SB 1324: Passenger and freight rail: LOSSAN Rail Corridor: working group report.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-08-27
Current Status:
Passed
(2026-08-27: Chaptered by Secretary of State. Chapter 158, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law establishes the Department of Transportation in the Transportation Agency. Existing law authorizes the department, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
Existing law requires the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, representatives from county transportation commissions and metropolitan planning organizations from specified counties. Existing law requires the working group to submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor.
This bill would instead require the working group to submit this report to the Legislature on or before February 1, 2027. By extending the duties of representatives of local agencies, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency. Existing law authorizes the department, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
Existing law requires the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, representatives from county transportation commissions and metropolitan planning organizations from specified counties. Existing law requires the working group to submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor.
This bill would instead require the working group to submit this report to the Legislature on or before February 1, 2027. By extending the duties of representatives of local agencies, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency. Existing law authorizes the department department, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would state the intent of the Legislature to enact subsequent legislation related to the management and performance of the LOSSAN Rail Corridor.Existing law requires the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, representatives from county transportation commissions and metropolitan planning organizations from specified counties. Existing law requires the working group to submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor.
This bill would instead require the working group to submit this report to the Legislature on or before February 1, 2027. By extending the duties of representatives of local agencies, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency. Existing law authorizes the department subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would state the intent of the Legislature to enact subsequent legislation related to the management and performance of the LOSSAN Rail Corridor.
(a)(1)Upon appropriation by the Legislature for purposes of this subdivision, the secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature no later than two years after an appropriation is made by the Legislature for purposes of this subdivision regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(B)Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals consistent with the State Rail Plan prepared pursuant to Section 14036. Each prioritized capital improvement project identified pursuant to this subparagraph shall indicate in the report whether it is aligned with the near-term, mid-term, or long-term planning year horizons identified in the State Rail Plan and shall indicate in the report the specific service outcomes tied to the project.
(C)Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(E)Recommendations for the corridor to connect with other passenger rail services.
(F)Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported intercity service, including an analysis of available technologies and necessary corridor infrastructure. The recommendations made pursuant to this subparagraph shall identify efforts by the Southern California Regional Rail Authority and the North County Transit District to achieve zero-emission services, and opportunities to coordinate those efforts and ensure interoperability between those zero-emission services.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)A description of coordination activities through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code.
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans, studies, reports, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency, the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission, and the report submitted to the Legislature pursuant to subdivision (c).
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency, as needed for technical and subject matter assistance.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, recommended strategies and plans to address any funding shortfall, and next steps for site-specific project analysis and environmental review documents. In identifying projects pursuant to paragraph (1), if the secretary does not identify a project that is included in the 2024 LOSSAN Rail Corridor Agency Business Plan and has approved environmental or programmatic documents, or if the secretary includes a modified version of one of those projects, the secretary shall explain in the report why the project was excluded or why the project was included in a modified version, as applicable.
(b)The secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(7)The Division of Rail in the department.
(c)(1)The working group convened pursuant to subdivision (b) shall submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2027, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
(A)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(B)Alternative management and operations models or structures that improve intercity and regional rail services.
(C)Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures. In making recommendations and providing feedback pursuant to this subparagraph, the working group shall review how local and regional planning agencies responsible for recommending transportation strategies include information about train service, operations, capital projects, resiliency, and performance in their respective planning documents, including, but not limited to, sustainable communities strategies, regional transportation plans, transportation demand management plans, and long-range transportation plans.
(D)Coordination of planning and project development through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code to streamline processes and expand opportunities for federal capital funding.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(3)The working group shall recognize the ownership and rights held in the LOSSAN Rail Corridor, and past and ongoing service, operations, and capital investments made by the member agencies of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District.
(4)The recommendations required pursuant to this subdivision shall be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(5)Before submitting the report to the Legislature pursuant to this subdivision, the working group shall submit the recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the report required pursuant to this subdivision.
(6)The secretary and working group may also include information in the report required pursuant to this subdivision regarding where additional follow-up discussion or action is needed.
(7)The requirement for submitting a report imposed under this subdivision is inoperative on February 1, 2030, pursuant to Section 10231.5.
(d)(1)The reports to be submitted pursuant to subdivisions (a) and (c) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is inoperative four years after the date that the report described in subdivision (a) is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)(1)Upon appropriation by the Legislature for purposes of this subdivision, the secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature no later than two years after an appropriation is made by the Legislature for purposes of this subdivision regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(B)Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals consistent with the State Rail Plan prepared pursuant to Section 14036. Each prioritized capital improvement project identified pursuant to this subparagraph shall indicate in the report whether it is aligned with the near-term, mid-term, or long-term planning year horizons identified in the State Rail Plan and shall indicate in the report the specific service outcomes tied to the project.
(C)Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(E)Recommendations for the corridor to connect with other passenger rail services.
(F)Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported intercity service, including an analysis of available technologies and necessary corridor infrastructure. The recommendations made pursuant to this subparagraph shall identify efforts by the Southern California Regional Rail Authority and the North County Transit District to achieve zero-emission services, and opportunities to coordinate those efforts and ensure interoperability between those zero-emission services.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)A description of coordination activities through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code.
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans, studies, reports, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency, the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission, and the report submitted to the Legislature pursuant to subdivision (c).
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency, as needed for technical and subject matter assistance.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, recommended strategies and plans to address any funding shortfall, and next steps for site-specific project analysis and environmental review documents. In identifying projects pursuant to paragraph (1), if the secretary does not identify a project that is included in the 2024 LOSSAN Rail Corridor Agency Business Plan and has approved environmental or programmatic documents, or if the secretary includes a modified version of one of those projects, the secretary shall explain in the report why the project was excluded or why the project was included in a modified version, as applicable.
(b)The secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(7)The Division of Rail in the department.
(c)(1)The working group convened pursuant to subdivision (b) shall submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2027, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
(A)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(B)Alternative management and operations models or structures that improve intercity and regional rail services.
(C)Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures. In making recommendations and providing feedback pursuant to this subparagraph, the working group shall review how local and regional planning agencies responsible for recommending transportation strategies include information about train service, operations, capital projects, resiliency, and performance in their respective planning documents, including, but not limited to, sustainable communities strategies, regional transportation plans, transportation demand management plans, and long-range transportation plans.
