS
Partially undoes AB 1167 reforms. Two of the key reforms governing the transfer of wells under AB 1167 are the prohibition on self-insurance and the requirement that the required bond be paid in full upon transfer. This bill would authorize the use of self-insurance for low risk operators and allow 36 months for the full bond to be paid.
Reducing financial risks to the state’s taxpayers. The ultimate goal of many of the numerous reforms of the state’s oil and gas conservation laws over the last dozen years is to help ensure that the industry pays to clean up after itself. With the goal of reducing financial risks to the state’s taxpayers, there are multiple aspects of the bill that might be improved upon without hindering good faith operators. These include, among others:
- Self-insurance – One year of financial records is insufficient to understand the health of the operator. Failing to abide by the terms of the self-insurance agreement does not necessarily result in having to use a different method of financial assurance. Additionally, according to the data available, a significant fraction of the industry already complies with Idle Well Management Plans. It does not seem unreasonable to condition self-insurance on compliance with this requirement.
- Transfer solely for plugging-and-abandonment and decommissioning – Committee staff understand that there are at least two instances where a public agency or nonprofit was hindered in redeveloping a parcel due to the presence of one or more oil or gas wells on the property and the requirement to provide full bonding for those wells. However, as written, an unlimited number of wells could be transferred, redevelopment of the property to another purpose is not required, the timelines for plugging-and-abandonment and decommissioning are vague, and there is no provision for the oil industry to pay to clean-up if the operator who commits to plugging-and-abandoning the wells and decommissioning the facilities fails to do so.
- Additional financial surety – The bill language is ambiguous as written that a significant change in circumstances would trigger a reevaluation of the amount required, and five years is a long time to prevent CalGEM from seeking additional resources, if warranted.
- Providing for legislative oversight – Given the complexity and interaction of the provisions related to the indemnity bonding/other financial surety and the other potentially far-reaching changes, providing an additional opportunity for legislative oversight – such as that provided by a 5 year sunset – is warranted. Additionally, requiring CalGEM to make additional information available to the legislature and public will aid in that effort.
The Committee may wish to address these issues and others by amending the bill, and further assuring an opportunity for legislative oversight of these potentially far-reaching changes in the future. Additionally, the author has requested amendments that are essentially the first step of potential chaptering out amendments with AB 2461. The Committee may wish to amend the bill to reflect the author’s proposal. [see Amendment #1]
Additional maximum surety amounts. Only two operators operate or control more than 10,000 wells and four additional operators operate or control more than 4,000 and fewer than 10,000 wells. The new maximum amounts for additional financial surety provided in this bill would currently apply to six operators total. The rest would remain at a maximum of $30 million.
Impact on local taxes. The method used to assess the value of assets due to the requirement for immediate full bonding upon transfer has, according to the author, substantially reduced operators’ asset values. The State Board of Equalization advised county assessors last year that “the bonding mandate must be built into income-approach valuations,” although it is unknown to what extent it has been. It is possible that the bonding mandate could significantly impact asset valuation, particularly for small operators. Reduced asset valuation could then result lower property tax revenue to the County.
Contingent enactment. In the Assembly, this bill and AB 2461 (Hart) became linked through contingent enactment language. Both bills seek to reform AB 1167, but in different ways. Due to the contingent enactment language both bills must pass for either to become law.
Recent related legislation
AB 2461 (Hart, 2026) would expand the requirement for an operator upon a transfer or sale of an existing oil or gas well and production facility to provide an individual indemnity bond for the full cost of well plugging-and-abandonment, facility decommissioning and site restoration to include a change in control of the operator, as provided. (This bill is pending before this Committee.)
SUGGESTED AMENDMENTS
AMENDMENT #1
- Add author amendments to add language to address changes in control consistent with AB 2461
- Sunset PRC §3017 in 5 years and revert to existing language
- In PRC §3205.3(a)(2)(D) change to 5 years to 3 years and clarify ambiguity related to whether changed circumstances could trigger a re-evaluation of the additional surety provided (up or down) pursuant to existing subdivision (e).
- In PRC §3205.3(f)(3)(A) require compliance with an Idle Well Management Plan to be eligible for self-insurance.
- In PRC §3205.3(f)(3)(B) – require 3 years of financial records to be provided while assessing eligibility for self-insurance.
- In PRC §3205.3(f)(3)(E) – authorize CalGEM to establish the criteria for any corporate guaranty.
- In PRC §3205.8(e)(1) – add explicit reference to the section authorizing standard indemnification bonding for wells or facilities obtained for the sole purpose of plugging-and-abandonment or decommissioning.
- In PRC §3205.8(e)(3) (and elsewhere) – replace the reference to “oil or gas production or injection” with “oil or gas production, injection, gas storage, or any associated operation” to more fully encompass current CalGEM-regulated wells and facilities.
- In PRC §3205.8(f)(1) – require compliance with an Idle Well Management Plan to be eligible. Require compliance with PRC 3205.7 reporting.
- Sunset PRC §3205.8 in 5 years and revert to existing language. Any agreement entered into under the sunsetting language will remain in force.