(D)Coordination of planning and project development through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code to streamline processes and expand opportunities for federal capital funding.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(3)The working group shall recognize the ownership and rights held in the LOSSAN Rail Corridor, and past and ongoing service, operations, and capital investments made by the member agencies of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District.
(4)The recommendations required pursuant to this subdivision shall be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(5)Before submitting the report to the Legislature pursuant to this subdivision, the working group shall submit the recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the report required pursuant to this subdivision.
(6)The secretary and working group may also include information in the report required pursuant to this subdivision regarding where additional follow-up discussion or action is needed.
(7)The requirement for submitting a report imposed under this subdivision is inoperative on February 1, 2030, pursuant to Section 10231.5.
(d)(1)The reports to be submitted pursuant to subdivisions (a) and (c) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is inoperative four years after the date that the report described in subdivision (a) is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)(1)Upon appropriation by the Legislature for purposes of this subdivision, the secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature no later than two years after an appropriation is made by the Legislature for purposes of this subdivision regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(B)Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals consistent with the State Rail Plan prepared pursuant to Section 14036. Each prioritized capital improvement project identified pursuant to this subparagraph shall indicate in the report whether it is aligned with the near-term, mid-term, or long-term planning year horizons identified in the State Rail Plan and shall indicate in the report the specific service outcomes tied to the project.
(C)Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(E)Recommendations for the corridor to connect with other passenger rail services.
(F)Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported intercity service, including an analysis of available technologies and necessary corridor infrastructure. The recommendations made pursuant to this subparagraph shall identify efforts by the Southern California Regional Rail Authority and the North County Transit District to achieve zero-emission services, and opportunities to coordinate those efforts and ensure interoperability between those zero-emission services.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)A description of coordination activities through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code.
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans, studies, reports, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency, the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission, and the report submitted to the Legislature pursuant to subdivision (c).
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency, as needed for technical and subject matter assistance.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, recommended strategies and plans to address any funding shortfall, and next steps for site-specific project analysis and environmental review documents. In identifying projects pursuant to paragraph (1), if the secretary does not identify a project that is included in the 2024 LOSSAN Rail Corridor Agency Business Plan and has approved environmental or programmatic documents, or if the secretary includes a modified version of one of those projects, the secretary shall explain in the report why the project was excluded or why the project was included in a modified version, as applicable.
(b)The secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(7)The Division of Rail in the department.
(c)(1)The working group convened pursuant to subdivision (b) shall submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, 2027, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
(A)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(B)Alternative management and operations models or structures that improve intercity and regional rail services.
(C)Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures. In making recommendations and providing feedback pursuant to this subparagraph, the working group shall review how local and regional planning agencies responsible for recommending transportation strategies include information about train service, operations, capital projects, resiliency, and performance in their respective planning documents, including, but not limited to, sustainable communities strategies, regional transportation plans, transportation demand management plans, and long-range transportation plans.
(D)Coordination of planning and project development through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code to streamline processes and expand opportunities for federal capital funding.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(3)The working group shall recognize the ownership and rights held in the LOSSAN Rail Corridor, and past and ongoing service, operations, and capital investments made by the member agencies of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District.
(4)The recommendations required pursuant to this subdivision shall be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(5)Before submitting the report to the Legislature pursuant to this subdivision, the working group shall submit the recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the report required pursuant to this subdivision.
(6)The secretary and working group may also include information in the report required pursuant to this subdivision regarding where additional follow-up discussion or action is needed.
(7)The requirement for submitting a report imposed under this subdivision is inoperative on February 1, 2030, pursuant to Section 10231.5.
(d)(1)The reports to be submitted pursuant to subdivisions (a) and (c) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is inoperative four years after the date that the report described in subdivision (a) is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
SECTION 1.It is the intent of the Legislature to enact subsequent legislation related to the management and performance of the LOSSAN Rail Corridor.It is the intent of the Legislature to enact subsequent legislation related to the management and performance of the LOSSAN Rail Corridor.
|
Date
|
Status
|
|---|---|
| Aug 27, 2026 | Chaptered by Secretary of State. Chapter 158, Statutes of 2026. |
| Aug 27, 2026 | Approved by the Governor. |
| Aug 18, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 13, 2026 | In Senate. Ordered to engrossing and enrolling. |
| Aug 13, 2026 | Read third time. Passed. (Ayes 72. Noes 0. Page 6159.) Ordered to the Senate. |
| Aug 13, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 6, 2026 | Read second time. Ordered to consent calendar. |
| Aug 5, 2026 | From committee: Do pass. Ordered to consent calendar. (Ayes 15. Noes 0.) (August 5). |
| Jun 30, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 15. Noes 0.) (June 29). Re-referred to Com. on APPR. |
| May 11, 2026 | Referred to Com. on TRANS. |
| Apr 30, 2026 | In Assembly. Read first time. Held at Desk. |
| Apr 30, 2026 | Read third time. Passed. (Ayes 36. Noes 0. Page 4114.) Ordered to the Assembly. |
| Apr 30, 2026 | Read third time. Passed. (Ayes 36. Noes 0.) Ordered to the Assembly. |
| Apr 28, 2026 | Read second time. Ordered to consent calendar. |
| Apr 27, 2026 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Apr 17, 2026 | Set for hearing April 27. |
| Apr 15, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 12. Noes 0.) (April 14). Re-referred to Com. on APPR. |
| Apr 15, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 12. Noes 0. Page 3873.) (April 14). Re-referred to Com. on APPR. |
| Apr 9, 2026 | Set for hearing April 14. |
| Apr 8, 2026 | Re-referred to Com. on TRANS. |
| Mar 23, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 4, 2026 | Referred to Com. on RLS. |
| Feb 23, 2026 | Read first time. |
| Feb 23, 2026 | From printer. May be acted upon on or after March 23. |
| Feb 20, 2026 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 13, 2026 | SB 1324 Blakespear Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Aug 5, 2026 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 29, 2026 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Transportation |
Passed |
|
| Apr 30, 2026 | Consent Calendar 2nd SB1324 Blakespear | Senate Floor |
Passed |
|
| Apr 14, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Transportation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1324
Author:(Blakespear) – As Amended Ver:March 23, 2026
Policy Committee: | Transportation | Vote: | 15 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: Yes
SUMMARY:
This bill extends by one year, from February 1, 2026, to February 1, 2027, the date by which a report on recommendations of the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor working group is to be submitted to the Legislature.