- In PRC §3205.9 – establish a redevelopment pilot program. authorize 100 wells annually to be added to the pilot program, require a redevelopment plan to be provided. Establish timelines for wells and facilities to be plugged-and-abandoned and decommissioned for redevelopment purposes. Require CalGEM to complete plugging-and-abandonment, decommissioning, and site restoration if necessary. No additional wells can be added to the pilot program after 5 years and sunset in 10 years.
- In PRC §3205.10 – modify required online reporting of implementation by CalGEM. Require the DoC director and the supervisor to report to the Legislative policy committees annually on implementation. Sunset in 5 years.
- Additional largely technical and clarifying changes.
SUPPORT
California Independent Petroleum Association (sponsor)
California Assessors’ Association
California Chamber of Commerce
County of Kern (if amended)
E & B Natural Resources
Signal Hill Petroleum
Tri-County Chamber Alliance
Western States Petroleum Association
OPPOSITION
350 Bay Area Action
350 Humboldt
350 Santa Barbara
350 South Bay Los Angeles
350 Southland Legislative Alliance
Bay Area-System Change not Climate Change
California Coastal Protection Network
California Environmental Justice Alliance
Center for Biological Diversity
Center on Race, Poverty and the Environment
CERBAT
Clean and Healthy California
Clean Water Action
CleanEarth4Kids.org
Climate Action California
Climate First: Replacing Oil & Gas (CFROG)
Climate Health Now Action Fund
Communities for a Better Environment
Earthjustice
Environment California
Environmental Defense Center
Environmental Protection Information Center (EPIC)
Food & Water Watch
FracTracker Alliance
Friends Committee on Legislation of California
Greenpeace USA
Indivisible Alta-Pasadena
Long Beach Alliance for Clean Energy
NRDC
Oil and Gas Action Network
Physicians for Social Responsibility - Los Angeles
Redeemer Community Partnership
Resource Renewal Institute
San Francisco Bay Physicians for Social Responsibility
San Francisco Baykeeper
SanDiego350
Sierra Club California
SoCal 350 Climate Action
STAND-LA Coalition
Sunflower Alliance
The Climate Center
West Berkeley Alliance for Clean Air and Safe Jobs
Wholly H2O
One individual
-- END --
Ranking based upon 2024 data. ↑
According to the WellSTAR data dashboard (accessed May 31, 2026). ↑
According to the Well STAR data dashboard (accessed June 28, 2026). ↑
Prior to January 1, 2018, the indemnity bond was only required until the well was successfully drilled and then was returned to the operator. CalGEM is authorized to require an indemnity bond be provided for certain facilities as well. ↑
Dated December 2025 ↑
ASSEMBLY THIRD READING
ATR Bill Id:AB 2716
Author:(Ávila Farías)
As Amended Ver:April 27, 2026
Majority vote
SUMMARY
Amends the bonding requirements for a person who acquires the right to operate a well or production facility by repealing the exclusion of self-insurance or corporate guarantee, and authorizing an operator to, in lieu of the bonding requirement and with the written approval of the supervisor, provide the required security through a specified means of financial assurance, as provided.
Major Provisions
- Prohibits the additional security required of an oil and gas well operator by the California Geologic Energy Management Division (CalGEM) from exceeding the lesser of CalGEM’s estimation of the reasonable costs of properly plugging and abandoning all the operator’s wells and decommissioning any attendant production facilities (consistent with current law) or the maximum amount of additional security established by this bill, based on the total number of active and idle wells under the control of the operator pursuant to a specified schedule – instead of $30 million, as provided under current law.
- Prohibits CalGEM from increasing the amount of additional security required of an operator that had an additional security agreement approved by CalGEM as of January 1, 2027, until five years after the effective date of the agreement, as specified.
- Requires CalGEM, when making an estimation of the reasonable costs of properly plugging and abandoning an operator’s well or wells and decommissioning any attendant production facilities, to additionally consider industrywide financial trends, including those trends affecting the solvency and creditworthiness of oil and gas operators in California.
- Provides that CalGEM may only approve self-insurance or a corporate guarantee as an equally effective means of financial assurance if, in addition to existing requirements, the approval is conditioned upon six additional requirements specified in the bill, including an enforceable schedule for the plugging and abandonment of wells and decommissioning of production facilities consistent with an operator’s idle well management plan, as provided; requires that CalGEM’s approval be set forth in an additional security agreement between the operator and CalGEM; and requires CalGEM to reevaluate whether self-insurance or a corporate guarantee approved by CalGEM continues to constitute an equally effective means of financial assurance at least once every three years, or upon a material change in the financial condition of the operator or guarantor entity, whichever occurs first.
- Repeals the exclusion of self-insurance or corporate guarantee as an acceptable form of financial assurance that a person who acquires the right to operate a well may provide in lieu of an existing bonding requirement and additionally authorizes an operator to, in lieu of the bonding requirement and with the written approval of CalGEM, provide the required security through a specified means of financial assurance, including pursuant to the above-referenced process for obtaining division approval for self-insurance or a corporate guarantee applicable to existing operators, as provided.
- Exempts from specified bonding and financial assurance requirements (a) a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility, as specified, or (b) an operator with additional security approved by CalGEM, as specified.
- Specifies numerous conditions and requirements related to a person acquiring the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility, including, among other things, that the well or production facility not be used for oil or gas production or injection, that CalGEM has the authority to require an acquiring person who fails to commence operations within a specified timeframe to require the person to file financial assurance, and that a person who was responsible as an owner or operator of the well or production facility before an acquisition remain responsible for the well or facility and any unfunded costs associated with plugging and abandonment of the well or facility.
- Requires CalGEM, on and after January 1, 2028, to include in its annual report to the Legislature, as part of its existing reporting on well transfer activity and financial assurance, specified information, including, among other things, the number and location of wells and production facilities acquired for the sole purpose of plugging and abandoning that well or decommissioning the production facility, the status of plugging and abandonment or decommissioning operations for those wells and facilities, and a description of any wells or production facilities located in, or within one mile of, a disadvantaged community. Specifies that the information reported be based on data available to CalGEM and not require the division to conduct new studies or analysis beyond those already required under existing law.
- Becomes operative only if AB 2461 (Hart) of the current legislative session is enacted and becomes effective on or before January 1, 2027. AB 2461 expands bonding requirements for a person that acquires the right to control a well or production facility.
COMMENTS
In California, bonds are required to be posted, based on specified statutory amounts, when a drilling permit is issued to cover plugging and abandonment costs. AB 1167 (Carillo), Chapter 359, Statutes of 2023, further requires a person who acquires the right to operate a well or production facility to file with the supervisor a bond for the well or production facility in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment and site restoration.
The purpose of AB 1167 was to protect the state – and taxpayers – from financial liability for plugging and abandoning orphaned wells. According to the Department of Finance, bonding companies are becoming hesitant to approve indemnity bonds due to California's current regulatory environment and future outlook for oil and gas operations, and the Department expressed concerns that AB 1167 could also increase that problem.
Providing sufficient financial assurances is critical to ensuring the polluter pays, so to speak, because CalGEM does not have the cash on hand to cover all the uninsured costs to plug and remediate abandoned wells and production facilities. Flexibility may need to be provided under current law so that financial mechanisms that are accessible – and financially appropriate – are secured and approved ahead of any transfer, sale, or acquisition.
According to the Author
To protect the state against the risk of an orphaned well after a transfer from one owner to another, AB 1167 adjusted the required indemnity bond amount to be sufficient to cover, in full, all costs of plugging and abandonment and site restoration. Since the law was changed, nearly all well transfers have stopped. If transfer approvals continue to stagnate, current well operators may abandon hazardous wells, leading to greater financial and environmental burdens for the state. AB 2716 delivers the legislative revisions that Governor Newsom called for when he signed AB 1167 by giving oil and gas well operators greater financial flexibility to cover the cost of plugging idle wells after a transfer of ownership, reducing the occurrence of orphaned wells and protecting California’s environment and public health.
Arguments in Support
According to the California Intendent Petroleum Association, AB 2716 is a necessary and carefully tailored bill to correct serious problems created by AB 1167 (2023). As you know, AB 1167 imposed an inflexible transfer-bonding structure that has effectively frozen the lawful sale and transfer of California oil and gas assets. In practice, the law has blocked recapitalization, stranded assets, and prevented wells and facilities from moving into the hands of operators with the financial capacity and regulatory commitment to maintain, manage, and retire them most effectively. This is precisely the kind of unintended consequence Governor Newsom warned about in his signing message when he noted that the statute could increase the risk of well desertion and would require legislative revision.
Arguments in Opposition
A coalition of environmental organizations writes that the financial risk to the state associated with oil well cleanup is obvious and daunting. The total cost to clean up California’s wells and production facilities has been estimated at $21.5 billion - a bill that will come due in the foreseeable future as California's forty-year long decline in oil production inevitably continues. Although oil and gas operators are legally obligated to pay that cost, that is not what is happening. Hundreds of millions of dollars in public funds have already been dedicated to clean up wells deserted by operators who have failed to honor their obligations. AB 1167 took a step to reverse course on this dangerous situation by ensuring that, at the very least, no operator can transfer a well without financial assurance in place sufficient to cover the full cost of plugging and abandonment. AB 2716 would punch holes in that safety net, harming every taxpayer in the state to benefit only oil companies.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, CalGEM estimates ongoing annual costs of about $1.4 million (Oil, Gas and Geothermal Administrative Fund) for one attorney, four associate oil and gas engineers, and one analyst for additional operator communication, meetings, document review and preparation, and financial reviews and analysis. The Appropriations Committee notes CalGEM may incur additional costs to determine whether purchasers qualify for the "sole purpose" exemption and to comply with the bill's reporting requirements.
VOTES
ASM NATURAL RESOURCES: 8-1-5
YES: Bryan, Ellis, Alanis, Haney, Hoover, Macedo, Muratsuchi, Wicks
NO: Connolly
ABS, ABST OR NV: Garcia, Kalra, Pellerin, Schultz, Zbur
ASM APPROPRIATIONS: 13-0-2
YES: Wicks, Hoover, Aguiar-Curry, Calderon, Dixon, Fong, Mark González, Krell, Pacheco, Sharp-Collins, Solache, Ta, Tangipa
ABS, ABST OR NV: Caloza, Pellerin
UPDATED
VERSION: April 27, 2026
CONSULTANT: Paige Brokaw / NAT. RES. / (916) 319-2092 FN: 0002596
Date of Hearing: May 13, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2716
Author:(Ávila Farías) – As Amended Ver:April 27, 2026
Policy Committee: | Natural Resources | Vote: | 8 - 1 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill amends the bonding requirements for a person who acquires the right to operate a well or production facility by repealing the exclusion of self-insurance or corporate guarantee, and by authorizing an operator to, in lieu of the bonding requirement and with the written approval of the State Oil and Gas Supervisor (who oversees the California Geologic Energy Management Division (CalGEM)), provide the required security through a specified means of financial assurance.