FISCAL EFFECT:
No new state costs.
COMMENTS:
Background State law defines several intercity rail corridors, among them the San Diego-Los Angeles-San Luis Obispo intercity passenger rail corridor, defined in statute as the LOSSAN Rail Corridor. The state-supported Pacific Surfliner intercity passenger rail service operates on the LOSSAN Rail Corridor and is one of the busiest intercity passenger rail services in the country.
Statute authorizes the LOSSAN Rail Corridor Agency to oversee operation of the Pacific Surfliner and to increase ridership, revenue, capacity, reliability, coordination and safety on the LOSSAN Rail Corridor. The agency is a joint powers authority composed of 11 voting members representing rail owners, operators, and planning agencies along the corridor. The Orange County Transportation Authority (OCTA) serves as the managing agency for the LOSSAN Rail Corridor Agency and provides management and administrative support to the agency.
Ridership on the LOSSAN dropped considerably following outbreak of the COVID-19 pandemic. Subsequently, for much of 2021 and 2022, rail service on the corridor was suspended in the face of repeated landslides and rockslides that pushed the rails dangerously seaward.
In 2024, the author of this bill introduced SB 1098, Chapter 777, Statutes of 2024, which, among other things, required several reports on LOSSAN, including a report by a working group of state and local agencies and various stakeholders to provide feedback on consensus recommendations regarding the long-term viability of comprehensive and coordinated passenger and freight services on the LOSSAN corridor. SB 1098 set a due date for the working group report of February 1, 2026; however, the working group has yet to submit the report.
According to the author, this bill “restates the urgency for action while the report is being finalized.”
There is neither support nor opposition registered for or against this bill.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 29, 2026
ASSEMBLY COMMITTEE ON TRANSPORTATION
Lori D. Wilson, Chair
SBPCA Bill Id:SB 1324
Author:(Blakespear) – As Amended Ver:March 23, 2026
SENATE VOTE: 36-0
SUBJECT: Passenger and freight rail: LOSSAN Rail Corridor: working group report
SUMMARY: Extends the deadline for the report from the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor working group on consensus recommendations relating to service in the corridor from February 1, 2026, to February 1, 2027.
EXISTING LAW:
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services. (Government Code section (GOV) 14070.6)
- Provides funding for intercity passenger rail service from a portion of the sales tax on diesel fuel through the Public Transportation Account. (Public Utility Code section (PUC) 99312.3)
- Authorizes Caltrans, subject to approval of the Secretary of Transportation (the Secretary), to enter into an interagency transfer agreement under which a Joint Powers Authority (JPA) assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor. (GOV 14070.2)
- Authorizes the Capitol Corridor JPA, San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service and defines each corridor. (GOV 2.3.5.1 Articles 5.2, 5.4, 5.6)
- Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. (GOV 14072)
- Requires the preparation of an annual Business Plan, due to the Secretary by April 1 every year, for the corridor by each participating JPA board of directors. (GOV 14070.4)
- Requires the Secretary to convene a working group that includes, but is not limited to (GOV 14072.6(b)):
- LOSSAN Rail Corridor track owners;
- LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services;
- The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura;
- The Metropolitan Planning Organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura;
- Business, community, transportation, environmental, labor, and civic organizations;
- The California Coastal Commission; and,
- The Caltrans Division of Rail and Mass Transportation.
- Requires the working group to submit a report to the Legislature on or before February 1, 2026, addressing the long-term viability of comprehensive and coordinated passenger and freight rail services in and around the LOSSAN corridor. The report must include, among other items (GOV 14072.6(c)):
- Strategies to increase rail service coordination and reduce disruptions or delays;
- Alternative management and operations models or structures that improve intercity and regional rail services; and,
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
FISCAL EFFECT: Unknown
COMMENTS: Intercity rail in California. California is home to three of the six busiest Amtrak intercity passenger rail routes in the nation. The Capitol Corridor service in Northern California covers 170 miles, with 18 stations, connecting Auburn to San Jose. The San Joaquins, recently renamed the Gold Runner, serves the Central Valley. In Southern California, the Pacific Surfliner service is a 351-mile coastal corridor that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Collectively, these lines serve roughly 4 million passengers annually, with the Pacific Surfliner serving roughly 2 million passengers annually alone, making it the second busiest intercity passenger rail route in the nation. Currently, all three intercity rail service lines are managed by local JPAs while Caltrans remains responsible for providing state funding for each intercity rail line.
Historically, the intercity rail lines were partially funded by the federal government through Amtrak operations. However, with the passage of the Passenger Rail Investment and Improvement Act of 2008 (PRIIA), states were required to assume full funding of these lines. In California, the three intercity rail lines are funded from a portion of the sales tax on diesel fuel, which has recently increased to roughly $200 million per year. With the passage of SB 1 (Beall, Chapter 5, Statutes of 2017), the three intercity rail providers also receive an additional roughly $20 million per year for capital and operations support from the State Rail Assistance program. Additionally, there are other funding sources for capital improvements for intercity rail including the Transit Intercity Rail Capital Program and the Interregional Transportation Improvement Program.
The statutes governing the JPAs define the specific corridors in which they are authorized to operate and provide service. Specifically, the Capitol Corridor is defined to extend from Colfax to San Jose. The San Joaquins corridor is defined as Los Angeles through Bakersfield to Oakland and Sacramento. The Pacific Surfliner operates in the so-called LOSSAN corridor, defined as San Diego through Los Angeles to San Luis Obispo.
In Southern California, the LOSSAN Rail Corridor Agency runs the Pacific Surfliner service, a 351-mile coastal corridor that runs from San Diego to San Luis Obispo. Pre-COVID the service had 3 million annual riders with 26 daily trains, or 13 daily round trips. To accommodate the drastic decline in ridership during the pandemic, service was reduced to 12 daily trains. Despite track closures and the lack of ridership return post-COVID, the Pacific Surfliner service has, as of January 2026, returned to its pre-COVID level of 26 daily trains. Ridership however remains lower, with just under 2 million annual riders as of mid-2025.