Specifically, this bill, among other things:
1) Prohibits the additional security required of an oil and gas well operator by CalGEM from exceeding the lesser of (a) CalGEM’s estimation of the reasonable costs of properly plugging and abandoning all the operator’s wells and decommissioning any attendant production facilities (consistent with current law) or (b) the maximum amount of additional security established by this bill, based on the total number of active and idle wells under the control of the operator pursuant to a specified schedule – instead of $30 million, as provided under current law.
2) Prohibits CalGEM from increasing the amount of additional security required of an operator that had an additional security agreement approved by CalGEM as of January 1, 2027, until five years after the effective date of the agreement, as specified.
3) Requires CalGEM, when making an estimation of the reasonable costs of properly plugging and abandoning an operator’s well or wells and decommissioning any attendant production facilities, to additionally consider industrywide financial trends, including those trends affecting the solvency and creditworthiness of oil and gas operators in California.
4) Provides that CalGEM may only approve self-insurance or a corporate guarantee as an equally effective means of financial assurance if, in addition to existing requirements, the approval is conditioned upon six additional requirements specified in the bill, including an enforceable schedule for the plugging and abandonment of wells and decommissioning of production facilities consistent with an operator’s idle well management plan, as provided; requires that CalGEM’s approval be set forth in an additional security agreement between the operator and CalGEM; and requires CalGEM to reevaluate whether self-insurance or a corporate guarantee approved by CalGEM continues to constitute an equally effective means of financial assurance at least once every three years, or upon a material change in the financial condition of the operator or guarantor entity, whichever occurs first.
5) Repeals the exclusion of self-insurance or corporate guarantee as an acceptable form of financial assurance that a person who acquires the right to operate a well may provide in lieu of an existing bonding requirement and additionally authorizes an operator to, in lieu of the bonding requirement and with the written approval of CalGEM, provide the required security through a specified means of financial assurance, including pursuant to the above-referenced process for obtaining division approval for self-insurance or a corporate guarantee applicable to existing operators, as provided.
6) Exempts from specified bonding and financial assurance requirements (a) a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility, as specified, or (b) an operator with additional security approved by CalGEM, as specified.
7) Specifies numerous conditions and requirements related to a person acquiring the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility, including, among other things, that the well or production facility not be used for oil or gas production or injection, that CalGEM has the authority to require an acquiring person who fails to commence operations within a specified timeframe to require the person to file financial assurance, and that a person who was responsible as an owner or operator of the well or production facility before an acquisition remain responsible for the well or facility and any unfunded costs associated with plugging and abandonment of the well or facility.
8) Requires CalGEM, on and after January 1, 2028, to include in its annual report to the Legislature, as part of its existing reporting on well transfer activity and financial assurance, specified information, including, among other things, the number and location of wells and production facilities acquired for the sole purpose of plugging and abandoning that well or decommissioning the production facility, the status of plugging and abandonment or decommissioning operations for those wells and facilities, and a description of any wells or production facilities located in, or within one mile of, a disadvantaged community. Specifies that the information reported be based on data available to CalGEM and not require the division to conduct new studies or analysis beyond those already required under existing law.
9) Becomes operative only if AB 2461 (Hart) of the current legislative session is enacted and becomes effective on or before January 1, 2027. AB 2461 expands bonding requirements for a person that acquires the right to control a well or production facility.
FISCAL EFFECT:
CalGEM estimates ongoing annual costs of about $1.4 million (Oil, Gas and Geothermal Administrative Fund) for one attorney, four associate oil and gas engineers, and one analyst for additional operator communication, meetings, document review and preparation, and financial reviews and analysis. Specific tasks include, among other things, compiling documentation and evidence supporting total liability cost estimates; researching and gathering operator asset data and performing geologic and engineering work for reports, inspections, and cost estimates; updating previously completed cost estimates to reflect current costs, assets, and site conditions; coordinating field inspections on identified transfer wells and production facilities, as needed; maintaining ongoing communication with operators to increase financial assurances; developing notices for additional bonding; and processing transfers and bonds. The committee notes CalGEM may incur additional costs to determine whether purchasers qualify for the "sole purpose" exemption and to comply with the bill’s reporting requirements.
COMMENTS:
1) Purpose. According to the author:
AB 2716 delivers the legislative revisions that Governor Newsom called for when he signed [AB 1167 (Carillo), Chapter 359, Statutes of 2023] by giving oil and gas well operators greater financial flexibility to cover the cost of plugging idle wells after a transfer of ownership, reducing the occurrence of orphaned wells and protecting California’s environment and public health.