In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the North County Transit District (NCTD) Coaster commuter rail, Metrolink, the Burlington Northern Santa Fe Railroad (BNSF), and the Union Pacific railroad. Each member agency or host railroad is responsible for the implementation of its respective capital improvement projects, however the LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
As noted above, LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Pre-COVID, between Coaster, Metrolink, and Surfliner services, the LOSSAN corridor carried 8 million passengers a year. Based on numbers from FY 2024, ridership across these services had only reached roughly 4.5 million. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
The LOSSAN Agency is governed by a Board of Directors composed of 11 voting members representing rail owners, operators, and planning agencies along the LOSSAN rail corridor, as well as four non-voting, ex-officio members. Specifically, the voting member agencies include San Diego Metropolitan Transit System, San Diego Association of Governments (SANDAG), NCTD, the Orange County Transportation Authority (OCTA), Riverside County Transportation Commission, Los Angeles County Metropolitan Transportation Authority, Ventura County Transportation Commission, Santa Barbara County Association of Governments, and San Luis Obispo Council of Governments.
Every year, the LOSSAN Agency is statutorily required to submit a business plan to the California State Transportation Agency (CalSTA) by April 1. The primary purpose of the business plan is to identify the major goals and objectives for the LOSSAN agency’s management of the Pacific Surfliner, as well as the budget necessary to administer, market, and operate the service during the upcoming two-year period. The business plan also summarizes operations, service levels, budget, and capital improvements that have contributed to the success of the Pacific Surfliner service and identifies improvements to sustain and grow its success moving forward. As a result of SB 677 (Blakespear, Chapter 407, Statutes of 2023), future business plans are required to include a discussion of climate change issues for the corridor and highlight projects that are directly related to climate resiliency.
The LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time.
Over the past decade, numerous incidents, including landslides, heavy rain, and storm surge have shifted tracks along the right-of-way, forcing extended track closures. For example, storm surge in September 2022 triggered a landslide that necessitated immediate track closure and nearly $14 million in repairs. Such events have continued to occur, especially on the busiest section of the route between Orange and San Diego counties. In particular, track near the cities of San Clemente, Mariposa, and Del Mar has faced particular climate related challenges. Overall, such issues have cost tens of millions of dollars to address and have substantially interrupted service along the corridor.
As a result of these issues, several efforts are underway to find long-term solutions. For example, in San Diego County, SANDAG and NCTD have been leading efforts to stabilize portions of the coastal bluffs in the City of Del Mar to protect the railroad from erosion, landslides, and seismic events. Specifically, Phase 5 of the Del Mar stabilization project will install additional columns to support the railroad, reinforce the bluffs, and install retaining walls, drainage improvements, and other stabilization and erosion control measures on the upper bluffs, bluff face, and new sea walls to protect the bluff toe. The project began construction in 2024 and is estimated to be completed in 2027 at an estimated cost of $88 million.
Beyond the Del Mar stabilization project, SANDAG is also leading the San Diego Regional Rail Alterative Alignment and Improvements study to analyze ways to reduce travel times, enhance safety, and increase capacity along the San Diego segment of the corridor. One aspect of the study is to evaluate potential double track alignments between San Dieguito and Sorrento Valley that would move the tracks completely off the eroding bluffs. As part of the FY 2023 state budget, SANDAG was allocated $300 million to begin environmental analysis, study potential impacts, address stakeholder concerns, and identify future costs of the project. As of April 2026 a draft environmental impact report has been released and geotechnical testing in the area is ongoing.
Meanwhile, OCTA is leading the Orange County Coastal Rail Resiliency Study to assess existing and future environmental risks and issues with operations and maintenance along the LOSSAN Rail Corridor while evaluating strategies to address these challenges. The initial assessment is now published and focuses on providing an existing conditions assessment of the rail corridor by identifying areas that are susceptible to risk from bluff failures and coastal erosion in the next two years. This initial assessment also calls for a better defining of roles and responsibilities of key stakeholders along the corridor and the development of an implementation plan for resiliency along the entire corridor. A final report on the full scope of the study and its recommendations is expected in the summer of 2026.
In 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the corridor. Specifically, the subcommittee is chaired by the author, Senator Blakespear (D-Encinitas), and currently includes as members Senator Bob Archuleta (D-Pico Rivera) and Senator Tony Strickland (R-Huntington Beach). The subcommittee has conducted nine hearings since 2023, including most recently in February of 2026.
On January 9, 2024, the subcommittee submitted a letter to CalSTA requesting the agency prioritize working with the subcommittee to formalize a partnership to convene, coordinate, and arbitrate among stakeholders’ priorities to result in ridership increases and prioritized capital investments; restoring cut service and beginning service expansions as soon as possible; identifying resources needed to achieve the goals outlined in the State Rail Plan specific to the LOSSAN rail line; and identifying a new non-rail funding source for emergency bus services during track closures.
CalSTA responded to this letter in mid-March 2024 describing their activities to help with current emergency projects and identifying the role they can play in long-term planning on the corridor. Specifically, the letter notes coordination CalSTA can provide with the Federal Railroad Administration and the opportunity for CalSTA to lead efforts on executing memoranda of understanding among partner agencies on the corridor.
In 2024 the Legislature passed, and the Governor signed into law, SB 1098 (Blakespear, Chapter 777, Statutes of 2024). The bill aimed to provide guidance, recommendations, and increase coordination between stakeholders to ensure the overall performance of the LOSSAN Rail Corridor. Specifically, the bill required the compilation of three different reports about various aspects of the corridor’s performance.
The first of these reports is to be prepared by the Secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency. This report is supposed to provide a baseline summary of the transportation and environmental conditions along the LOSSAN corridor as of January 1, 2025. As part of this, the report must include, among other things, a list of prioritized capital improvement projects; a description of actions taken by CalSTA to improve operations and performance; strategies for supporting and improving existing rail service; and strategies and recommendations to support coastal hazard resiliency planning in the corridor. The report is initially due “upon appropriation” and then every two years thereafter. As of April 2026 no funding has been appropriated and the first report has not been prepared.
The second of these reports is to be prepared by a working group, convened by the Secretary, that consists of LOSSAN Rail Corridor track owners; LOSSAN Rail Corridor passenger and freight rail operators; the county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura; the Metropolitan Planning Organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura; business, community, transportation, environmental, labor, and civic organizations; the California Coastal Commission; and the Caltrans Division of Rail and Mass Transportation. Such a working group had previously been convened in 2024 before the passage of SB 1098.