2) Background. An operator who engages in the drilling, redrilling, deepening, or in any operation permanently altering the casing of a well must file with the State Oil and Gas Supervisor an individual indemnity bond for each well in the following amounts: $25,000 for each well that is less than 10,000 feet deep and $40,000 for each well that is 10,000 or more feet deep. Operators are allowed to file a blanket indemnity bond in lieu of an individual indemnity bond for each operation, and the conditions and amounts for blanket bonds are specified in statute.
To ensure the sufficiency of these indemnity bonds, the Legislature gave CalGEM authority in SB 551 (Jackson), Chapter 774, Statutes of 2019, to develop criteria to be used by operators for estimating costs to plug and abandon wells and decommission attendant production facilities, including site remediation. SB 551 also requires each operator of an oil or gas well to submit a report to the supervisor that demonstrates the operator’s total liability to plug and abandon all wells and to decommission all attendant production facilities, including site remediation, on a schedule determined by the supervisor.
Further, AB 1057 (Limón), Chapter 771, Statutes of 2019, authorized CalGEM to require an operator to provide additional financial security based on CalGEM’s evaluation of the risk that the operator will desert its well or wells and the potential threats the operator’s well or wells pose to life, health, property, and natural resources. The required amount of additional security is based on CalGEM’s estimation of the reasonable costs to the state for properly plugging and abandoning all the operator’s wells and decommissioning any attendant production facilities, or $30 million, whichever is less.
AB 1167 requires a person who acquires the right to operate a well or production facility to file with the supervisor a bond for the well or production facility in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment and site restoration.
Among others in support, the California Independent Petroleum Association (CIPA) argues this bill “directly addresses the serious fiscal impacts created by AB 1167.” CIPA notes that the Department of Finance opposed AB 1167 and warned the bill could harm the state financially, and that Governor Newsom, in signing AB 1167, further acknowledged the Legislature may need to revisit the law if it produced unintended consequences.
Signal Hill Petroleum Inc. (SHP), writing in support, notes that since AB 1167 took effect, no active wells subject to the law have been transferred for continued operation. SHP writes, “The requirement that an acquiring operator post a full upfront indemnity bond covering 100% of estimated plugging costs before any transfer can close has proven unworkable,” and that AB 1167 has not protected taxpayers from cleanup liability; instead, “it has frozen the market for oil and gas assets entirely, trapping wells with their current operators regardless of whether those operators have the financial capacity to maintain them, comply with regulatory requirements, or eventually plug them.”
SHP argues this bill addresses the above-described problem in three ways. First, it expands the menu of financial assurance instruments an acquiring operator may use to satisfy the transfer bonding requirement. Second, the bill creates a streamlined pathway for parties acquiring wells solely to plug, abandon, and restore well sites. Third, the bill recognizes compliance with CalGEM’s existing risk-based additional security framework under AB 1057. Finally, SHP cites examples under the state’s existing regulatory framework of significant protections against orphan well liabilities, arguing this bill “builds on this progress by restoring responsible operators’ ability to acquire, maintain, and retire wells under enforceable plans.”
Writing in opposition, a coalition of environmental and environmental justice organizations argues this bill, by requiring “additional cumbersome” financial analyses, “significantly increases the administrative and fiscal burden on [CalGEM], far beyond its current capacity and expertise.” The coalition notes the bill requires CalGEM to consider, on a case-by-case basis, whether oil and gas operators may use corporate guarantees or self-insurance “to substitute for third party guaranteed financial assurance requirements that would otherwise apply to oil and gas activities and transactions.” Among other things, the coalition argues this bill creates a “sweeping loophole in full financial assurance requirements for companies that claim the “sole purpose” of well acquisition to plug and abandon” and that the bill “exposes the state and the public to significant additional fiscal costs in the near and long term, increasing the risk billions in private industry cleanup costs fall on the state.”
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: April 20, 2026
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 2716 (
Author:Ávila Farías) – As Amended Ver:March 25, 2026
SUBJECT: Oil and gas: bonding requirements
SUMMARY: Amends the bonding requirements for a person who acquires the right to operate a well or production facility by repealing the exclusion of self-insurance or corporate guarantee, and authorizing an operator to, in lieu of the bonding requirement and with the written approval of the supervisor, provide the required security through a specified means of financial assurance, as provided.
EXISTING LAW:
- Establishes the Geologic Energy Management Division (CalGEM) in the Department of Conservation under the direction of the supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of oil and gas wells. (Public Resources Code (Public Resources Code (PRC) 3000 et seq.)
- States the intent of the Legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless a bond has been filed that would cover the full cost of plugging and abandonment and site restoration. (PRC 3017)
- Provides that the acquisition of a well or production facility shall not be recognized as complete by the supervisor or the district deputy until the new operator provides an indemnity bond for each well as applicable. (PRC 3202)
- Requires an operator who engages in the drilling, redrilling, deepening, or in any operation permanently altering the casing, of a well, to file with the supervisor an individual indemnity bond for each well so drilled, redrilled, deepened, or permanently altered in the following amount:
- $25,000 for each well that is less than 10,000 feet deep; or,
- $40,000 for each well that is 10,000 or more feet deep. (PRC 3204 (a))
- Authorizes an operator who engages in the drilling, redrilling, deepening, or in any operation permanently altering the casing, of 20 or more wells at any time, to file with the supervisor one blanket indemnity bond to cover all the operations in any of its wells in the state in lieu of an individual indemnity bond for each operation. Establishes the bond amounts to be provided based on the quantity of wells covered by the bond. (PRC 3205)
- Authorizes CalGEM to require an operator filing an individual indemnity bond or a blanket indemnity bond to provide an additional amount of security acceptable to CalGEM based on CalGEM’s evaluation of the risk that the operator will desert its well or wells and the potential threats the operator’s well or wells pose to life, health, property, and natural resources. The additional security required by CalGEM shall not exceed the lesser of CalGEM’s estimation of the reasonable costs of properly plugging and abandoning all of the operator’s wells and decommissioning any attendant production facilities in accordance with Section 3208 or $30 million. (PRC 3205.3(a))
- Requires an operator to provide additional security required in the form of an indemnity bond, a form of deposit, or any other equally effective means of financial assurance approved by CalGEM. Examples of equally effective means of financial assurance that CalGEM may consider for approval include a letter of credit, a corporate guarantee, a trust fund, or a demonstration of self-insurance. Authorizes CalGEM to only approve self-insurance as an equally effective means of financial assurance if the operator provides detailed financial information demonstrating to CalGEM’s satisfaction that the risks associated with the operator’s potential for desertion of its well or wells are low. (PRC 3205.3(f))
- Requires that all operators of oil and gas wells submit cost estimates to CalGEM for the total cost of plugging and abandonment for each of their wells and the decommissioning of all production attendant facilities. (PRC 3205.7)
- Requires a person who acquires the right to operate a well or production facility, by purchase, transfer, assignment, conveyance, exchange, or other disposition, except a well that has an average daily production level that exceeds 15 barrels of oil or 60,000 cubic feet of natural gas during the 12 months preceding the date of acquisition or a natural gas storage well, to, as soon as possible, but not later than the date when the acquisition of the well or production facility becomes final, file with the supervisor an individual indemnity bond for the well or production facility, or a blanket indemnity bond for multiple wells or production facilities, in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment, decommissioning of the facility, and site restoration and relevant regulations. (PRC 3205.8)
- Requires the current operator, as determined by the records of the supervisor, of a deserted well that produced oil, gas, or other hydrocarbons or was used for injection is responsible for the proper plugging and abandonment of the well or the decommissioning of deserted production facilities. (PRC 3237)
THIS BILL:
- Revises the intent of the Legislature that, to minimize the risk that the state will be liable for costs of plugging and abandonment, no well be transferred to another owner until and unless adequate financial assurance to cover the full cost of plugging and abandonment and site restoration has been provided, except when the well is being transferred for the sole purpose of plugging and abandoning the well or decommissioning the attendant production facility.
- Strikes the prohibition on self-insurance and corporate guarantees as an equally effective means of financial assurance for well or production facility sales or transfers.
- Provides that an equally effective means of financial assurance includes a means of financial assurance, as provided, or any other equally effective means of financial assurance that has been approved by CalGEM.
- Provides that the specified bonding and financial assurance requirements do not apply to a person who acquires the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning that production facility.
- Prohibits a person using a well or production facility acquired for the sole purpose of plugging and abandoning that well or decommissioning that production facility for oil or gas production or injection.
- Provides that this does not apply to operators with additional security approved by CalGEM pursuant to PRC 3205.3.
- Provides that a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning that well or decommissioning the production facility is not subject to any of the requirements of PRC 3205.8, and requires that person to file a bond as required pursuant to PRC 3204, 3205, 3205.1, or 3205.2, as applicable.
- Requires a person to be subject to the specified requirements as an operator of the well or production facility, until either of the following occur:
- The supervisor determines that the well has been properly plugged and abandoned and the production facilities have been decommissioned; or,
- As applied to work conducted in accordance with the approvals given by the supervisor, the supervisor subsequently determines that additional work is not practical or would pose greater environmental or safety risk.
- Requires, upon a determination by the supervisor, the supervisor to release the bond, and the acquiring person shall have no further obligation or liability for the well or facility.
- Requires a person who was responsible, under current law, as an owner or operator of the well or production facility before an acquisition to be responsible for the well or production facility.
- Prohibits the use of a well or production facility acquired under this section for purposes of oil or gas production or injection.
- Provides that no reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution.
FISCAL EFFECT: Unknown
COMMENTS:
- Financial assurances. In every state, operators have to provide some form of financial assurance for a well at the time that it is drilled. This assurance is intended to cover or mitigate the eventual costs of plugging the well and/or environmental impacts caused by the well, in the event the operator at the time the well is terminated is unable or unwilling to do so.
In California, bonds are required to be posted when a drilling permit is issued to cover plugging and abandonment costs. Operators are required to file an individual indemnity bond for each well drilled, redrilled, deepened, or permanently altered, or acquired at $25,000 for each well that is less than 10,000 feet deep, and $40,000 for each well that is 10,000 or more feet deep. Operators are also allowed to file a blanket indemnity bond to cover all the operations in any of its 20+ wells in the state in lieu of an individual indemnity bond for each operation. The amount for the blanket bonds is also specified in statute.