This report is required to provide feedback on consensus recommendations regarding the long-term viability of comprehensive and coordinated passenger and freight services on the LOSSAN corridor. The report must include, among other things, strategies to increase rail service coordination and reduce disruptions or delays; alternative management and operations models or structures that improve intercity and regional rail services; and changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services. Furthermore, the working group must consider the known and expected impacts of recommendations on the coastal environment and local communities and engage in meaningful public engagement.
This report was due February 1, 2026, but as of June 2026 has not been released. The LOSSAN Working Group met four times between February 19th and May 11th, all past the due date of the report to the Legislature. On June 10, 2026, CalSTA released a draft SB 1098 report for public comment. Comments are due back on July 3rd, 2026.
According to the author, “The LOSSAN rail corridor is 351 miles and connects six Southern California counties. Historically, the LOSSAN rail corridor is the busiest state-supported intercity rail corridor in the country and has had years of sustained passenger rail ridership growth. The last decade, however, has shown that the current funding and management models are no longer viable. The line is struggling with lower ridership since 2020, mounting infrastructure needs and changing travel demands. SB 1098 created a work group chaired by CalSTA with the rail line’s stakeholders and directed it to develop a report for the Legislature on needed reforms. The report, due on Feb. 1, 2026, has not been completed. This legislation restates the urgency for action while the report is being finalized.”
Previous legislation. SB 1098 (Blakespear) Chapter 777, Statutes of 2024 mandated various reports and working groups to provide guidance, recommendations, and increase coordination between stakeholders to ensure overall performance of the LOSSAN Rail Corridor. SB 1098 required, upon appropriation and every two years thereafter, a report to the Legislature on the baseline conditions along the rail corridor; the convening of a working group to make consensus recommendations regarding the long-term viability of the corridor, with a report to the Legislature from the working group on these recommendations by February 1, 2026; and a report to the Legislature, upon appropriation and every three years thereafter, on the performance of the LOSSAN Rail Corridor.
SB 677 (Blakespear) Chapter 407, Statutes of 2023 required the LOSSAN Rail Corridor Agency as a part of the annual business plan to describe the effects of climate change on the corridor, identify projects to increase climate resiliency, and discuss funding options for these projects.
SB 742 (Allen) Chapter 652, Statutes of 2019 made various changes to provisions relating to the state's intercity thruway bus services.
SB 477 (Cannella) of 2017 would have authorized a local JPA operating intercity rail service to expand service beyond its statutorily defined corridor if specific conditions are met. This bill was held in the Assembly Appropriations Committee.
SB 1 (Beall) Chapter 5, Statutes of 2017 provided approximately $5.2 billion per year in new funding for highways, transit and active transportation programs.
SB 1225 (Padilla) Chapter 802, Statutes of 2012 authorized an interagency transfer agreement to be entered into with a local JPA to provide intercity rail service in the LOSSAN Corridor if specific conditions are met.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
None on file
Analysis Prepared by: David Sforza / TRANS. / (916) 319-2093
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1324 |
CONSENT
Bill No: SB 1324
Author: Blakespear (D)
Amended: 3/23/26
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/14/26
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Dahle, Gonzalez, Grayson, Menjivar, Richardson, Seyarto, Wiener
NO VOTE RECORDED: Valladares
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: Passenger and freight rail: LOSSAN Rail Corridor: working group report
SOURCE: Author
DIGEST:
This bill extends the deadline for the report from the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor working group on consensus recommendations relating to service in the corridor from February 1, 2026, to February 1, 2027.
ANALYSIS:
Existing law:
- Authorizes the Capitol Corridor Joint Powers Authority (JPA), San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service and defines each corridor. (Government Code (GOV) 2.3.5.1 Articles 5.2, 5.4, 5.6)
- Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. (GOV § 14072)
- Requires the preparation of an annual Business Plan, due to the Secretary by April 1 every year, for the corridor by each participating JPA board of directors. (GOV § 14070.4)
- Requires the Secretary to convene a working group that includes, but is not limited to (GOV § 14072.6(b)):
- LOSSAN Rail Corridor track owners;
- LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services;
- The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura;
- The Metropolitan Planning Organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura;
- Business, community, transportation, environmental, labor, and civic organizations;
- The California Coastal Commission; and,
- The Caltrans Division of Rail and Mass Transportation.
- Requires the working group to submit a report to the Legislature on or before February 1, 2026, addressing the long-term viability of comprehensive and coordinated passenger and freight rail services in and around the LOSSAN corridor. The report must include, among other items (GOV 14072.6(c)):
- Strategies to increase rail service coordination and reduce disruptions or delays;
- Alternative management and operations models or structures that improve intercity and regional rail services; and,
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
This bill extends the deadline for the LOSSAN Corridor working group report from February 1, 2026, to February 1, 2027.
Comments
Purpose of this bill. According to the author, “The LOSSAN rail corridor is 351 miles and connects six Southern California counties. Historically, the LOSSAN rail corridor is the busiest state-supported intercity rail corridor in the country and has had years of sustained passenger rail ridership growth. The last decade, however, has shown that the current funding and management models are no longer viable. The line is struggling with lower ridership since 2020, mounting infrastructure needs and changing travel demands. SB 1098 created a work group chaired by CalSTA with the rail line’s stakeholders and directed it to develop a report for the Legislature on needed reforms. The report, due on Feb. 1, 2026, has not been completed. This legislation restates the urgency for action while the report is being finalized.”
LOSSAN Rail Corridor Agency. The Pacific Surfliner is one of three intercity rail services in California. It operates in the so-called LOSSAN corridor, defined as a 351-mile coastal corridor that runs from San Diego through Los Angeles to San Luis Obispo. Pre-COVID the service had 3 million annual riders with 26 daily trains, or 13 daily round trips. To accommodate the drastic decline in ridership during the pandemic, service was reduced to 12 daily trains. Despite track closures and the lack of ridership return post-COVID, the Pacific Surfliner service has, as of January 2026, returned to its pre-COVID level of 26 daily trains. Ridership however remains lower, with just under 2 million annual riders as of mid-2025.
In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the North County Transit District Coaster commuter rail, Metrolink, the Burlington Northern Santa Fe Railroad, and the Union Pacific railroad. LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Pre-COVID, between Coaster, Metrolink, and Surfliner services, the LOSSAN corridor carried 8 million passengers a year. Based on numbers from fiscal year 2024, ridership across these services had only reached roughly 4.5 million. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
Every year, the LOSSAN Agency is statutorily required to submit a business plan to the California State Transportation Agency (CalSTA) by April 1. The primary purpose of the business plan is to identify the major goals and objectives for the LOSSAN agency’s management of the Pacific Surfliner, as well as the budget necessary to administer, market, and operate the service during the upcoming two-year period. As a result of SB 677 (Blakespear, Chapter 407, Statutes of 2023), future business plans are required to include a discussion of climate change issues for the corridor and highlight projects that are directly related to climate resiliency.
Corridor of Concern. The LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time.
Over the past decade, numerous incidents, including landslides, heavy rain, and storm surge have shifted tracks along the right-of-way, forcing extended track closures. For example, storm surge in September 2022 triggered a landslide that necessitated immediate track closure and nearly $14 million in repairs. Such events have continued to occur, especially on the busiest section of the route between Orange and San Diego counties. In particular, track near the cities of San Clemente, Mariposa, and Del Mar has faced particular climate related challenges. Overall, such issues have cost tens of millions of dollars to address and have substantially interrupted service along the corridor.
SB 1098 Reports. In 2024 the Legislature passed, and the Governor signed into law, SB 1098 (Blakespear, Chapter 777, Statutes of 2024). The bill aimed to provide guidance, recommendations, and increase coordination between stakeholders to ensure the overall performance of the LOSSAN Rail Corridor. Specifically, the bill required the compilation of three different reports about various aspects of the corridor’s performance.
One of these reports is to be prepared by the Secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency. This report is supposed to provide a baseline summary of the transportation and environmental conditions along the LOSSAN corridor as of January 1, 2025. Another of these reports is a corridor performance report submitted by the Secretary in coordination with stakeholders and operators along the LOSSAN corridor. Neither of these reports have been prepared to date.
The last of these reports is to be prepared by a working group, convened by the Secretary, that consists of LOSSAN Rail Corridor track owners; LOSSAN Rail Corridor passenger and freight rail operators; the county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura; the Metropolitan Planning Organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura; business, community, transportation, environmental, labor, and civic organizations; the California Coastal Commission; and the Caltrans Division of Rail and Mass Transportation. Such a working group had previously been convened in 2024 before the passage of SB 1098.
This report is required to provide feedback on consensus recommendations regarding the long-term viability of comprehensive and coordinated passenger and freight services on the LOSSAN corridor. The report must include, among other things, strategies to increase rail service coordination and reduce disruptions or delays; alternative management and operations models or structures that improve intercity and regional rail services; and changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services. Furthermore, the working group must consider the known and expected impacts of recommendations on the coastal environment and local communities and engage in meaningful public engagement. This report was due February 1, 2026, but as of early April 2026 has not been released. Since the passage of SB 1098, the working group has only met twice, on February 19, 2026, and March 27, 2026. It plans to meet again at the end of April 2026.
Waiting on reports. As discussed above, none of the reports mandated by SB 1098 have been released. This includes the report from the LOSSAN Corridor working group on the long-term-viability of freight and passenger services on the corridor. SB 1324 extends the deadline for that report from February 1, 2026, to February 1, 2027. The author of SB 1324 is waiting for this report and plans to possibly incorporate recommendations from the report into this bill. CalSTA has estimated that the report will be released in May, however several working group meetings still need to be completed, and draft reports must be prepared before the final version can be released.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 4/27/26)
None received
OPPOSITION: (Verified 4/27/26)
Prepared by: Samuel Myers / TRANS. / (916) 651-4879
4/28/26 16:33:41
**** END ****
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/14/2026
Author: | Blakespear | ||
Version: | 3/23/2026 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Samuel Myers | ||
SUBJECT:
DIGEST: This bill would extend the deadline for the report from the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor working group on consensus recommendations relating to service in the corridor from February 1, 2026, to February 1, 2027.
ANALYSIS:
Existing law:
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services. (GOV 14070.6)
- Provides funding for intercity passenger rail service from a portion of the sales tax on diesel fuel through the Public Transportation Account. (PUC 99312.3)
- Authorizes Caltrans, subject to approval of the Secretary of Transportation (the Secretary), to enter into an interagency transfer agreement under which a Joint Powers Authority (JPA) assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor. (GOV 14070.2)
- Authorizes the Capitol Corridor JPA, San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service and defines each corridor. (GOV 2.3.5.1 Articles 5.2, 5.4, 5.6)
- Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. (GOV 14072)
- Requires the preparation of an annual Business Plan, due to the Secretary by April 1 every year, for the corridor by each participating JPA board of directors. (GOV 14070.4)
- Requires the Secretary to convene a working group that includes, but is not limited to (GOV 14072.6(b)):
- LOSSAN Rail Corridor track owners;
- LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services;
- The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura;
- The Metropolitan Planning Organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura;
- Business, community, transportation, environmental, labor, and civic organizations;
- The California Coastal Commission; and,
- The Caltrans Division of Rail and Mass Transportation.
- LOSSAN Rail Corridor track owners;
- Requires the working group to submit a report to the Legislature on or before February 1, 2026, addressing the long-term viability of comprehensive and coordinated passenger and freight rail services in and around the LOSSAN corridor. The report must include, among other items (GOV 14072.6(c)):
- Strategies to increase rail service coordination and reduce disruptions or delays;
- Alternative management and operations models or structures that improve intercity and regional rail services; and,
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
- Strategies to increase rail service coordination and reduce disruptions or delays;
This bill:
- Extends the deadline for the LOSSAN Corridor working group report from February 1, 2026, to February 1, 2027.