To ensure the sufficiency of these indemnity bonds, the Legislature gave CalGEM authority, per SB 551 (Jackson), Chapter 774, Statutes of 2019, to develop criteria to be used by operators for estimating costs to plug and abandon wells and decommission attendant production facilities, including site remediation. SB 551 also requires each operator of an oil or gas well to submit a report to the supervisor that demonstrates the operator’s total liability to plug and abandon all wells and to decommission all attendant production facilities, including site remediation, on a schedule determined by the supervisor.
Further, AB 1057 (Limón), Chapter 771, Statutes of 2019, authorizes CalGEM to require an operator to provide an amount of security acceptable to CalGEM based on CalGEM’s evaluation of the risk that the operator will desert its well or wells and the potential threats the operator’s well or wells pose to life, health, property, and natural resources. That law sets a floor on the amount of the reasonable costs to plug and abandon operator’s wells at $30 million.
Lastly, under current law (PRC 3237), if CalGEM determines the current operator does not have the financial resources to fully cover the cost to plug the well, previous operators that made a valid transfer after January 1, 1996, may be held responsible for the cost to plug the well.
- Sales and transfers. In the fall of 2022, supermajors Shell and ExxonMobil agreed to sell more than 23,000 wells in California, which they owned through a joint venture called Aera Energy, to German asset management group IKAV for an estimated $4 billion. Aera accounts for about a quarter of California’s oil and gas production, largely from pumping in Kern and Ventura counties. The Los Angeles Times reported at the time that IKAV stood to inherit a portfolio littered with wells past their prime. Nearly 9,000 Aera wells were idle as of early October 2022, meaning about 38% of the company’s unplugged inventory wasn’t producing oil or gas, according to state data.
In response, AB 1167 (Carillo), Chapter 359, Statutes of 2023, requires a person who acquires the right to operate a well or production facility to file with the supervisor a bond for the well or production facility in an amount determined by the supervisor to be sufficient to cover, in full, all costs of plugging and abandonment and site restoration. AB 1167 prohibits companies from using their existing indemnity bonds and requires new, individual bonds for any well that is purchased or transferred. The author’s intent with AB 1167 was not to shutter the oil industry; it was to ensure the financial responsibility of clean up and remediation falls with the oil well operators and not California tax payers in the event the well is “orphaned.”[1]
When Governor Newsom signed AB 1167, he included a signing message that stated, “increasing the financial assurances required for oil and gas well transfers also potentially creates risk of current oil and gas well operators deserting these hazardous wells. I look forward to working with the Legislature to enact legislation to make any necessary revisions to address this risk and otherwise align this law with programs that [CalGEM] is already developing to address orphaned and abandoned wells.”
- Frozen bond market? According to CalGEM, from January 1, 2019, when AB 1057 went into effect through 2023, CalGEM processed an average of 3,500 well transfers per year. From January 1, 2024, when AB 1167 went into effect through today, 501 well transfers have occurred. Of those, 62 transfers of wells have taken place under PRC 3205.8. The first transfer was for one well, and the second was a transfer of 61 marginal wells for the purposes of a housing development. In other words, a single project accounts for 61 of those 62 wells.
The California Independent Petroleum Association (CIPA) states that bonds are unavailable for owners or operators to sell, transfer, or acquire new wells because AB 1167 essentially “froze and devalued oil and gas operators’ assets, increasing the likelihood of financial insolvency and well desertion.” Since AB 1167 took effect, no active wells subject to the law have been transferred for continued operation. When responsible, well-capitalized operators cannot purchase wells from struggling operators, those assets are stranded with companies that may lack the resources to maintain them or properly shut them down. The author notes that the inability to transfer wells has also reduced operators’ asset values, reduced local tax revenue, limited operators’ access to capital, and made it harder for them to fund maintenance, regulatory compliance, and decommissioning.”
- Learning from the past. The specific exclusion of self-certification and “equally effective” means was purposeful when crafting AB 1167.
The federal Surface Mining Control and Reclamation Act of 1977 required coal companies to restore the land after mining, post financial assurance before mining, and ensure funds would be available if the company failed. The law allowed several forms of bonding, including surety bonds, collateral bonds, and self-bonding (corporate guarantee based on financial strength). Self-bonding was intended only for financially strong companies that met specific criteria. Beginning around 2012–2015, the coal industry started to crash due to competition from natural gas and renewables, falling coal prices, and other factors. Major producers filed bankruptcy. At the time of bankruptcy, companies held billions in self-bonded reclamation obligations. For instance, Peabody held roughly $1.4 billion in self-bonded reclamation liabilities, and Arch Coal and Alpha also carried hundreds of millions to over a billion in self-bonds.
Self-bonding failed because when companies entered bankruptcy, reclamation liabilities were treated as unsecured claims or renegotiated. By the time coal prices collapsed, companies technically no longer qualified for self-bonding — but regulators had not forced earlier replacement with secured bonds. States were left holding the bag with liability for reclamation due to large unsecured reclamation risks. The Abandoned Mine Land (AML) Program was funded by fees on coal production, and the funds were designed for pre-1977 “orphaned” mines, not modern bankruptcies. As insolvencies increased, the risk increased that AML or taxpayer funds would indirectly support cleanup. Total U.S. coal self-bonding exceeded $3–4 billion. By the early 2020s, most large coal companies had replaced or eliminated self-bonds. Coal industry self-bonding is now a cautionary tale about allowing industry self-certification of cleanup obligations.