COMMENTS:
Purpose of the bill. According to the author, “The LOSSAN rail corridor is 351 miles and connects six Southern California counties. Historically, the LOSSAN rail corridor is the busiest state-supported intercity rail corridor in the country and has had years of sustained passenger rail ridership growth. The last decade, however, has shown that the current funding and management models are no longer viable. The line is struggling with lower ridership since 2020, mounting infrastructure needs and changing travel demands. SB 1098 created a work group chaired by CalSTA with the rail line’s stakeholders and directed it to develop a report for the Legislature on needed reforms. The report, due on Feb. 1, 2026, has not been completed. This legislation restates the urgency for action while the report is being finalized. ”
Intercity rail in California. California is home to three of the six busiest Amtrak intercity passenger rail routes in the nation. The Capitol Corridor service in Northern California covers 170 miles, with 18 stations, connecting Auburn to San Jose. The San Joaquins, recently renamed the Gold Runner, serves the Central Valley. In Southern California, the Pacific Surfliner service is a 351-mile coastal corridor that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Collectively, these lines serve roughly 4 million passengers annually, with the Pacific Surfliner serving roughly 2 million passengers annually alone, making it the second busiest intercity passenger rail route in the nation. Currently, all three intercity rail service lines are managed by local JPAs while Caltrans remains responsible for providing state funding for each intercity rail line.
Historically, the intercity rail lines were partially funded by the federal government through Amtrak operations. However, with the passage of the Passenger Rail Investment and Improvement Act of 2008 (PRIIA), states were required to assume full funding of these lines. In California, the three intercity rail lines are funded from a portion of the sales tax on diesel fuel, which has recently increased to roughly $200 million per year. With the passage of SB 1 (Beall, Chapter 5, Statutes of 2017), the three intercity rail providers also receive an additional roughly $20 million per year for capital and operations support from the State Rail Assistance program. Additionally, there are other funding sources for capital improvements for intercity rail including the Transit Intercity Rail Capital Program and the Interregional Transportation Improvement Program.
The statutes governing the JPAs define the specific corridors in which they are authorized to operate and provide service. Specifically, the Capitol Corridor is defined to extend from Colfax to San Jose. The San Joaquins corridor is defined as Los Angeles through Bakersfield to Oakland and Sacramento. The Pacific Surfliner operates in the so-called LOSSAN corridor, defined as San Diego through Los Angeles to San Luis Obispo.
LOSSAN Rail Corridor Agency. As mentioned, in Southern California, the LOSSAN Rail Corridor Agency runs the Pacific Surfliner service, a 351-mile coastal corridor that runs from San Diego to San Luis Obispo. Pre-COVID the service had 3 million annual riders with 26 daily trains, or 13 daily round trips. To accommodate the drastic decline in ridership during the pandemic, service was reduced to 12 daily trains. Despite track closures and the lack of ridership return post-COVID, the Pacific Surfliner service has, as of January 2026, returned to its pre-COVID level of 26 daily trains. Ridership however remains lower, with just under 2 million annual riders as of mid-2025.
In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the North County Transit District (NCTD) Coaster commuter rail, Metrolink, the Burlington Northern Santa Fe Railroad (BNSF), and the Union Pacific railroad. Each member agency or host railroad is responsible for the implementation of its respective capital improvement projects, however the LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
As noted above, LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Pre-COVID, between Coaster, Metrolink, and Surfliner services, the LOSSAN corridor carried 8 million passengers a year. Based on numbers from FY 2024, ridership across these services had only reached roughly 4.5 million. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
The LOSSAN Agency is governed by a Board of Directors composed of 11 voting members representing rail owners, operators, and planning agencies along the LOSSAN rail corridor, as well as four non-voting, ex-officio members. Specifically, the voting member agencies include San Diego Metropolitan Transit System, San Diego Association of Governments (SANDAG), NCTD, the Orange County Transportation Authority (OCTA), Riverside County Transportation Commission, Los Angeles County Metropolitan Transportation Authority, Ventura County Transportation Commission, Santa Barbara County Association of Governments, and San Luis Obispo Council of Governments.
Every year, the LOSSAN Agency is statutorily required to submit a business plan to the California State Transportation Agency (CalSTA) by April 1. The primary purpose of the business plan is to identify the major goals and objectives for the LOSSAN agency’s management of the Pacific Surfliner, as well as the budget necessary to administer, market, and operate the service during the upcoming two-year period. The business plan also summarizes operations, service levels, budget, and capital improvements that have contributed to the success of the Pacific Surfliner service and identifies improvements to sustain and grow its success moving forward. As a result of SB 677 (Blakespear, Chapter 407, Statutes of 2023), future business plans are required to include a discussion of climate change issues for the corridor and highlight projects that are directly related to climate resiliency.
Corridor of Concern. The LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time.
Over the past decade, numerous incidents, including landslides, heavy rain, and storm surge have shifted tracks along the right-of-way, forcing extended track closures. For example, storm surge in September 2022 triggered a landslide that necessitated immediate track closure and nearly $14 million in repairs. Such events have continued to occur, especially on the busiest section of the route between Orange and San Diego counties. In particular, track near the cities of San Clemente, Mariposa, and Del Mar has faced particular climate related challenges. Overall, such issues have cost tens of millions of dollars to address and have substantially interrupted service along the corridor.
As a result of these issues, several efforts are underway to find long-term solutions. For example, in San Diego County, SANDAG and NCTD have been leading efforts to stabilize portions of the coastal bluffs in the City of Del Mar to protect the railroad from erosion, landslides, and seismic events. Specifically, Phase 5 of the Del Mar stabilization project will install additional columns to support the railroad, reinforce the bluffs, and install retaining walls, drainage improvements, and other stabilization and erosion control measures on the upper bluffs, bluff face, and new sea walls to protect the bluff toe. The project began construction in 2024 and is estimated to be completed in 2027 at an estimated cost of $88 million.
Beyond the Del Mar stabilization project, SANDAG is also leading the San Diego Regional Rail Alterative Alignment and Improvements study to analyze ways to reduce travel times, enhance safety, and increase capacity along the San Diego segment of the corridor. One aspect of the study is to evaluate potential double track alignments between San Dieguito and Sorrento Valley that would move the tracks completely off the eroding bluffs. As part of the FY 2023 state budget, SANDAG was allocated $300 million to begin environmental analysis, study potential impacts, address stakeholder concerns, and identify future costs of the project. As of April 2026 a draft environmental impact report has been released and geotechnical testing in the area is ongoing.
Meanwhile, OCTA is leading the Orange County Coastal Rail Resiliency Study to assess existing and future environmental risks and issues with operations and maintenance along the LOSSAN Rail Corridor while evaluating strategies to address these challenges. The initial assessment is now published and focuses on providing an existing conditions assessment of the rail corridor by identifying areas that are susceptible to risk from bluff failures and coastal erosion in the next two years. This initial assessment also calls for a better defining of roles and responsibilities of key stakeholders along the corridor and the development of an implementation plan for resiliency along the entire corridor. A final report on the full scope of the study and its recommendations is expected in the summer of 2026.
The Legislature and LOSSAN. In 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the corridor. Specifically, the subcommittee is chaired by the author, Senator Blakespear (D-Encinitas), and currently includes as members Senator Bob Archuleta (D-Pico Rivera) and Senator Tony Strickland (R-Huntington Beach). The subcommittee has conducted nine hearings since 2023, including most recently in February of 2026.
On January 9, 2024, the subcommittee submitted a letter to CalSTA requesting the agency prioritize working with the subcommittee to formalize a partnership to convene, coordinate, and arbitrate among stakeholders’ priorities to result in ridership increases and prioritized capital investments; restoring cut service and beginning service expansions as soon as possible; identifying resources needed to achieve the goals outlined in the State Rail Plan specific to the LOSSAN rail line; and identifying a new non-rail funding source for emergency bus services during track closures.
CalSTA responded to this letter in mid-March 2024 describing their activities to help with current emergency projects and identifying the role they can play in long-term planning on the corridor. Specifically, the letter notes coordination CalSTA can provide with the Federal Railroad Administration and the opportunity for CalSTA to lead efforts on executing memoranda of understanding among partner agencies on the corridor.
SB 1098 Reports. In 2024 the Legislature passed, and the Governor signed into law, SB 1098 (Blakespear, Chapter 777, Statutes of 2024). The bill aimed to provide guidance, recommendations, and increase coordination between stakeholders to ensure the overall performance of the LOSSAN Rail Corridor. Specifically, the bill required the compilation of three different reports about various aspects of the corridor’s performance.
The first of these reports is to be prepared by the Secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency. This report is supposed to provide a baseline summary of the transportation and environmental conditions along the LOSSAN corridor as of January 1, 2025. As part of this, the report must include, among other things, a list of prioritized capital improvement projects; a description of actions taken by CalSTA to improve operations and performance; strategies for supporting and improving existing rail service; and strategies and recommendations to support coastal hazard resiliency planning in the corridor. The report is initially due “upon appropriation” and then every two years thereafter. As of April 2026 no funding has been appropriated and the first report has not been prepared.
The second of these reports is to be prepared by a working group, convened by the Secretary, that consists of LOSSAN Rail Corridor track owners; LOSSAN Rail Corridor passenger and freight rail operators; the county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura; the Metropolitan Planning Organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura; business, community, transportation, environmental, labor, and civic organizations; the California Coastal Commission; and the Caltrans Division of Rail and Mass Transportation. Such a working group had previously been convened in 2024 before the passage of SB 1098.
This report is required to provide feedback on consensus recommendations regarding the long-term viability of comprehensive and coordinated passenger and freight services on the LOSSAN corridor. The report must include, among other things, strategies to increase rail service coordination and reduce disruptions or delays; alternative management and operations models or structures that improve intercity and regional rail services; and changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services. Furthermore, the working group must consider the known and expected impacts of recommendations on the coastal environment and local communities and engage in meaningful public engagement. This report was due February 1, 2026, but as of April 2026 has not been released. Since the passage of SB 1098, the working group has only met twice, on February 19, 2026, and March 27, 2026.
The third report required by SB 1098 is a corridor performance report submitted by the Secretary in coordination with stakeholders and operators along the LOSSAN corridor. This report must include, among other things, performance, ridership, usage, and quality of rail services; progress in delivering fleet and infrastructure improvement projects; updates to technical information, studies, reports, or research relating to the planning, operations, or maintenance of rail services; and updates on corridor resiliency, prepared in coordination with the California Coastal Commission. The report is initially due “upon appropriation” and then every three years thereafter. As of April 2026, no funding has been appropriated and the first report has not been prepared.
Waiting on reports. As discussed above, none of the reports mandated by SB 1098 have been released. This includes the report from the LOSSAN Corridor working group on the long-term-viability of freight and passenger services on the corridor. SB 1324 extends the deadline for that report from February 1, 2026, to February 1, 2027. The author of SB 1324 is waiting for this report and plans to possibly incorporate recommendations from the report into this bill. CalSTA has estimated that the report will be released in May, however several working group meetings still need to be completed, and draft reports must be prepared before the final version can be released.
Related/previous Legislation:
SB 1098 (Blakespear, Chapter 777, Statutes of 2024) – Mandated various reports and working groups to provide guidance, recommendations, and increase coordination between stakeholders to ensure overall performance of the LOSSAN Rail Corridor. SB 1098 required, upon appropriation and every two years thereafter, a report to the Legislature on the baseline conditions along the rail corridor; the convening of a working group to make consensus recommendations regarding the long-term viability of the corridor, with a report to the Legislature from the working group on these recommendations by February 1, 2026; and a report to the Legislature, upon appropriation and every three years thereafter, on the performance of the LOSSAN Rail Corridor.
SB 677 (Blakespear, Chapter 407, Statutes of 2023) – Required the LOSSAN Rail Corridor Agency as a part of the annual business plan to describe the effects of climate change on the corridor, identify projects to increase climate resiliency, and discuss funding options for these projects.
SB 742 (Allen, Chapter 652, Statutes of 2019) – Made various changes to provisions relating to the state's intercity thruway bus services.
SB 477 (Cannella, 2017) – Would have authorized a local JPA operating intercity rail service to expand service beyond its statutorily defined corridor if specific conditions are met. This bill was held in the Assembly Appropriations Committee.
SB 1 (Beall, Chapter 5, Statutes of 2017) – Provided approximately $5.2 billion per year in new funding for highways, transit and active transportation programs.
SB 1225 (Padilla, Chapter 802, Statutes of 2012) – Authorized an interagency transfer agreement to be entered into with a local JPA to provide intercity rail service in the LOSSAN Corridor if specific conditions are met.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
April 8, 2026.)
SUPPORT:
None received
OPPOSITION:
None received
-- END --