- Providing flexibility without undermining appropriate protections. The purpose of AB 1167 was to protect the state – and taxpayers – from financial liability for plugging and abandoning orphaned wells. According to the Department of Finance, bonding companies are becoming hesitant to approve indemnity bonds due to California's current regulatory environment and future outlook for oil and gas operations, and the Department expressed concerns that AB 1167 could also increase that problem.
Providing sufficient financial assurances is critical to ensuring the polluter pays, so to speak, because CalGEM does not have the cash on hand to cover all the uninsured costs to plug and remediate abandoned wells and production facilities. Flexibility may need to be provided under current law so that financial mechanisms that are accessible – and financially appropriate – are secured and approved ahead of any transfer, sale, or acquisition.
- Separate rules for developers. Developers are increasingly purchasing former oil and gas well sites for redevelopment, driven by urban infill demand, the need for affordable housing, and high land value in areas such as Southern California. These redevelopment projects often involved converting dormant or orphan oil fields into residential, commercial, or recreational spaces. Developers inherit significant responsibility for plugging, abandoning, and remediating wells to current safety standards.
In 2023, the L.A. Neighborhood Land Trust purchased for $10 million a 2-acre site with 36 decommissioned wells for conversion into a park and affordable housing, known as the Jefferson Park Project. The land trust did not obtain bonds for the acquisition; instead, legacy regulatory bonding requirements tied to the former oil operator and a general expectation that remediation costs would be handled through acquisition terms, grants, and environmental cleanup processes.
This bill provides that a person who has acquired the rights to a well or production facility for the sole purpose of plugging and abandoning is subject to the state oil and gas laws as an operator, until a determination by the supervisor that the well has been properly plugged and abandoned or the production facilities have been decommissioned. Upon this determination by the supervisor, the bill requires the supervisor to release the bond, and would release the acquiring person from any further obligation or liability for the well or facility. The person who, before the acquisition, was responsible as an owner or operator, remains responsible for the well or production facility.
- Author’s statement:
To protect the state against the risk of an orphaned well after a transfer from one owner to another, AB 1167 adjusted the required indemnity bond amount to be sufficient to cover, in full, all costs of plugging and abandonment and site restoration. Since the law was changed, nearly all well transfers have stopped.
If transfer approvals continue to stagnate, current well operators may abandon hazardous wells, leading to greater financial and environmental burdens for the state.
AB 2716 delivers the legislative revisions that Governor Newsom called for when he signed AB 1167 by giving oil and gas well operators greater financial flexibility to cover the cost of plugging idle wells after a transfer of ownership, reducing the occurrence of orphaned wells and protecting California’s environment and public health.
- Committee amendments. The committee may wish to consider amending the bill as follows:
- Increase the bonding cap in PRC 3205.3 and tier the bonding amounts by well ownership.
- Qualify the use of self-insurance and corporate guarantees to provide that only operators with idle well management plans and solid finances are eligible to purchase/acquire wells.
- Provide asset retirement obligations to be qualified as an equally effective means of financial assurance.
- Require additional information to be provided to CalGEM for a person acquiring a well solely for the purpose of plugging and abandoning the well.
- Require CalGEM to report the Legislature.
- Make this contingent upon the enactment of AB 2461 (Hart).
- Related legislation. AB 2461 (Hart) Extends the bonding requirements under AB 1167 to a person who acquires, or intends to acquire, as applicable, the right to control a well or production facility. Provides that, for purposes of filing an indemnity bond, a person who “acquires a right to operate or control a well or production facility” includes, but is not limited to, the direct or indirect sale or exchange in a single or series of related transactions by the stockholders of the operator of more than 50% of the voting stock of the operator and a liquidation or dissolution of the operator, among other transactions. This bill is referred to the Assembly Natural Resources Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
California Chamber of Commerce
California Independent Petroleum Association
Western States Petroleum Association
Opposition
350 Bay Area Action
Center for Biological Diversity
Center on Race, Poverty & the Environment
Cerbat
Clean & Healthy California
Cleanearth4kids.org
Climate First: Replacing Oil & Gas
Courage California
Environment California
Environmental Defense Center
Epic - Environmental Protection Information Center
Food & Water Watch
Fossil Free California
Fractracker Alliance
Greenpeace USA
Long Beach Alliance for Clean Energy
Natural Resources Defense Council
Physicians for Social Responsibility - Los Angeles
Redeemer Community Partnership
San Diego 350
San Francisco Bay Physicians for Social Responsibility
San Francisco Baykeeper
Sierra Club California
Sunflower Alliance
The Climate Center
Wholly H2o
Analysis Prepared by: Paige Brokaw / NAT. RES. /
See author’s statement for AB 1167 (Carillo) in Assembly Natural Resources Committee analysis, March 27, 2023 ↑
Discussed in Hearing
Senate Standing Committee on Appropriations
Senate Standing Committee on Natural Resources and Water
Assembly Floor
Assembly Standing Committee on Natural Resources
Bill Author
Bill Co-Author(s):